Contractor dossier
211 projects on file, including joint ventures this contractor is part of.
Total projects
211
Total budget
₱11.9B
Average progress
79.5%
Completion rate
40.8%
Below 70%
Average risk score
59.0
Medium risk on average, out of 100
Flagged as unusual
34
16.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IX | 205 | ₱11.6B | 59.8 | 33 | 79.1% |
| Region XII | 6 | ₱255.6M | 34.5 | 1 | 94.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 126 | ₱8.3B | 62.2 | 8 | 77.1% |
| Buildings and Facilities | 42 | ₱704.2M | 40.2 | 5 | 93.0% |
| Flood Control and Drainage | 16 | ₱1.4B | 67.8 | 4 | 80.0% |
| Bridges | 13 | ₱515M | 55.6 | 4 | 77.4% |
| OTHER | 11 | ₱791.3M | 81.4 | 11 | 61.5% |
| Water Provision and Storage | 2 | ₱150.4M | 67.5 | 1 | 88.4% |
| GAA 2025 SSP | 1 | ₱41.5M | 93.9 | 1 | 28.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25J00080REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱41.5M | 28% | High risk94 | Flagged0.031 |
| 24JK0004CONSTRUCTION OF ZAMBOANGA CITY R.T. LIM BOULEVARD, PACKAGE 1, ZAMBOANGA CITY | Region IX | Zamboanga City 1st DEO | On-Going | ₱98.3M | 22% | High risk92 | Flagged0.083 |
| 23JA0117BASIC INFRASTRUCTURE PROGRAM (B.I.P)- MULTIPURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION (COMPLETION) OF MPB COVERED COURT AT TAGASILAY ELEMENTARY SCHOOL, BARANGAY TAGASILAY, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱4.9M | 90% | High risk87 | Flagged0.050 |
| 23J00071CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 4 (MAMPANG BRIDGE) MAMPANG, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.2M | 73% | High risk84 | Flagged0.037 |
| 24J00153CONSTRUCTION OF MAMPANG - RIO HONDO COASTAL ROAD, ZAMBOANGA CITY (PACKAGE 4) | Region IX | Region IX | On-Going | ₱98.9M | 36% | High risk84 | Flagged0.033 |
| 22J00087CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.1M | 17% | High risk84 | Flagged0.057 |
| 22J00063NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SUMAGDANG - MENZI - LANOTE BYPASS ROAD (PACKAGE 1) (COMPLETION OF AGUADA BRIDGE) | Region IX | Region IX | On-Going | ₱99.6M | 75% | High risk83 | Flagged0.044 |
| 24J00007CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 7, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱82.3M | 43% | High risk81 | Flagged0.027 |
| 24J00151SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱69.9M | 70% | High risk81 | Flagged0.022 |
| 24M00056ROAD WIDENING ALONG COTABATO-LANAO RD - K1860 + 558 - K1863 + 058, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱101.3M | 79% | High risk80 | Flagged0.021 |
| 24JA0079CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BUNGUIAO ES, BARANGAY BUNGUIAO, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱14.8M | 70% | High risk79 | Flagged0.017 |
| 23J00167CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE TUMAGA RIVER (TETUAN-TUGBUNGAN SECTION), PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 57% | High risk76 | Flagged0.006 |
| 23J00168INSTALLATION OF ROAD SAFETY DEVICES, PAGADIAN CITY - ZAMBOANGA CITY RD (LICOMO-PUTIK ROAD) - K1889 + 000 - K1927 + 000, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 51% | High risk75 | —-0.009 |
| 23J00171ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BUNGUIAO-TOLOSA-LAPAKAN BYPASS ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 58% | High risk75 | —-0.011 |
