Opening the dossier…
Opening the dossier…
Contractor dossier
674 projects on file, including joint ventures this contractor is part of.
Total projects
674
Total budget
₱47.4B
Average progress
89.0%
Completion rate
60.5%
Below 70%
Average risk score
61.6
High risk on average, out of 100
Flagged as unusual
51
7.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 594 | ₱41.5B | 62.9 | 50 | 88.2% |
| National Capital Region | 22 | ₱1.4B | 56.7 | 0 | 82.9% |
| Region IV-B | 20 | ₱1.6B | 49.3 | 0 | 100.0% |
| Region VIII | 13 | ₱438.2M | 52.5 | 0 | 100.0% |
| Region XII | 11 | ₱951.2M | 41.2 | 0 | 100.0% |
| Region III | 9 | ₱551.8M | 55.8 | 0 | 100.0% |
| Region XI | 2 | ₱162.6M | 61.2 | 0 | 86.1% |
| Central Office | 1 | ₱744.4M | 74.0 | 1 | 86.9% |
| Region X | 1 | ₱49M | 46.9 | 0 | 100.0% |
| Region IV-A | 1 | ₱13.8M | 43.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 235 | ₱15.4B | 61.6 | 7 | 90.1% |
| Flood Control and Drainage | 205 | ₱17.1B | 61.5 | 5 | 94.2% |
| Buildings and Facilities | 138 | ₱9.8B | 61.0 | 15 | 79.8% |
| Bridges | 39 | ₱1.2B | 52.6 | 1 | 95.3% |
| OTHER | 24 | ₱2.1B | 78.3 | 15 | 81.0% |
| Water Provision and Storage | 23 | ₱664.9M | 53.2 | 1 | 92.7% |
| GAA 2025 SSP | 6 | ₱666.6M | 95.8 | 6 | 70.1% |
| Bridges, Roads | 3 | ₱255.7M | 66.5 | 0 | 60.3% |
| GAA 2025 OO-2 | 1 | ₱187.2M | 93.1 | 1 | 91.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FB0034SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY MINA TO BARANGAY GOTOB TO BARANGAY LIGBAN, CAMALIG | Region V | Albay 2nd DEO | On-Going | ₱93.5M | 57% | High risk96 | Flagged0.017 |
| 25F00118CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD DIKE, BARANGAY HICMING, VIRAC, CATANDUANES, | Region V | Region V | On-Going | ₱187.2M | 77% | High risk96 | Flagged0.025 |
| 25FB0014SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BAMBAN, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.3M | 66% | High risk96 | Flagged0.014 |
| 25F00365CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY SOLONG, SAN M | Region V | Region V | On-Going | ₱187.2M | 78% | High risk96 | Flagged0.026 |
| 25F00316CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP- ACCESS ROADS AND/OR | Region V | Region V | On-Going | ₱48M | 67% | High risk96 | Flagged0.006 |
| 25F00321CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BARANGAY MAOPI TO BARANGAY MAGOGON, DARAGA, ALB | Region V | Region V | On-Going | ₱57.3M | 76% | High risk95 | Flagged0.003 |
| 25F00044ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, PHASE 1, CARAMORAN, CATANDUANES | Region V | Region V | On-Going | ₱187.2M | 91% | High risk93 | Flagged0.003 |
| 24F00515CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD, SITIO MAUNA TO SITIO BICAL ROAD LEADING TO DECLARED T | Region V | Region V | On-Going | ₱144.3M | 7% | High risk91 | Flagged0.080 |
| 24FH0105FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, EASTERN POBLACION, BARAS, CATANDUANES, BARAS, CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱46.6M | 51% | High risk86 | Flagged0.051 |
| 24FE0024CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TANAG-SALVACION ROAD, BARANGAY SALVACION, PASACAO, CAMARI | Region V | Camarines Sur 2nd DEO | On-Going | ₱139.9M | 99% | High risk82 | Flagged0.008 |
| 24FI0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, MASBATE CITY | Region V | Masbate 2nd DEO | On-Going | ₱198M | 41% | High risk82 | Flagged0.032 |
| 22FB0269SIPAG: REHABILITATION ALONG TAYSAN - MARIAWA - MAYON ROAD, LEGAZPI CITY/DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱95.5M | 90% | High risk82 | Flagged0.016 |
