Contractor dossier
211 projects on file, including joint ventures this contractor is part of.
Total projects
211
Total budget
₱11.9B
Average progress
79.5%
Completion rate
40.8%
Below 70%
Average risk score
59.0
Medium risk on average, out of 100
Flagged as unusual
34
16.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 205 | ₱11.6B | 59.8 | 33 | 79.1% |
| Region XII | 6 | ₱255.6M | 34.5 | 1 | 94.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 126 | ₱8.3B | 62.2 | 8 | 77.1% |
| Buildings and Facilities | 42 | ₱704.2M | 40.2 | 5 | 93.0% |
| Flood Control and Drainage | 16 | ₱1.4B | 67.8 | 4 | 80.0% |
| Bridges | 13 | ₱515M | 55.6 | 4 | 77.4% |
| OTHER | 11 | ₱791.3M | 81.4 | 11 | 61.5% |
| Water Provision and Storage | 2 | ₱150.4M | 67.5 | 1 | 88.4% |
| GAA 2025 SSP | 1 | ₱41.5M | 93.9 | 1 | 28.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00080REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱41.5M | 28% | High risk94 | Flagged0.031 |
| 24JK0004CONSTRUCTION OF ZAMBOANGA CITY R.T. LIM BOULEVARD, PACKAGE 1, ZAMBOANGA CITY | Region IX | Zamboanga City 1st DEO | On-Going | ₱98.3M | 22% | High risk92 | Flagged0.083 |
| 23JA0117BASIC INFRASTRUCTURE PROGRAM (B.I.P)- MULTIPURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION (COMPLETION) OF MPB COVERED COURT AT TAGASILAY ELEMENTARY SCHOOL, BARANGAY TAGASILAY, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱4.9M | 90% | High risk87 | Flagged0.050 |
| 23J00071CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 4 (MAMPANG BRIDGE) MAMPANG, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.2M | 73% | High risk84 | Flagged0.037 |
| 24J00153CONSTRUCTION OF MAMPANG - RIO HONDO COASTAL ROAD, ZAMBOANGA CITY (PACKAGE 4) | Region IX | Region IX | On-Going | ₱98.9M | 36% | High risk84 | Flagged0.033 |
| 22J00087CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.1M | 17% | High risk84 | Flagged0.057 |
| 22J00063NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SUMAGDANG - MENZI - LANOTE BYPASS ROAD (PACKAGE 1) (COMPLETION OF AGUADA BRIDGE) | Region IX | Region IX | On-Going | ₱99.6M | 75% | High risk83 | Flagged0.044 |
| 24J00007CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 7, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱82.3M | 43% | High risk81 | Flagged0.027 |
| 24J00151SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱69.9M | 70% | High risk81 | Flagged0.022 |
| 24M00056ROAD WIDENING ALONG COTABATO-LANAO RD - K1860 + 558 - K1863 + 058, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱101.3M | 79% | High risk80 | Flagged0.021 |
| 24JA0079CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BUNGUIAO ES, BARANGAY BUNGUIAO, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱14.8M | 70% | High risk79 | Flagged0.017 |
| 23J00167CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE TUMAGA RIVER (TETUAN-TUGBUNGAN SECTION), PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 57% | High risk76 | Flagged0.006 |
| 23J00168INSTALLATION OF ROAD SAFETY DEVICES, PAGADIAN CITY - ZAMBOANGA CITY RD (LICOMO-PUTIK ROAD) - K1889 + 000 - K1927 + 000, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 51% | High risk75 | —-0.009 |
| 23J00171ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BUNGUIAO-TOLOSA-LAPAKAN BYPASS ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 58% | High risk75 | —-0.011 |
| 23J00172ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BUNGUIAO - QUINIPUT ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 62% | High risk75 | —-0.011 |
| 23J00170SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STUDS LIGHTS ALONG PAGADIAN CITY-ZAMBOANGA CITY RD, (LICOMO-PUTIK ROAD), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 85% | High risk75 | —-0.017 |
| 24J00009CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - NRJ LAPAKAN-LAMISAHAN-VICTORIA BY-PASS ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱141.4M | 49% | High risk75 | —-0.013 |
| 23J00174ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MUTI-BUENAVISTA BYPASS ROAD, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 60% | High risk75 | —-0.010 |
| 23J00161REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY RD | Region IX | Region IX | On-Going | ₱144.6M | 70% | High risk75 | —-0.014 |