| 23J00172ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BUNGUIAO - QUINIPUT ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 62% | High risk75 | —-0.011 |
| 23J00170SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STUDS LIGHTS ALONG PAGADIAN CITY-ZAMBOANGA CITY RD, (LICOMO-PUTIK ROAD), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 85% | High risk75 | —-0.017 |
| 24J00009CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - NRJ LAPAKAN-LAMISAHAN-VICTORIA BY-PASS ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱141.4M | 49% | High risk75 | —-0.013 |
| 23J00174ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MUTI-BUENAVISTA BYPASS ROAD, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱144.6M | 60% | High risk75 | —-0.010 |
| 23J00161REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY RD | Region IX | Region IX | On-Going | ₱144.6M | 70% | High risk75 | —-0.014 |
| 21J00044CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH ESPLANADE AT LIMPAPA RIVER, ZAMBOANGA CITY - LABUAN - LIMPAPA ROAD (LIMPAPA BRIDGE SECTION) | Region IX | Region IX | On-Going | ₱95.7M | 100% | High risk75 | —-0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JK0004CONSTRUCTION OF ZAMBOANGA CITY R.T. LIM BOULEVARD, PACKAGE 1, ZAMBOANGA CITY | Region IX | Zamboanga City 1st DEO | On-Going | ₱98.3M | 22% | High risk92 | Flagged0.083 |
| 22J00087CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱96.1M | 17% | High risk84 | Flagged0.057 |
| 23JA0117BASIC INFRASTRUCTURE PROGRAM (B.I.P)- MULTIPURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION (COMPLETION) OF MPB COVERED COURT AT TAGASILAY ELEMENTARY SCHOOL, BARANGAY TAGASILAY, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱4.9M | 90% | High risk87 | Flagged0.050 |
| 24J00280IMPLEMENTATION AND MONITORING OF PAMANA PROJECT - CONSTRUCTION OF WATER SYSTEM LEVEL II, SITIO TEGGEP, BARANGAY MASOLA, SAMPINIT COMPLEX, ISABELA CITY, BASILAN | Region IX | Region IX | On-Going | ₱9.9M | 77% | High risk70 | Flagged0.048 |
| 22J00063NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SUMAGDANG - MENZI - LANOTE BYPASS ROAD (PACKAGE 1) (COMPLETION OF AGUADA BRIDGE) | Region IX | Region IX | On-Going | ₱99.6M | 75% | High risk83 | Flagged0.044 |
| 24J00278IMPLEMENTATION AND MONITORING OF PAMANA PROJECT - CONCRETING OF MULTI-PURPOSE BUILDING, SAMPINIT BASILAN | Region IX | Region IX | On-Going | ₱9.9M | 24% | Medium risk45 | Flagged0.039 |
| 23J00071CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 4 (MAMPANG BRIDGE) MAMPANG, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.2M | 73% | High risk84 | Flagged0.037 |
| 16JH0101CONSTRUCTION OF 3-UNITS 4-STOREY 20-CL SCHOOL BUILDING @ BASILAN NATIONAL HIGH SCHOOL, ISABELA CITY, BASILAN PROVINCE | Region IX | Isabela City DEO | Completed | ₱107.3M | 100% | Medium risk56 | Flagged0.036 |
| 24JA0172CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MERCEDES RIVER, PACKAGE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱47.7M | 29% | High risk67 | Flagged0.035 |
| 20JH0063CONCRETING OF BRGY. CALVARIO FMR, ISABELA CITY, BASILAN | Region IX | Isabela City DEO | On-Going | ₱19.8M | 100% | Medium risk58 | Flagged0.035 |
| 24J00153CONSTRUCTION OF MAMPANG - RIO HONDO COASTAL ROAD, ZAMBOANGA CITY (PACKAGE 4) | Region IX | Region IX | On-Going | ₱98.9M | 36% | High risk84 | Flagged0.033 |
