Contractor dossier
140 projects on file, including joint ventures this contractor is part of.
Total projects
140
Total budget
₱5.3B
Average progress
96.8%
Completion rate
81.4%
Average risk score
49.7
Medium risk on average, out of 100
Flagged as unusual
3
2.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 129 | ₱4.9B | 49.9 | 3 | 96.6% |
| Region VI | 11 | ₱423.2M | 47.2 | 0 | 98.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱4.1B | 47.6 | 0 | 98.7% |
| Flood Control and Drainage | 13 | ₱907.2M | 54.1 | 1 | 90.7% |
| GAA 2025 SSP | 2 | ₱138.1M | 95.4 | 1 | 55.4% |
| GAA 2025 OO-1 | 2 | ₱50.6M | 92.0 | 1 | 64.8% |
| Bridges | 2 | ₱16.4M | 45.3 | 0 | 100.0% |
| OTHER | 1 | ₱10.4M | 73.3 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱49.5M | 48.5 | 0 | 89.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25RC0003REHABILITATION AND WATERLINE IMPROVEMENT, KABANKALAN CITY WATER DISTRICT, BARANGAY 8, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱99M | 11% | High risk96 | Flagged0.042 |
| 25GL0015PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG BACOLOD SOUTH RD - K0078 + 650 - K0079+307 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱39.2M | 100% | High risk95 | —-0.015 |
| 25GM0008OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN-BAIS RD - K0096+000 - K0096+569, K0097+646 - K0098+000, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱39.7M | 37% | High risk92 | Flagged0.008 |
| 25HK0041ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG BAIS-KABANKALAN ROAD-K0078+403-K0078+873,MABINAY,NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱11M | 92% | High risk92 | —-0.010 |
| 21GL0050PREVENTIVE MAINTENANCE ALONG PRIMARY RD , BACOLOD SOUTH RD (S00134NR) K0047 + 000 - K0047 + 487 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱10.4M | 100% | High risk73 | —-0.033 |
| 25HJ0015ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG HIBAIYO RIVER, GUIHULNGAN | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱48.5M | 100% | High risk71 | —-0.021 |
| 25GN0006ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD - K0040+765- K0042+647 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱79.6M | 100% | High risk70 | —-0.037 |
| 25HK0040ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - BAIS - KABANKALAN RD - K0094+000 - K0095+000 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱63.9M | 93% | High risk70 | —-0.037 |
| 25GN0005ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT. PONTEVEDRA - LA CASTELLANA ROAD - K0052+806 - K0053+140, K0053+813 - K0054+655 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱28.7M | 100% | High risk66 | —-0.042 |
| 24GN0016ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - ASPHALT OVERLAY- BACOLOD SOUTH ROAD-K0011+(-469) - K0011+000, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱17M | 100% | High risk66 | —-0.031 |
| 25GN0061ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT SAN ENRIQUE - PONTEVEDRA BY-PASS ROAD - K0043+000 - K0044+989, K00045+497 - K0045+821, K0046+079 - K0046+365 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱44.6M | 90% | High risk66 | —-0.039 |
| 24GN0019ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - ASPHALT OVERLAY - BACOLOD SOUTH BY-PASS ROAD - K0019+(-175) - K0019+663 | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱30M | 100% | High risk66 | —-0.060 |
| 25RH0003SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG BAIS - KABANKALAN ROAD - K0058+869 - K0059+135, K0060+300 - K0060+502 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱18.1M | 100% | High risk66 | —-0.040 |
| 24GN0017ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-BACOLOD SOUTH ROAD-K0024+(-036)-K0024+331,PULUPANDAN,NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱13.3M | 100% | High risk66 | —-0.031 |
| 25G00062CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG- HILABANGAN RIVER (DOWNSTREAM OF APPROACH A OF ILOG BR.), ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱181.5M | 79% | High risk65 | —-0.011 |
| 25G00070CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MINULU- AN RIVER (BOTHSTREAM) AT BACOLOD NORTH RD, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱179.7M | 0% | High risk65 | Flagged0.010 |
| 25GN0011ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BACOLOD SOUTH ROAD (GEN. LUNA - BAGO HIGH SCHOOL ROAD) K0022+200 - K0022+317 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱5.5M | 100% | High risk65 | —-0.042 |
| 25GN0012PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG BACOLOD SOUTH ROAD - (S00210NR) CHAINAGE 032 - CHAINAGE 076, CHAINAGE 076 - CHAINAGE 217, CHAINAGE 217 - CHAINAGE 261 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱7.4M | 100% | High risk65 | —-0.041 |
| 24GM0017CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG-HILABANGAN RIVER (UPSTREAM OF APPROACH A OF ILOG BR.) PHASE 2, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱125.5M | 100% | High risk63 | —-0.050 |
| 24GK0191CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. RAFAELA, SAGAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.053 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25RC0003REHABILITATION AND WATERLINE IMPROVEMENT, KABANKALAN CITY WATER DISTRICT, BARANGAY 8, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱99M | 11% | High risk96 | Flagged0.042 |
| 25G00070CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MINULU- AN RIVER (BOTHSTREAM) AT BACOLOD NORTH RD, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱179.7M | 0% | High risk65 | Flagged0.010 |
| 25GM0008OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN-BAIS RD - K0096+000 - K0096+569, K0097+646 - K0098+000, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱39.7M | 37% | High risk92 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22GK0124PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PREVENTIVE MAINTENANCE ALONG BACOLOD NORTH RD, K0083+563 - K0085+494 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.090 |
| 52 | 24GQ0001PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG BACOLOD NORTH RD (S00425NR) - K0096 + 000 - K0096 + 640 | Region VI | Region VI | Completed | ₱30.1M | 100% | Medium risk46 | —-0.082 |
| 53 | 23GQ0044PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG STOP AGUINALDO - BUG-ANG RD (S00395NR) K0117 + 258 - K0119 + 826 | Region VI | Region VI | Completed | ₱37.6M | 100% | Medium risk46 | —-0.083 |
| 54 | 22G00067PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ON SPECIFIC LOCATIONS ALONG BACOLOD NORTH RD (S00425NR) K0097 + 000 - K0097 + 850 | Region VI | Region VI | Completed | ₱32.2M | 100% | Medium risk46 | —-0.083 |
| 55 | 23HL0034ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - PRIMARY ROADS: DUMAGUETE SOUTH RD - K0058 + 269 - K0058 + 914, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱28.7M | 100% | Medium risk46 | —-0.090 |
| 56 | 25GQ0012PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG JCT NATL RD SAGAY-BATO-DIAN-MARCELO-BALEA JCT RD (S00426NR) - K0105+367 - K0105+875 | Negros Island Region | Negros Occidental 5th DEO | Completed | ₱13.2M | 100% | Medium risk46 | —-0.089 |
| 57 | 23HL0012ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF MANALONGON RIVER CONTROL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱44.1M | 100% | Medium risk46 | —-0.066 |
| 58 | 19GN0022CONSTRUCTION OF CONCRETE ROAD - MAILUM-PATAAN ROAD LEADING TO PATAAN AND TINAGO MOUNTAIN RESORT (HIDDEN VALLEY), BRGY. MAILUM, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.090 |
| 59 | 23GK0108PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH ROAD (S00406NR) - K0032+353 - K0032 + 646, K0034+383 - K0035+370 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱34.6M | 100% | Medium risk46 | —-0.091 |
| 60 | 21GK0163RECONSTRUCTION TO CONCRETE PAVEMENT - AT SPECIFIC LOCATIONS ALONG BACOLOD NORTH RD (S00406NR) - K0013+843 - K0035+841 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱29M | 100% | Medium risk46 | —-0.092 |
| 61 | 22GK0119PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (S00406NR) - K0027+000 - K0028+487 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱44.7M | 100% | Medium risk45 | —-0.090 |
| 62 | 23GK0118PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH ROAD (S00393NR) - K0009+000 - K0009+777, (S00024NR) - K0005+(-790) - K0005+050, K0005+700 - K0006+000, (S00025NR) - K0006+(-174) - K0006+100, K0005+107 - K0005+772 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱44.4M | 100% | Medium risk45 | —-0.091 |
| 63 | 25GK0030PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD - K0036 + 000 - K0036 + 902 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱42.6M | 100% | Medium risk45 | —-0.090 |
| 64 | 23GK0109PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH ROAD (S00406NR) - K0039+751 - K0041 + 280 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱34.5M | 100% | Medium risk45 | —-0.091 |
| 65 | 24GQ0002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG BACOLOD NORTH RD (S00425NR) - K0122+580 - K0123+307 | Region VI | Region VI | Completed | ₱21.2M | 100% | Medium risk45 | —-0.082 |
| 66 | 18GH0055CONSTRUCTION OF CONCRETE ROAD-NRJ CABAGOHAN-BINON-AN-EMBARCADERO-BOTONGON ROAD LEADING TO ESTANCIA WHARF, ESTANCIA, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.084 |
| 67 | 22GL0022PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ISABELA-LIBAS NEGROS OCC. BDRY RD (S00374NR) - K0083 + 918 - K0085 + 625, K0087 + 000 - K0089 + 296 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱40.7M | 100% | Medium risk45 | —-0.090 |
| 68 | 22GO0009PREVENTIVE MAINTENANCE -TERTIARY ROADS- BACOLOD-CITY BDRY RD (S00096NR) - K0010 + 387 - K0010 + 570, K0010 + 688 - K0012 + 047,BACOLOD CITY, NEG. OCC | Negros Island Region | Bacolod City DEO | Completed | ₱28.7M | 100% | Medium risk45 | —-0.091 |
| 69 | 20GN0036CONSTRUCTION IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS -MAILUM-PATAAN ROAD LEADING TO PATAAN AND TINAGO MOUNTAIN RESORT (HIDDEN VALLEY), BRGY. MAILUM, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱41.4M | 100% | Medium risk45 | —-0.091 |
| 70 | 25GK0033PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD - K0016 + 000 - K0016 + 706 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱33.4M | 99% | Medium risk45 | —-0.069 |
| 71 | 24GL0051PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- JCT. BAGONAWA- LA CASTELLANA- ISABELA RD- K0057 + 112 - K0058 + 900, CHAINAGE 0- CHAINAGE 17 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱44.1M | 100% | Medium risk45 | —-0.089 |
| 72 | 25GO0122PREVENTIVE MAINTENANCE OF ROAD- ASPHALT OVERLAY BACOLOD CIRCUMFERENTIAL RD - K0007 + 634 K0008 +000, K 8+000- K0008+ 414 , K0008+ 414 -K0008+484, K0008+484 - K0008 + 634 | Negros Island Region | Bacolod City DEO | Completed | ₱44M | 100% | Medium risk45 | —-0.090 |
| 73 | 24GK0174PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (S00024NR) - K0005+(-135) - K0006+157, (S00025NR) - K0006+022 - K0006+894 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱39.2M | 100% | Medium risk45 | —-0.090 |
| 74 | 20GK0140PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY WITH CORRECTION AT SPECIFIC LOCATIONS ALONG BACOLOD NORTH RD (S00406NR) K0025+000 - K0032+003 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱30.7M | 100% | Medium risk45 | —-0.091 |
| 75 | 22GK0128PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (S00389NR) - K0010+204 - K0011+981 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱42.3M | 100% | Medium risk45 | —-0.091 |