| 21J00044CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH ESPLANADE AT LIMPAPA RIVER, ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD (LIMPAPA BRIDGE SECTION) | Region IX | Region IX | On-Going | ₱95.7M | 100% | High risk75 | —-0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JK0004CONSTRUCTION OF ZAMBOANGA CITY R.T. LIM BOULEVARD, PACKAGE 1, ZAMBOANGA CITY | Region IX | Zamboanga City 1st DEO | On-Going | ₱98.3M | 22% | High risk92 | Flagged0.083 |
| 22J00087CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.1M | 17% | High risk84 | Flagged0.057 |
| 23JA0117BASIC INFRASTRUCTURE PROGRAM (B.I.P)- MULTIPURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION (COMPLETION) OF MPB COVERED COURT AT TAGASILAY ELEMENTARY SCHOOL, BARANGAY TAGASILAY, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱4.9M | 90% | High risk87 | Flagged0.050 |
| 24J00280IMPLEMENTATION AND MONITORING OF PAMANA PROJECT - CONSTRUCTION OF WATER SYSTEM LEVEL II, SITIO TEGGEP, BARANGAY MASOLA, SAMPINIT COMPLEX, ISABELA CITY, BASILAN | Region IX | Region IX | On-Going | ₱9.9M | 77% | High risk70 | Flagged0.048 |
| 22J00063NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SUMAGDANG - MENZI - LANOTE BYPASS ROAD (PACKAGE 1) (COMPLETION OF AGUADA BRIDGE) | Region IX | Region IX | On-Going | ₱99.6M | 75% | High risk83 | Flagged0.044 |
| 24J00278IMPLEMENTATION AND MONITORING OF PAMANA PROJECT - CONCRETING OF MULTI-PURPOSE BUILDING, SAMPINIT BASILAN | Region IX | Region IX | On-Going | ₱9.9M | 24% | Medium risk45 | Flagged0.039 |
| 23J00071CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 4 (MAMPANG BRIDGE) MAMPANG, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.2M | 73% | High risk84 | Flagged0.037 |
| 16JH0101CONSTRUCTION OF 3-UNITS 4-STOREY 20-CL SCHOOL BUILDING @ BASILAN NATIONAL HIGH SCHOOL, ISABELA CITY, BASILAN PROVINCE | Region IX | Isabela City DEO | Completed | ₱107.3M | 100% | Medium risk56 | Flagged0.036 |
| 24JA0172CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MERCEDES RIVER, PACKAGE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱47.7M | 29% | High risk67 | Flagged0.035 |
| 20JH0063CONCRETING OF BRGY. CALVARIO FMR, ISABELA CITY, BASILAN | Region IX | Isabela City DEO | On-Going | ₱19.8M | 100% | Medium risk58 | Flagged0.035 |
| 24J00153CONSTRUCTION OF MAMPANG - RIO HONDO COASTAL ROAD, ZAMBOANGA CITY (PACKAGE 4) | Region IX | Region IX | On-Going | ₱98.9M | 36% | High risk84 | Flagged0.033 |
| 24JA0154CONSTRUCTION OF VETERANS-GUADALUPE-CABATO ROAD, ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 0% | High risk62 | Flagged0.032 |
| 25J00080REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱41.5M | 28% | High risk94 | Flagged0.031 |
| 24J00007CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 7, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱82.3M | 43% | High risk81 | Flagged0.027 |
| 24JH0030CONSTRUCTION OF CONCRETE BRIDGE - BUSAY BR. ALONG ISABELA-LAMITAN ROAD | Region IX | Isabela City DEO | On-Going | ₱28.9M | 0% | High risk62 | Flagged0.027 |
| 24JA0108CONSTRUCTION OF 4-STOREY, 20-CLASSROOM SCHOOL BUILDING AT VITALI NATIONAL HIGH SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱67M | 36% | Medium risk58 | Flagged0.026 |
| 24JA0126CONCRETING OF BRGY. LUMAYANG FMR, BRGY. LUMAYANG ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱14.9M | 20% | High risk61 | Flagged0.024 |
| 24J00151SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱69.9M | 70% | High risk81 | Flagged0.022 |
| 24JA0111CONSTRUCTION OF 4 STOREY, 20 CLASSROOMS SCHOOL BUILDING AT BUENAVISTA INTEGRATED SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱63.7M | 70% | Medium risk58 | Flagged0.021 |
| 24M00056ROAD WIDENING ALONG COTABATO-LANAO RD - K1860 + 558 - K1863 + 058, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱101.3M | 79% | High risk80 | Flagged0.021 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23JH0019CONSTRUCTION OF ROAD, BARANGAY DIKI TO BARANGAY LUKBUTON LEADING TO WHITEBEACH, MALAMAWI ISLAND, ISABELA CITY, BASILAN | Region IX | Isabela City DEO | On-Going | ₱72.4M | 100% | High risk65 | —-0.034 |
| 77 | 19J00080LOCAL PROGRAM WATER MANAGEMENT FACILITIES WATER SUPPLY CONSTRUCTION OF WATER SUPPLY, ISABELA CITY, BASILAN | Region IX | Region IX | Completed | ₱140.4M | 100% | High risk65 | —-0.008 |
| 78 | 23J00075CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - EASTSIDE - BINUANGAN COASTAL BY-PASS ROAD, BASILAN | Region IX | Region IX | On-Going | ₱67.3M | 60% | High risk65 | —-0.024 |