| 19IK0044CONSTRUCTION OF BYPASS ROAD FROM BRGY. MAGALLANES - BRGY. GUIRANG LEADING TO SOHOTON NATIONAL PARK, BASEY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱74.5M | 100% | High risk82 | —-0.028 |
| 24F00444CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM-CONSTRUCTION OF THREE STOREY OFFICE BUILDING DOH BICOL CHD COMPOUND, D | Region V | Region V | On-Going | ₱111.7M | 85% | High risk82 | Flagged0.002 |
| 24F00002CLUSTER II-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-II-A: CONSTRUCTION OF MULTI-PURPOSE BUILDING, COA BUILDING, REGIONAL CENTER, BARANGAY RAWIS, LEGAZPI CI | Region V | Region V | On-Going | ₱105.6M | 87% | High risk82 | Flagged0.006 |
| 24F00359LOCAL PROGRAM- NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES- CONSTRUCTION OF DEPARTMENT OF HUMAN SETTLEMENTS AND URBAN DEVELOPMENT (DHSUD) THREE STOREY REGIONAL OFFICE GREEN BUILDING, GOVERNMENT CENTER SITE, RAWIS, LEGA | Region V | Region V | On-Going | ₱112.3M | 92% | High risk82 | Flagged0.005 |
| 23FN0027CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF BANK PROTECTION STRUCTURE, BRGY. SANTA JUSTINA, BUHI, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱96.4M | 100% | High risk81 | —-0.026 |
| 24F00186ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BUYO, VIRAC, CATANDUANES, VIRAC, CAT | Region V | Region V | On-Going | ₱93.6M | 74% | High risk81 | Flagged0.012 |
| 24F00185ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, IBONG SAPA, VIRAC, CATANDUANES, VIRA | Region V | Region V | On-Going | ₱93.6M | 84% | High risk81 | Flagged0.007 |
| 23FB0032SIPAG: REHABILITATION OF ROADS WITH SLIP, SLOPE COLLAPSE & LANDSLIDE - DARAGA DIVERSION ROAD, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱91.6M | 90% | High risk80 | Flagged0.011 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24F00515CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD, SITIO MAUNA TO SITIO BICAL ROAD LEADING TO DECLARED T | Region V | Region V | On-Going | ₱144.3M | 7% | High risk91 | Flagged0.080 |
| 24FH0105FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL, EASTERN POBLACION, BARAS, CATANDUANES, BARAS, CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱46.6M | 51% | High risk86 | Flagged0.051 |
| 24F00509CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF COASTAL ROAD AND SHORE P | Region V | Region V | On-Going | ₱279.4M | 8% | High risk78 | Flagged0.045 |
| 24F00479CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTION FACILITY/MEETINGS, INCENTIVES, CONFERENCES FOR EDUCATION AND SP | Region V | Region V | On-Going | ₱144M | 11% | High risk73 | Flagged0.040 |
| 24FB0293DEPED BASIC EDUCATIONAL FACILITY FUND - CONSTRUCTION OF 4-STOREY 20-CLASSROOM SCHOOL BUILDING AT IBALON CENTRAL SCHOOL, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱127.7M | 8% | High risk72 | Flagged0.036 |
| 23F00345CONSTRUCTION OF NBI BUILDING, REGIONAL OFFICE V, REGIONAL GOVERNMENT CENTER, RAWIS, LEGAZPI, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱241.5M | 91% | High risk73 | Flagged0.032 |
| 24FI0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, MASBATE CITY | Region V | Masbate 2nd DEO | On-Going | ₱198M | 41% | High risk82 | Flagged0.032 |
| 24FB0243DEPED BASIC EDUCATIONAL FACILITY FUND -CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING AT TUMPA ELEMENTARY SCHOOL, BARANGAY TUMPA, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱19.3M | 27% | Medium risk50 | Flagged0.029 |
| 23F00434CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG OBI RIVER UPSTREAM STA. 5+313-STA. 5+813 OBI, CARAMORAN, | Region V | Region V | On-Going | ₱140.4M | 99% | High risk78 | Flagged0.028 |
| 19Z00033DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Central Office | Flood Control Management Cluster | On-Going | ₱744.4M | 87% | High risk74 | Flagged0.028 |
