Opening the dossier…
Opening the dossier…
Contractor dossier
674 projects on file, including joint ventures this contractor is part of.
Total projects
674
Total budget
₱47.4B
Average progress
89.0%
Completion rate
60.5%
Below 70%
Average risk score
61.6
High risk on average, out of 100
Flagged as unusual
51
7.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 594 | ₱41.5B | 62.9 | 50 | 88.2% |
| National Capital Region | 22 | ₱1.4B | 56.7 | 0 | 82.9% |
| Region IV-B | 20 | ₱1.6B | 49.3 | 0 | 100.0% |
| Region VIII | 13 | ₱438.2M | 52.5 | 0 | 100.0% |
| Region XII | 11 | ₱951.2M | 41.2 | 0 | 100.0% |
| Region III | 9 | ₱551.8M | 55.8 | 0 | 100.0% |
| Region XI | 2 | ₱162.6M | 61.2 | 0 | 86.1% |
| Central Office | 1 | ₱744.4M | 74.0 | 1 | 86.9% |
| Region X | 1 | ₱49M | 46.9 | 0 | 100.0% |
| Region IV-A | 1 | ₱13.8M | 43.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 235 | ₱15.4B | 61.6 | 7 | 90.1% |
| Flood Control and Drainage | 205 | ₱17.1B | 61.5 | 5 | 94.2% |
| Buildings and Facilities | 138 | ₱9.8B | 61.0 | 15 | 79.8% |
| Bridges | 39 | ₱1.2B | 52.6 | 1 | 95.3% |
| OTHER | 24 | ₱2.1B | 78.3 | 15 | 81.0% |
| Water Provision and Storage | 23 | ₱664.9M | 53.2 | 1 | 92.7% |
| GAA 2025 SSP | 6 | ₱666.6M | 95.8 | 6 | 70.1% |
| Bridges, Roads | 3 | ₱255.7M | 66.5 | 0 | 60.3% |
| GAA 2025 OO-2 | 1 | ₱187.2M | 93.1 | 1 | 91.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FB0034SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY MINA TO BARANGAY GOTOB TO BARANGAY LIGBAN, CAMALIG | Region V | Albay 2nd DEO | On-Going | ₱93.5M | 57% | High risk96 | Flagged0.017 |
| 25F00118CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD DIKE, BARANGAY HICMING, VIRAC, CATANDUANES, | Region V | Region V | On-Going | ₱187.2M | 77% | High risk96 | Flagged0.025 |
| 25FB0014SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BAMBAN, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.3M | 66% | High risk96 | Flagged0.014 |
| 25F00365CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY SOLONG, SAN M | Region V | Region V | On-Going | ₱187.2M | 78% | High risk96 | Flagged0.026 |
| 25F00316CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP- ACCESS ROADS AND/OR | Region V | Region V | On-Going | ₱48M | 67% | High risk96 | Flagged0.006 |
| 25F00321CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BARANGAY MAOPI TO BARANGAY MAGOGON, DARAGA, ALB | Region V | Region V | On-Going | ₱57.3M | 76% | High risk95 | Flagged0.003 |
| 25F00044ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, PHASE 1, CARAMORAN, CATANDUANES | Region V | Region V | On-Going | ₱187.2M | 91% | High risk93 | Flagged0.003 |
| 24F00515CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD, SITIO MAUNA TO SITIO BICAL ROAD LEADING TO DECLARED T | Region V | Region V | On-Going | ₱144.3M | 7% | High risk91 | Flagged0.080 |
| 24FH0105FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, EASTERN POBLACION, BARAS, CATANDUANES, BARAS, CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱46.6M | 51% | High risk86 | Flagged0.051 |
| 24FE0024CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TANAG-SALVACION ROAD, BARANGAY SALVACION, PASACAO, CAMARI | Region V | Camarines Sur 2nd DEO | On-Going | ₱139.9M | 99% | High risk82 | Flagged0.008 |
| 24FI0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, MASBATE CITY | Region V | Masbate 2nd DEO | On-Going | ₱198M | 41% | High risk82 | Flagged0.032 |
| 22FB0269SIPAG: REHABILITATION ALONG TAYSAN - MARIAWA - MAYON ROAD, LEGAZPI CITY/DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱95.5M | 90% | High risk82 | Flagged0.016 |
| 19IK0044CONSTRUCTION OF BYPASS ROAD FROM BRGY. MAGALLANES - BRGY. GUIRANG LEADING TO SOHOTON NATIONAL PARK, BASEY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱74.5M | 100% | High risk82 | —-0.028 |