| 24JA0154CONSTRUCTION OF VETERANS-GUADALUPE-CABATO ROAD, ZAMBOANGA CITY PACKAGE 1 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱38.6M | 0% | High risk62 | Flagged0.032 |
| 25J00080REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (LANAO-PAGADIAN-ZAMBOANGA CITY RD) | Region IX | Region IX | On-Going | ₱41.5M | 28% | High risk94 | Flagged0.031 |
| 24J00007CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ZAMBOANGA CITY DIVERSION ROAD, PACKAGE 7, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱82.3M | 43% | High risk81 | Flagged0.027 |
| 24JH0030CONSTRUCTION OF CONCRETE BRIDGE - BUSAY BR. ALONG ISABELA-LAMITAN ROAD | Region IX | Isabela City DEO | On-Going | ₱28.9M | 0% | High risk62 | Flagged0.027 |
| 24JA0108CONSTRUCTION OF 4-STOREY, 20-CLASSROOM SCHOOL BUILDING AT VITALI NATIONAL HIGH SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱67M | 36% | Medium risk58 | Flagged0.026 |
| 24JA0126CONCRETING OF BRGY. LUMAYANG FMR, BRGY. LUMAYANG ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱14.9M | 20% | High risk61 | Flagged0.024 |
| 24J00151SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱69.9M | 70% | High risk81 | Flagged0.022 |
| 24JA0111CONSTRUCTION OF 4 STOREY, 20 CLASSROOMS SCHOOL BUILDING AT BUENAVISTA INTEGRATED SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱63.7M | 70% | Medium risk58 | Flagged0.021 |
| 24M00056ROAD WIDENING ALONG COTABATO-LANAO RD - K1860 + 558 - K1863 + 058, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱101.3M | 79% | High risk80 | Flagged0.021 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 24JA0116CONCRETING OF BRGY. CALABASA FMR, BRGY. CALABASA ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱14.9M | 75% | High risk60 | Flagged0.009 |
| 102 | 23J00129REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS - PAGADIAN CITY-ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱42.1M | 82% | High risk60 | —-0.033 |
| 103 | 22JA0057CONSTRUCTION OF BY-PASS AND DIVERSION ROADS NRJ LAPAKAN-LAMISAHAN-VICTORIA BY-PASS ROAD PACKAGE 2, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱41.8M | 84% | High risk60 | —-0.023 |
| 104 | 22JA0058CONSTRUCTION OF BY-PASS AND DIVERSION ROADS NRJ LAPAKAN-LAMISAHAN-VICTORIA BY-PASS ROAD PACKAGE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱40.3M | 95% | High risk60 | —-0.025 |
| 105 | 25JA0031CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY CABALUAY, ZAMBOANGA CITY PHASE I | Region IX | Zamboanga City 2nd DEO | On-Going | ₱48.1M | 40% | Medium risk60 | —-0.026 |
| 106 | 24JA0055SIPAG- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF CONCRETE ROAD AT BARANGAY TETUAN, ZAMBOANGA CTIY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱34.3M | 15% | Medium risk60 | —-0.017 |
| 107 | 23JA0005REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED ROADS - PRIMARY ROADS: REHABILITATION OF PAVED ROADS- PAGADIAN CITY-ZAMBOANGA CITY RD - K1898 + 000 - K1899 + 805 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱39.7M | 100% | Medium risk60 | —-0.038 |
| 108 | 20JH0041CONCRETING OF ROAD, BRGY. MALIGUE TO BRGY. KAPATAGAN, ISABELA CITY, BASILAN | Region IX | Isabela City DEO | Completed | ₱49.5M | 100% | Medium risk60 | —-0.073 |
| 109 | 24JA0120CONCRETING OF BRGY. QUINIPUT FMR, BRGY. QUINIPUT ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱14.9M | 50% | Medium risk60 | Flagged0.012 |
| 110 | 23J00069CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, NRJ SANGALI BYPASS ROAD, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱38.2M | 77% | Medium risk60 | —-0.031 |