| 25F00365CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE, BARANGAY SOLONG, SAN M | Region V | Region V | On-Going | ₱187.2M | 78% | High risk96 | Flagged0.026 |
| 24FB0295CLUSTER II - DEPED BASIC EDUCATIONAL FACILITY FUND - CONSTRUCTION OF 3 UNITS, 1-STOREY 2-CLASSROOM SCHOOL BUILDING AND 1 UNIT, 2-STOREY 2-CLASSROOM SCHOOL BUILDING AT DARAGA, ALBAY 1) CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTA | Region V | Albay 2nd DEO | On-Going | ₱38.6M | 42% | Medium risk52 | Flagged0.026 |
| 24FB0257DEPED BASIC EDUCATIONAL FACILITY FUND -CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING AT SAN FRANCISCO ELEMENTARY SCHOOL, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱19.4M | 34% | Medium risk46 | Flagged0.026 |
| 25F00118CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD DIKE, BARANGAY HICMING, VIRAC, CATANDUANES, | Region V | Region V | On-Going | ₱187.2M | 77% | High risk96 | Flagged0.025 |
| 19F00123CONSTRUCTION OF EVACUATION CENTERS INCLUDING SITE DEVELOPMENT IN REGION V, LALAGUNA, MOBO, MASBATE | Region V | Region V | On-Going | ₱35.1M | 79% | Medium risk58 | Flagged0.023 |
| 23F00438CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD/SEAWALL, BARANGAY POBLACION, RAPU-RAPU, ALBAY (PHASE 3) RAPU-RAPU, A | Region V | Region V | On-Going | ₱236.8M | 93% | High risk76 | Flagged0.023 |
| 18FO0036WIDENING OF PERMANENT BRIDGE, GUINOBATAN BRIDGE (B00292LZ) ALONG DAANG MAHARLIKA (LZ) | Region V | Albay 3rd DEO | On-Going | ₱44.1M | 100% | High risk77 | Flagged0.022 |
| 23F00445CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD AND SHORE PROTECTION AT SALVACION TO BUHATAN (PACKAGE 1), STO. DOMIN | Region V | Region V | On-Going | ₱202.6M | 89% | High risk78 | Flagged0.020 |
| 17FO0051WIDENING OF MATACON PERMANENT BRIDGE (B00280LZ) ALONG DAANG MAHARLIKA LZ | Region V | Albay 3rd DEO | On-Going | ₱19.3M | 100% | Medium risk57 | Flagged0.020 |
| 24FB0284DEPED BASIC EDUCATIONAL FACILITY FUND -CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING AT BINITAYAN ELEMENTARY SCHOOL, BARANGAY BINITAYAN, DARAGA, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱48.3M | 1% | High risk64 | Flagged0.019 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 24F00072ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HICMING, VIRAC, CATANDUANES, VIRAC, | Region V | Region V | On-Going | ₱193M | 100% | High risk71 | —-0.020 |
| 102 | 22FB0237COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION CONSTRUCTION OF BAGACAY COASTAL ROAD AND SHORE PROTECTION PHASE 2, LEGAZPI CITY, ALBAY | Region V | Albay 2nd DEO | Completed | ₱95.5M | 100% | High risk71 | —-0.076 |
| 103 | 22FA0067CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG SALOG RIVER, BACACAY, ALBAY | Region V | Albay 1st DEO | Completed | ₱95.5M | 100% | High risk70 | —-0.077 |
| 104 | 24FB0175OO2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF LAHAR MITIGATION STRUCTURE ALONG QUIRANGAY - SALUGAN RIVER,PHASE 2,CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱96.5M | 97% | High risk70 | —-0.044 |
| 105 | 24F00074ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE, OBI, CARAMORAN, CATANDUANES, CARAM | Region V | Region V | On-Going | ₱187.2M | 76% | High risk70 | —-0.014 |
| 106 | 22FA0078CONSTRUCTION OF SHORE PROTECTION AT ALIMSOG BUHATAN, STO. DOMINGO, ALBAY | Region V | Albay 1st DEO | Completed | ₱94.6M | 100% | High risk70 | —-0.077 |
| 107 | 23F00041CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, PHASE II, BARANGAY OBI, CARAMORAN, C | Region V | Region V | On-Going | ₱193M | 96% | High risk70 | —-0.010 |