| 24F00444CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM-CONSTRUCTION OF THREE STOREY OFFICE BUILDING DOH BICOL CHD COMPOUND, D | Region V | Region V | On-Going | ₱111.7M | 85% | High risk82 | Flagged0.002 |
| 24F00002CLUSTER II-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-II-A: CONSTRUCTION OF MULTI-PURPOSE BUILDING, COA BUILDING, REGIONAL CENTER, BARANGAY RAWIS, LEGAZPI CI | Region V | Region V | On-Going | ₱105.6M | 87% | High risk82 | Flagged0.006 |
| 24F00359LOCAL PROGRAM- NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES- CONSTRUCTION OF DEPARTMENT OF HUMAN SETTLEMENTS AND URBAN DEVELOPMENT (DHSUD) THREE STOREY REGIONAL OFFICE GREEN BUILDING, GOVERNMENT CENTER SITE, RAWIS, LEGA | Region V | Region V | On-Going | ₱112.3M | 92% | High risk82 | Flagged0.005 |
| 23FN0027CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF BANK PROTECTION STRUCTURE, BRGY. SANTA JUSTINA, BUHI, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱96.4M | 100% | High risk81 | —-0.026 |
| 24F00186ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BUYO, VIRAC, CATANDUANES, VIRAC, CAT | Region V | Region V | On-Going | ₱93.6M | 74% | High risk81 | Flagged0.012 |
| 24F00185ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, IBONG SAPA, VIRAC, CATANDUANES, VIRA | Region V | Region V | On-Going | ₱93.6M | 84% | High risk81 | Flagged0.007 |
| 23FB0032SIPAG: REHABILITATION OF ROADS WITH SLIP, SLOPE COLLAPSE & LANDSLIDE - DARAGA DIVERSION ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱91.6M | 90% | High risk80 | Flagged0.011 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24F00515CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD, SITIO MAUNA TO SITIO BICAL ROAD LEADING TO DECLARED T | Region V | Region V | On-Going | ₱144.3M | 7% | High risk91 | Flagged0.080 |
| 24FH0105FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, EASTERN POBLACION, BARAS, CATANDUANES, BARAS, CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱46.6M | 51% | High risk86 | Flagged0.051 |
| 24F00509CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF COASTAL ROAD AND SHORE P | Region V | Region V | On-Going | ₱279.4M | 8% | High risk78 | Flagged0.045 |
| 24F00479CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTION FACILITY/MEETINGS, INCENTIVES, CONFERENCES FOR EDUCATION AND SP | Region V | Region V | On-Going | ₱144M | 11% | High risk73 | Flagged0.040 |
| 24FB0293DEPED BASIC EDUCATIONAL FACILITY FUND - CONSTRUCTION OF 4-STOREY 20-CLASSROOM SCHOOL BUILDING AT IBALON CENTRAL SCHOOL, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱127.7M | 8% | High risk72 | Flagged0.036 |
| 23F00345CONSTRUCTION OF NBI BUILDING, REGIONAL OFFICE V, REGIONAL GOVERNMENT CENTER, RAWIS, LEGAZPI, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱241.5M | 91% | High risk73 | Flagged0.032 |
| 24FI0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, MASBATE CITY | Region V | Masbate 2nd DEO | On-Going | ₱198M | 41% | High risk82 | Flagged0.032 |
| 24FB0243DEPED BASIC EDUCATIONAL FACILITY FUND -CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING AT TUMPA ELEMENTARY SCHOOL, BARANGAY TUMPA, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱19.3M | 27% | Medium risk50 | Flagged0.029 |
| 23F00434CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG OBI RIVER UPSTREAM STA. 5+313-STA. 5+813 OBI, CARAMORAN, | Region V | Region V | On-Going | ₱140.4M | 99% | High risk78 | Flagged0.028 |
| 19Z00033DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Central Office | Flood Control Management Cluster | On-Going | ₱744.4M | 87% | High risk74 | Flagged0.028 |