| 111 | 24JA0119CONCRETING OF BRGY. TAGASILAY FMR, BRGY. TAGASILAY ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱14.9M | 50% | Medium risk60 | Flagged0.012 |
| 112 | 25J00005CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, NRJ SANGALI BY-PASS ROAD PACKAGE 4, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱36.2M | 4% | Medium risk60 | —-0.021 |
| 113 | 19J00079CONSTRUCTION OF BRIDGE ALONG BYPASS NATIONAL ROAD SUMAGDANG-MENZI-LANOTE, ISABELA CITY, BASILAN - AGUADA BRIDGE | Region IX | Region IX | Completed | ₱53M | 100% | Medium risk60 | —-0.045 |
| 114 | 22JA0003CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - NRJ SANGALI BY-PASS ROAD PACKAGE 1, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱28.8M | 80% | Medium risk60 | —-0.018 |
| 115 | 24JA0098BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- REHABILITATION/RECONSTRUCTION OF ROAD AT SITIO TALA-BYPASS, BARANGAY BOALAN, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱24.7M | 36% | Medium risk59 | —-0.029 |
| 116 | 20JA0025CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - ACCESS ROAD AT SITIO ANULING, PAMUCUTAN TO STA. RITA IN SUPPORT OF HIGH VALUE CROPS (ABACA, CACAO, RUBBER AND COFFEE), UPPER LA PAZ, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | Completed | ₱39.2M | 100% | Medium risk59 | —-0.073 |
| 117 | 24J00043CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - EASTSIDE - BINUANGAN COASTAL BYPASS ROAD, ISABELA CITY | Region IX | Region IX | On-Going | ₱46.2M | 50% | Medium risk59 | —-0.030 |
| 118 | 20JH0024ROAD WIDENING INCLUDING DRAINAGE ALONG BASILAN CIRCUMFERENTIAL ROAD (TUMAHUBONG-SUMISIP-MALUSO ROAD SECTION) STA. 75+100 - STA. 76+440 | Region IX | Isabela City DEO | Completed | ₱50.9M | 100% | Medium risk59 | —-0.076 |
| 119 | 25J00089CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - EASTSIDE - BINUANGAN COASTAL BY-PASS ROAD, ISABELA CITY | Region IX | Region IX | On-Going | ₱43.4M | 16% | Medium risk59 | —-0.024 |
| 120 | 22JA0025ROAD WIDENING - SECONDARY ROADS - ZAMBOANGA CITY-LABUAN-LIMPAPA RD - K1972 + 269 - K1973 + 760, K1973 + 976 - K1974 + 485 | Region IX | Zamboanga City 2nd DEO | On-Going | ₱30.7M | 54% | Medium risk59 | —-0.007 |
| 121 | 25J00229CONSTRUCTION OF BYPASS AND DIVERSION ROADS - KUMALARANG PARALLEL BR. (NEW) ALONG BASILAN CIRCUMFERENTIAL RD (MALUSO - ISABELA RD) | Region IX | Region IX | On-Going | ₱46.7M | 12% | Medium risk59 | Flagged0.002 |
| 122 | 24JA0111CONSTRUCTION OF 4 STOREY, 20 CLASSROOMS SCHOOL BUILDING AT BUENAVISTA INTEGRATED SCHOOL, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱63.7M | 70% | Medium risk58 | Flagged0.021 |
| 123 | 22J00064CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SUMAGDANG-MENZI-LANOTE BY-PASS ROAD, PACKAGE II, ISABELA CITY | Region IX | Region IX | On-Going | ₱44.1M | 75% | Medium risk58 | —-0.014 |
| 124 | 24JA0061(SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF CONCRETE ROAD AT SITIO PANSULAN TO SITIO MALA (BUCANA), BARANGAY BOLONG, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱17.6M | 71% | Medium risk58 | —-0.039 |
| 125 | 20JH0018ROAD WIDENING INCLUDING DRAINAGE ALONG BASILAN CIRCUMFERENTIAL ROAD (TUBURAN-LAMITAN ROAD SECTION) STA. 34+000 - STA. 35+000 | Region IX | Isabela City DEO | Completed | ₱39.5M | 100% | Medium risk58 | —-0.077 |