| 79 | 22J00082ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱87.2M | 63% | High risk64 | —-0.005 |
| 80 | 20J00173CONSTRUCTION OF BYPASS ROAD FROM BARANGAY LIMOOK EMERGENCY HOSPITAL - BARANGAY MALIGAYA ISLA VERDE - BARANGAY MAGANDA JUNCTION NATIONAL HIGHWAY, LAMITAN CITY, BASILAN | Region IX | Region IX | Completed | ₱56.8M | 100% | High risk64 | —-0.061 |
| 81 | 24J00045CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SUMAGDANG - MENZI - LANOTE BYPASS ROAD, ISABELA CITY | Region IX | Region IX | On-Going | ₱72.1M | 63% | High risk63 | —-0.026 |
| 82 | 20JH0011ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS BASILAN CIRCUMFERENTIAL ROAD (S00005BL) K 0003+300 K 0003+450 (LS), K 0003+300 K 0003+600, SLOPE PROTECTION WORKS (GROUTED RIPR | Region IX | Isabela City DEO | Completed | ₱68.9M | 100% | High risk63 | —-0.071 |
| 83 | 20JH0012ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS BASILAN CIRCUMFERENTIAL ROAD (S00005BL) K 0008+800 K 0009+050, SLOPE PROTECTION WORKS (GROUTED RIPRAP/STONE MASONRY) (L/S), ISABE | Region IX | Isabela City DEO | Completed | ₱84.4M | 100% | High risk63 | —-0.062 |
| 84 | 22JH0012ROAD WIDENING ALONG BASILAN CIRCUMFERENTIAL ROAD K 0020+100 - K 0022+100 | Region IX | Isabela City DEO | On-Going | ₱82M | 100% | High risk63 | —-0.017 |
| 85 | 24J00107ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY RD - K1900 + 640 - K1901 + 500, K1902 + 269.99 - K1902 + 314.98, K1902 + 346.09 - K1902 + 422.66 | Region IX | Region IX | On-Going | ₱50M | 71% | High risk63 | —-0.036 |
| 86 | 23JH0040CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SENGAL, LAMITAN CITY, BASILAN | Region IX | Isabela City DEO | On-Going | ₱67.5M | 100% | High risk63 | —-0.027 |
| 87 | 24JA0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA11239 INSTALLATION OF SOLAR STREETLIGHTS ALONG ACCESS ROAD LEADING TO PANUBIGAN WHARF (PHASE 2) ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48.8M | 95% | High risk63 | —-0.039 |
| 88 | 24JA0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA11239 INSTALLATION OF SOLAR STREETLIGHTS ALONG ACCESS ROAD LEADING TO PANUBIGAN WHARF (PHASE 1) ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48.6M | 95% | High risk63 | —-0.040 |
| 89 | 23J00018REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS - PAGADIAN CITY-ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱48.1M | 93% | High risk63 | —-0.034 |
| 90 | 24JH0030CONSTRUCTION OF CONCRETE BRIDGE - BUSAY BR. ALONG ISABELA-LAMITAN ROAD | Region IX | Isabela City DEO | On-Going | ₱28.9M | 0% | High risk62 | Flagged0.027 |
| 91 | 20JH0023ROAD WIDENING INCLUDING DRAINAGE ALONG BASILAN CIRCUMFERENTIAL ROAD (TUMAHUBONG-SUMISIP-MALUSO ROAD SECTION) STA. 73+400 - STA. 74+900 | Region IX | Isabela City DEO | Completed | ₱59.2M | 100% | High risk62 | —-0.073 |
| 92 | 21JA0029CONSTRUCTION OF REVETMENT ALONG LIMPAPA RIVER, BARANGAY LIMPAPA, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱24.1M | 100% | High risk62 | Flagged0.008 |
| 93 | 24JA0154CONSTRUCTION OF VETERANS-GUADALUPE-CABATO ROAD, ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 0% | High risk62 | Flagged0.032 |
| 94 | 22JH0013ROAD WIDENING ALONG BASILAN CIRCUMFERENTIAL ROAD K 0067+320 - K 0069+320 | Region IX | Isabela City DEO | Completed | ₱69.9M | 100% | High risk62 | —-0.059 |
| 95 | 24JA0126CONCRETING OF BRGY. LUMAYANG FMR, BRGY. LUMAYANG ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱14.9M | 20% | High risk61 | Flagged0.024 |
| 96 | 22JH0032WIDENING OF PERMANENT BRIDGE AT BALAGTASAN BRIDGE (B00010BL) ALONG BASILAN CIRCUMFERENTIAL ROAD | Region IX | Isabela City DEO | On-Going | ₱53.1M | 100% | High risk61 | —-0.008 |
| 97 | 19JH0016CONSTRUCTION OF CONCRETE ROAD, CONSTRUCTION OF SUMAGDANG COASTAL HIGHWAY, ISABELA CITY, BASILAN | Region IX | Isabela City DEO | Completed | ₱48M | 100% | High risk61 | —-0.071 |
| 98 | 23J00053CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱43.1M | 55% | High risk60 | —-0.024 |
| 99 | 25JA0029CONSTRUCTION OF MULTI-PURPOSE BUILDING(COVERED COURT), BARANGAY TUGBUNGAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48M | 34% | High risk60 | —-0.025 |
| 100 | 21JA0063CONSTRUCTION OF ROAD FROM JUNCTION OF NATIONAL HIGHWAY TO BARANGAY LAPAKAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱46.2M | 100% | High risk60 | —-0.072 |