| 25F00365CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY SOLONG, SAN M | Region V | Region V | On-Going | ₱187.2M | 78% | High risk96 | Flagged0.026 |
| 24FB0295CLUSTER II - DEPED BASIC EDUCATIONAL FACILITY FUND - CONSTRUCTION OF 3 UNITS, 1-STOREY 2-CLASSROOM SCHOOL BUILDING AND 1 UNIT, 2-STOREY 2-CLASSROOM SCHOOL BUILDING AT DARAGA, ALBAY 1) CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTA | Region V | Albay 2nd DEO | On-Going | ₱38.6M | 42% | Medium risk52 | Flagged0.026 |
| 24FB0257DEPED BASIC EDUCATIONAL FACILITY FUND -CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING AT SAN FRANCISCO ELEMENTARY SCHOOL, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱19.4M | 34% | Medium risk46 | Flagged0.026 |
| 25F00118CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD DIKE, BARANGAY HICMING, VIRAC, CATANDUANES, | Region V | Region V | On-Going | ₱187.2M | 77% | High risk96 | Flagged0.025 |
| 19F00123CONSTRUCTION OF EVACUATION CENTERS INCLUDING SITE DEVELOPMENT IN REGION V, LALAGUNA, MOBO, MASBATE | Region V | Region V | On-Going | ₱35.1M | 79% | Medium risk58 | Flagged0.023 |
| 23F00438CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD/SEAWALL, BARANGAY POBLACION, RAPU-RAPU, ALBAY (PHASE 3) RAPU-RAPU, A | Region V | Region V | On-Going | ₱236.8M | 93% | High risk76 | Flagged0.023 |
| 18FO0036WIDENING OF PERMANENT BRIDGE, GUINOBATAN BRIDGE (B00292LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱44.1M | 100% | High risk77 | Flagged0.022 |
| 23F00445CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD AND SHORE PROTECTION AT SALVACION TO BUHATAN (PACKAGE 1), STO. DOMIN | Region V | Region V | On-Going | ₱202.6M | 89% | High risk78 | Flagged0.020 |
| 17FO0051WIDENING OF MATACON PERMANENT BRIDGE (B00280LZ) ALONG DAANG MAHARLIKA LZ | Region V | Albay 3rd DEO | On-Going | ₱19.3M | 100% | Medium risk57 | Flagged0.020 |
| 24FB0284DEPED BASIC EDUCATIONAL FACILITY FUND -CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING AT BINITAYAN ELEMENTARY SCHOOL, BARANGAY BINITAYAN, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱48.3M | 1% | High risk64 | Flagged0.019 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 476 | 17FO0002CLUSTER I-2017: REHABILITATION/MAJOR REPAIR OF EXISTING PERMANENT BRIDGES ALONG LIGAO-TABACO ROAD, LIGAO CITY. 1. TUBGON BRIDGE (B00302LZ), 2. BUYOG BRIDGE (B00304LZ), 3. BASAG BRIDGE (B00303LZ), 4. TAMBO BRIDGE (B00305LZ), AND 5. AMTIC BRIDGE (B00306LZ) | Region V | Albay 3rd DEO | Completed | ₱7.4M | 100% | Medium risk58 | —-0.035 |
| 477 | 24FO0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TOBGON FLOOD MITIGATION STRUCTURE, LIGAO CITY, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱29.7M | 92% | Medium risk58 | —-0.048 |
| 478 | 20FO0065CONSTRUCTION OF SILL DAM, DOWNSTREAM OF TUGBON BRIDGE, BRGY. TUGBON, LIGAO CITY, ALBAY | Region V | Albay 3rd DEO | Completed | ₱29.7M | 100% | Medium risk58 | —-0.088 |
| 479 | 18FB0236CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL DIKE AT RURAN RIVER, PUROK 3 & PUROK 4, BRGY. 17, ILAWOD, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱25.2M | 100% | Medium risk58 | —-0.088 |
| 480 | 23FB0150SIPAG: CONSTRUCTION OF DRAINAGE SYSTEM IN BARANGAY BAGUMBAYAN, BINITAYAN, BUDIAO, GABAWAN, ILAWOD, KILICAO, MAROROY, MARKET SITE, SAGPON, SAN ROQUE AND TAGAS) DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱21.6M | 60% | Medium risk58 | —-0.028 |
| 481 | 18FB0009LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT MALABOG-BUSAY RIVER, DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱18.8M | 100% | Medium risk58 | —-0.088 |
| 482 | 18FB0049LIP- FLOOD CONTROL STRUCTURES/FACILITIES CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BUDIAO-MALABOG RIVER, BRGY. BUDIAO, DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱18.7M | 100% | Medium risk58 | —-0.088 |
| 483 | 19F00136CONSTRUCTION OF EVACUATION CENTERS INCLUDING SITE DEVELOPMENT IN REGION V, SAN ANDRES, STO. DOMINGO, ALBAY | Region V | Region V | Completed | ₱35.7M | 100% | Medium risk58 | —-0.043 |
| 484 | 19FA0081CLUSTER 45- CONCRETING OF FARM TO MARKET ROADS: BRGY. ALIMSOG-BRGY.SULA FMR, STO. DOMINGO, ALBAY; AND BRGY. CARARAYAN-BRGY. LIBJO-BRGY. BOLO FMR, TIWI, ALBAY | Region V | Albay 1st DEO | Completed | ₱49.8M | 100% | Medium risk58 | —-0.041 |
| 485 | 24FO0032ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - ALBAY WEST COAST RD. K0508+408 - K0508+490 | Region V | Albay 3rd DEO | On-Going | ₱14.1M | 16% | Medium risk58 | —-0.041 |
| 486 | 25FL0014CONST/IMPRVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM RD. INFRA. PROG.-TRIP | Region V | Sorsogon 2nd DEO | On-Going | ₱28.5M | 26% | Medium risk58 | —-0.047 |
| 487 | 23FB0188SIPAG: CONSTRUCTION OF DRAINAGE SYSTEM, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱42.6M | 40% | Medium risk58 | —-0.024 |
| 488 | 18FB0083CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION/REHABILITATION OF FLOOD CONTROL DIKE AT YAWA RIVER, BONOT, LEGAZPI CITY | Region V | Albay 2nd DEO | Completed | ₱28.3M | 100% | Medium risk58 | —-0.088 |
| 489 | 25OB0350CONSTRUCTION OF MULTI LEVEL PURPOSE BUILDING, BARANGAY VERGARA, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱72.8M | 0% | Medium risk58 | —-0.027 |
| 490 | 20FO0003ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, ALBAY WEST COAST ROAD, K0526+630-K0527+051, K0530+056-K0531+331 | Region V | Albay 3rd DEO | Completed | ₱26.5M | 100% | Medium risk58 | —-0.099 |
| 491 | 24FG0129CONCRETING OF SITIO PALAYAN FMR, BRGY. LAMON, GOA, CAMARINES SUR | Region V | Camarines Sur 4th DEO | Completed | ₱49.8M | 100% | Medium risk58 | —-0.040 |
| 492 | 19OB0056CONSTRUCTION OF FIVE (5) STOREY MULTI-PURPOSE BUILDING, RIZAL TECHNOLOGICAL UNIVERSITY (SACRIPANTE SIDE), MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱67.5M | 100% | Medium risk58 | —-0.089 |
| 493 | 25OB0357CONSTRUCTION OF MULTI-PURPOSE BUILDING, SANIBOY ST., BARANGAY HULO, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱67.9M | 0% | Medium risk58 | —-0.027 |
| 494 | 19OB0059CONSTRUCTION OF MANDALUYONG CITY COLLEGE INCLUDING COMPLETION OF FACILITIES (ADMINISTRATION BUILDING), MANDALUYONG CITY, MANILA | National Capital Region | Metro Manila 1st DEO | Completed | ₱69.3M | 100% | Medium risk58 | —-0.090 |
| 495 | 18FH0180CONST. OF FOUR(4) STOREY TWENTY EIGHT (28) CL-TWO(2) UNITS (7 X 18) SCIENCE LABORATORY, TWO(2) UNITS (7 X 18) ICT LABORATORY, SEVEN (7) UNITS (7 X 18) REGULAR WORKSHOP & SIX(6) CLASSROOM (7 X9) SENIOR HS BLDG., CALATAGAN HS, VIRAC (CAPITAL), CATANDUANES | Region V | Catanduanes DEO | Completed | ₱58.3M | 100% | Medium risk58 | —-0.035 |
| 496 | 17FB0026CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BONGALON FLOOD CONTROL SYSTEM, BRGY. BONGALON, DARAGA, ALBAY | Region V | Albay 2nd DEO | Completed | ₱46.7M | 100% | Medium risk57 | —-0.057 |
| 497 | 23FA0038CONSTRUCTION OF FLOOD CONTROL SYSTEM AT SAN RAFAEL RIVER, STO. DOMINGO, ALBAY | Region V | Albay 1st DEO | Completed | ₱49M | 100% | Medium risk57 | —-0.088 |
| 498 | 20FO0008WIDENING OF PERMANENT BRIDGES - CABANGAN BRIDGE (B00286LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱31.6M | 100% | Medium risk57 | —-0.004 |
| 499 | 18EH0123CONSTRUCTION OF POBLACION SHORE PROTECTION/CAUSEWAY BANTON, ROMBLON, BANTON, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱95.1M | 100% | Medium risk57 | —-0.063 |
| 500 | 20FA0081CLUSTER 52-REHAB./CONST. OF SAN ANTONIO RIVER CONTROL AND BASUD RIVER CONTROL DOWNSTREAM, STO. DOMINGO, ALBAY | Region V | Albay 1st DEO | Completed | ₱29.7M | 100% | Medium risk57 | —-0.088 |