| 108 | 24FB0067SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANOLING - QUIRANGAY ROAD, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.5M | 100% | High risk70 | —-0.063 |
| 109 | 25FB0012SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CAGUIBA TO BARANGAY ILULUAN, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱93.5M | 55% | High risk70 | —-0.054 |
| 110 | 22FB0025CSSP: CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN), SAN JOAQUIN - PAWA - BOGTONG ROAD LEADING TO LEGAZPI CITY AIRPORT, LEGAZPI CITY, ALBAY, PACKAGE II | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 87% | High risk70 | —-0.038 |
| 111 | 22FB0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN),SAN JOAQUIN-PAWA -BOGTONG ROAD LEADING TO LEGAZPI CITY AIRPORT, LEGAZPI CITY, ALBAY, PACKAGE I | Region V | Albay 2nd DEO | On-Going | ₱93.6M | 93% | High risk70 | —-0.038 |
| 112 | 24FB0157OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BALABAON RIVER FLOOD MITIGATION STRUCTURE, PHASE 2, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱112.1M | 88% | High risk70 | —-0.038 |
| 113 | 24FB0183OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF RIVER PROTECTION DIKE ALONG KAMANITOHAN RIVER, MANITO, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱112M | 84% | High risk70 | —-0.040 |
| 114 | 23FB0111BIP: CONSTRUCTION OF ROAD, QUIRANGAY-SUA-TUMPA, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱94.5M | 14% | High risk70 | —-0.026 |
| 115 | 17M00025ROAD WIDENING OF DIGOS-MAKAR ROAD, K1598+778 K1601+545; K1601+566 K1601+694; K1602+08 -K1605+376, MALUNGON, SARANGANI | Region XII | Region XII | Completed | ₱173.4M | 100% | High risk70 | —-0.006 |
| 116 | 23FA0027CONSTRUCTION OF RIVER PROTECTION STRUCTURES AT TELEGRAPO RIVER (DOWNSTREAM), LIDONG, STO. DOMINGO, ALBAY | Region V | Albay 1st DEO | Completed | ₱99M | 100% | High risk70 | —-0.076 |
| 117 | 18F00074OO2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: REHABILITATION/IMPROVEMENT OF BUSAY FLOOD CONTROL DIKE, BUSAY, STA.7+267.00-STA.8+321.80, DARAGA, | Region V | Region V | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 118 | 23FB0196SIPAG: CONSTRUCTION OF VARIOUS DRAINAGE SYSTEM DARAGA ALBAY 2ND DEO ALBAY | Region V | Albay 2nd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 119 | 24FB0069BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, MIISI - MABINIT , LEGAZPI CITY | Region V | Albay 2nd DEO | On-Going | ₱95.7M | 52% | High risk70 | —-0.046 |
| 120 | 25F00327CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, PHASE 2, BARANGAY CAGBACONG, LEGAZPI CITY, ALBA | Region V | Region V | On-Going | ₱96M | 30% | High risk70 | —-0.047 |
| 121 | 24F00073ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF FLOOD CONTROL STRUCTURE, SITIO TAGBAK, PARAISO, SAN MIGUEL, | Region V | Region V | On-Going | ₱187.2M | 98% | High risk70 | —-0.021 |
| 122 | 22F00186CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES(OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-CONSTRUCTION OF MIISI-LIDONG ROAD, DARAGA/STO. DOMINGO, ALBAY | Region V | Region V | Completed | ₱95.5M | 100% | High risk70 | —-0.088 |
| 123 | 21FB0039CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN,RILES AT DAUNGAN PROGRAM-KATUPARAN) SAN-JOAQUIN-PAWA-BOGTONG ROAD LEADING TO LEGAZPI AIRPORT, LEGAZPI CITY, ALBAY, PACKAGE I | Region V | Albay 2nd DEO | On-Going | ₱93M | 95% | High risk70 | —-0.030 |
| 124 | 24FI0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE FACILITIES (SPORTS FACILITIES), MASBATE CITY, MASBATE | Region V | Masbate 2nd DEO | On-Going | ₱99M | 29% | High risk70 | —-0.024 |
| 125 | 23FA0022CONSTRUCTION OF RIVER DIKE AT BAGONG SAN ROQUE, STO. DOMINGO, ALBAY | Region V | Albay 1st DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |