Contractor dossier
234 projects on file, including joint ventures this contractor is part of.
Total projects
234
Total budget
₱21.2B
Average progress
92.3%
Completion rate
74.4%
Average risk score
56.1
Medium risk on average, out of 100
Flagged as unusual
29
12.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 92 | ₱6.3B | 58.1 | 10 | 93.7% |
| Region IV-B | 67 | ₱7.9B | 52.9 | 10 | 90.7% |
| Region III | 12 | ₱945.7M | 53.0 | 0 | 94.7% |
| Region II | 11 | ₱1.1B | 55.8 | 0 | 100.0% |
| Negros Island Region | 11 | ₱701.2M | 54.5 | 1 | 84.9% |
| Region VII | 7 | ₱1.3B | 65.5 | 5 | 82.5% |
| Region IV-A | 7 | ₱702.9M | 60.8 | 0 | 98.4% |
| Region XI | 6 | ₱539.6M | 57.3 | 0 | 90.0% |
| Region XII | 5 | ₱479.6M | 65.9 | 3 | 72.3% |
| Region XIII | 4 | ₱385.9M | 43.5 | 0 | 100.0% |
| Cordillera Administrative Region | 3 | ₱237.6M | 56.2 | 0 | 100.0% |
| National Capital Region | 3 | ₱130.6M | 52.2 | 0 | 100.0% |
| Region VIII | 2 | ₱282.8M | 63.7 | 0 | 86.0% |
| Region X | 2 | ₱168.3M | 54.6 | 0 | 100.0% |
| Region I | 2 | ₱98M | 47.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 101 | ₱11.2B | 56.6 | 16 | 90.1% |
| Roads | 87 | ₱7.8B | 54.1 | 3 | 95.8% |
| Bridges | 21 | ₱695.7M | 53.6 | 2 | 89.5% |
| OTHER | 13 | ₱1.3B | 79.2 | 7 | 86.0% |
| Buildings and Facilities | 12 | ₱251.1M | 45.6 | 1 | 97.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24F00441CAPITAL OUTLAY - DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) - LGU HOSPITALS-CAMARINES NORTE PROVINCIAL HOSPITAL, CAMARINES NORTE, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱39.4M | 93% | High risk85 | Flagged0.038 |
| 24F00383CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES-CONSTRUCTION OF CAMARINES NORTE PROVINCIAL HOSPITAL, DAET, CAMARINES NORTE | Region V | Region V | On-Going | ₱216.7M | 75% | High risk82 | Flagged0.022 |
| 24MC0045CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 46 + 900 - STA. 47 + 125 R/S, BARANGAY INAC, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 32% | High risk82 | Flagged0.035 |
| 24MC0043CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 45 + 642 - STA. 46 + 292 R/S (PHASE II), BARANGAY ALEGRIA, PRES. ROXAS, COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 92% | High risk82 | Flagged0.018 |
| 24CL0163CONSTRUCTION OF SANTO TOMAS RIVER FLOOD CONTROL STRUCTURE, UPSTREAM, PACKAGE 10, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱94.1M | 97% | High risk82 | —-0.014 |
| 24MC0047CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 48 + 944 - STA. 49 + 284 R/S, BARANGAY INAC, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 38% | High risk81 | Flagged0.032 |
| 23HK0065SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. TALUNGON, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 17F00015MFO1-IMPROVEMENT/WIDENING OF NATIONAL ROADS-OTHER PRIMARY ROADS:ROLANDO A. ANDAYA HIGHWAY, K0336+496.00-K0341+637.00 WITH EXCEPTIONS, SIPOCOT, CAMARINES SUR PROVINCE | Region V | Region V | Completed | ₱130.7M | 100% | High risk81 | —-0.013 |
| 24CL0061CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 4, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.046 |
| 23H00046OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, BAGUMBAYAN SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱217.1M | 89% | High risk78 | Flagged0.043 |
| 19F00115REPAIR AND MAINTENANCE OF LABO REVETMENT BRGY. ANAHAW, LABO, CAMARINES NORTE, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱108.1M | 0% | High risk78 | Flagged0.064 |
| 24F00495ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0510+665-K0510+815, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱159.1M | 38% | High risk78 | Flagged0.018 |
| 16F00084DAET-TALOBATIB-BATOBALANI-PARACALE ROAD LEADING TO CALAGUAS ISLAND(MAHABANG BUHANGIN) PULANG DAGA BEACH & SENAKULO BEACH TO GUMAUS BEACH AND BULALAKAO BEACH, PARACALE, CAMARINES NORTE | Region V | Region V | Completed | ₱96.5M | 100% | High risk77 | —-0.022 |
| 17FF0020OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG LAGONOY-PRESENTACION ROAD (PAVING OF SHOULDER WITH DRAINAGE IMPROVEMENT AND ROAD SAFETY FEATURES) BINANUAHAN-BALIWAG SECTION, LAGONOY, CAMARINES SUR K0498+(-817)-K0498+870;K0499+360-K0501+532 | Region V | Camarines Sur 4th DEO | Completed | ₱46.4M | 100% | High risk76 | —-0.035 |
| 16F00085MAINTENANCE & CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURE, CONST./IMPV'T. OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, DAET-LABO-TULAY NA LUPA ROAD INCLUDING CALABASA-TALOBATIB ROAD, LABO, CAMARINES NORTE | Region V | Region V | Completed | ₱72.4M | 100% | High risk76 | —-0.027 |
| 17FG0030INDV. PROJ. REHABILITATION/CONCRETE PAVING OF DAO STREET, STO. DOMINGO-LA PURISIMA ROAD, IRIGA CITY STA. 0+000 - STA. 1+317 | Region V | Camarines Sur 5th DEO | Completed | ₱18.1M | 100% | High risk76 | —-0.036 |
| 25F00077ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TALISAY RIVER, PACKAGE 2, BARANGA | Region V | Region V | On-Going | ₱237.4M | 92% | High risk75 | Flagged0.003 |
| 25F00251ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT BR. ALONG MAHARLIKA HIGHWAY (LZ) (PACKAGE 3), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱153.5M | 0% | High risk73 | Flagged0.028 |
| 16F00149RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: BARIT RIVER (UPSTREAM CRESCINI BRIDGE), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱82.5M | 99% | High risk73 | Flagged0.058 |
| 25F00249ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT ALONG MAHARLIKA HIGHWAY, CAMARINES SUR (PACKAGE 1), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱101.5M | 0% | High risk73 | Flagged0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19F00115REPAIR AND MAINTENANCE OF LABO REVETMENT BRGY. ANAHAW, LABO, CAMARINES NORTE, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱108.1M | 0% | High risk78 | Flagged0.064 |
| 16F00149RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: BARIT RIVER (UPSTREAM CRESCINI BRIDGE), IRIGA CITY, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱82.5M | 99% | High risk73 | Flagged0.058 |
| 23H00046OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, BAGUMBAYAN SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱217.1M | 89% | High risk78 | Flagged0.043 |
| 24F00441CAPITAL OUTLAY - DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) - LGU HOSPITALS-CAMARINES NORTE PROVINCIAL HOSPITAL, CAMARINES NORTE, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱39.4M | 93% | High risk85 | Flagged0.038 |
| 23E00242SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- REPAIR/REHAB. OF DAMAGED/COLLAPSED FLOOD CONTROL STRUCTURE ALONG MOGPOG RIVER, BRGY. CANDAHON-POBLACION, MOGPOG, MARIND | Region IV-B | Region IV-B | On-Going | ₱93.1M | 78% | High risk67 | Flagged0.037 |
| 23E00243SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- REPAIR/REHAB. OF DAMAGED/COLLAPSED FLOOD CONTROL STRUCTURE ALONG LAPU-LAPU RIVER, BRGY. MAHARLIKA 1ST ZONE SECTION, STA. | Region IV-B | Region IV-B | On-Going | ₱96.5M | 83% | High risk66 | Flagged0.037 |
| 23E00241SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE/ESPLANADE ALONG MOGPOG RIVER, BRGY. CANDAHON SECTION, MOGPOG, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱96.5M | 86% | High risk66 | Flagged0.036 |
| 24MC0045CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 46 + 900 - STA. 47 + 125 R/S, BARANGAY INAC, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 32% | High risk82 | Flagged0.035 |
| 24MC0047CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 48 + 944 - STA. 49 + 284 R/S, BARANGAY INAC, MAGPET, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 38% | High risk81 | Flagged0.032 |
| 25F00251ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT BR. ALONG MAHARLIKA HIGHWAY (LZ) (PACKAGE 3), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱153.5M | 0% | High risk73 | Flagged0.028 |
| 24F00383CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES-CONSTRUCTION OF CAMARINES NORTE PROVINCIAL HOSPITAL, DAET, CAMARINES NORTE | Region V | Region V | On-Going | ₱216.7M | 75% | High risk82 | Flagged0.022 |
| 25F00249ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT ALONG MAHARLIKA HIGHWAY, CAMARINES SUR (PACKAGE 1), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱101.5M | 0% | High risk73 | Flagged0.019 |
| 24MC0043CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER STA. 45 + 642 - STA. 46 + 292 R/S (PHASE II), BARANGAY ALEGRIA, PRES. ROXAS, COTABATO (REPUBLISHED) | Region XII | Cotabato 2nd DEO | On-Going | ₱95.5M | 92% | High risk82 | Flagged0.018 |
| 24F00495ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0510+665-K0510+815, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱159.1M | 38% | High risk78 | Flagged0.018 |
| 23H00022OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, VALLADOLID SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱214.7M | 67% | High risk67 | Flagged0.016 |
| 23H00023OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURURE, GOTOZAN SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱215M | 64% | High risk67 | Flagged0.016 |
| 23HK0065SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. TALUNGON, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 24E00006BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SHORE PROTECTION, SANTA CRUZ, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱239.9M | 63% | High risk67 | Flagged0.011 |
| 25F00388CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, PALASPAS, DEL GALLE | Region V | Region V | On-Going | ₱178.2M | 4% | High risk72 | Flagged0.009 |
| 17FE0097CONSTRUCTION OF TWO (2) UNITS FOUR (4) STOREY TWENTY FOUR (24) CLASSROOM SENIOR HIGH SCHOOL BUILDING,(UNDER DEPED CY 2016 BEFF BATCH 11) CAMARINES SUR NATIONAL HIGH SCHOOL (LIBOTON ANNEX) , NAGA CITY,CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱102.5M | 100% | Medium risk53 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 22AF0050SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - REHABILITATION OF ROAD SLIPS, SLOPE COLLAPSE AND LANDSLIDE, NAGUILIAN-BAGULIN ROAD , STA.006+957 -STA.007+047, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.084 |
| 177 | 22AF0051SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - REHABILITATION OF ROAD SLIPS, SLOPE COLLAPSE AND LANDSLIDE, NAGUILIAN - BAGULIN ROAD , STA.007+223 - STA.007+500, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.084 |
| 178 | 19FN0072CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY SAN RAFAEL, RAGAY, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.099 |
| 179 | 19FN0063CONSTRUCTION OF YABO RIVER REVETMENT, NORTH VILLAZAR AND SOOC SECTION, SIPOCOT AND LUPI, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱45.8M | 100% | Medium risk47 | —-0.086 |
| 180 | 18FC0069FLOOD MITIGATION PROGRAM: CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONST. | Region V | Camarines Norte DEO | Completed | ₱23.5M | 100% | Medium risk47 | —-0.085 |
| 181 | 18FD0029CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIKE WITHIN BICOL RIVER BASIN, BRGY. BAGUMBAYAN, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱37.4M | 100% | Medium risk46 | —-0.087 |
| 182 | 18FD0030CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIKE WITHIN BICOL RIVER BASIN, BRGY. BIGAJO NORTE, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱37.3M | 100% | Medium risk46 | —-0.087 |
| 183 | 18FE0007ORGANIZATIONAL OUTCOME 2:PROTECT ;LIVES AND PROPERTIES AGAINST MAJOR FLOOD- FLOOD MANAGEMENT PROGRAM CONSTRUCTION /REHABILITATION /IMPROVEMENT OF CADLAN CREEK BRGY. CADLAN PILI CAMARINES SUR 3RD LD | Region V | Camarines Sur 3rd DEO | Completed | ₱18.5M | 100% | Medium risk46 | —-0.087 |
| 184 | 21HK0123ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM : REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS @ BAIS - KABANKALAN ROAD K0056+850-K0056+950, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱27M | 100% | Medium risk45 | —-0.091 |
| 185 | 22HK0091ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM : REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS @ BAIS-KABANKALAN ROAD K0060+700-K0060+800, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱20M | 100% | Medium risk45 | —-0.092 |
| 186 | 21HK0111ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM: REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS @ BAIS - KABANKALAN ROAD K0056+300 - K0056+350, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱13.5M | 100% | Medium risk44 | —-0.091 |
| 187 | 17FD0045CONST. OF BRGY. IRAYANG SOLONG FMR, BRGY. IRAYANG SOLONG, MINALABAC, CAM. SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱4.7M | 100% | Medium risk43 | —-0.013 |
| 188 | 17FD0052CONST. OF BRGY. SAN ISIDRO-BRGY. PALANGON-BRGY. ASLONG FMR, BRGYS. SAN ISIDRO, PALANGON AND ASLONG, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱4.7M | 100% | Medium risk43 | —-0.011 |
| 189 | 20EB0053CONSTRUCTION OF FLOOD CONTROL STRUCTURES BUSUANGA RIVER SAN AGUSTIN SECTION, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱48.7M | 100% | Medium risk43 | —-0.068 |
| 190 | 20EB0049CONSTRUCTION OF FLOOD CONTROL PROJECT, BUSUANGA RIVER (ADELA SECTION, RIZAL, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.053 |
| 191 | 20EB0052CONSTRUCTION OF FLOOD CONTROL STRUCTURES BUSUANGA RIVER CENTRAL SECTION, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.061 |
| 192 | 20EB0009CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG MINDORO WEST COASTAL RD - K0446+300 - K0446+380 | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.081 |
| 193 | 19EB0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF ANAHAWIN FLOOD CONTROL (AKASYAHAN SECTION), CALINTAAN, OCCIDENTAL MINDORO, CALINTAAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.073 |
| 194 | 22NI0070REHABILITATION AND ROAD SLOPE PROTECTION STRUCTURES ALONG BISLIG-TRENTO ROAD, K1500+300-K1500+700 | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱96.5M | 100% | Medium risk43 | —-0.064 |
| 195 | 23M00011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE -KIDAPAWAN-ILOMAVIS TOURIST RD K1636 + 020 - K1636 + 240, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Region XII | Completed | ₱96.5M | 100% | Medium risk43 | —-0.075 |
| 196 | 20EB0011CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG TAGBAC-LUBANG-LOOC RD - K0034+650 - K0034+760 | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.084 |
| 197 | 20EB0010CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG BULALACAO-SN JOSE-JCT MAPAYA RD - K0221+230 - K0221+605 | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk43 | —-0.081 |
| 198 | 20EB0055CONSTRUCTION OF FLOOD CONTROL STRUCTURE AMNAY RIVER KABANGKALAN SECTION, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱48.7M | 100% | Medium risk42 | —-0.068 |
| 199 | 20EB0056CONSTRUCTION OF FLOOD CONTROL STRUCTURE AMNAY RIVER PAG-ASA SECTION, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱48.7M | 100% | Medium risk42 | —-0.068 |
| 200 | 20EB0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE MOMPONG RIVER MALISBONG SECTION, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱49M | 100% | Medium risk42 | —-0.070 |