Contractor dossier
140 projects on file, including joint ventures this contractor is part of.
Total projects
140
Total budget
₱5.3B
Average progress
96.8%
Completion rate
81.4%
Average risk score
49.7
Medium risk on average, out of 100
Flagged as unusual
3
2.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 129 | ₱4.9B | 49.9 | 3 | 96.6% |
| Region VI | 11 | ₱423.2M | 47.2 | 0 | 98.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱4.1B | 47.6 | 0 | 98.7% |
| Flood Control and Drainage | 13 | ₱907.2M | 54.1 | 1 | 90.7% |
| GAA 2025 SSP | 2 | ₱138.1M | 95.4 | 1 | 55.4% |
| GAA 2025 OO-1 | 2 | ₱50.6M | 92.0 | 1 | 64.8% |
| Bridges | 2 | ₱16.4M | 45.3 | 0 | 100.0% |
| OTHER | 1 | ₱10.4M | 73.3 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱49.5M | 48.5 | 0 | 89.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25RC0003REHABILITATION AND WATERLINE IMPROVEMENT, KABANKALAN CITY WATER DISTRICT, BARANGAY 8, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱99M | 11% | High risk96 | Flagged0.042 |
| 25GL0015PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG BACOLOD SOUTH RD - K0078 + 650 - K0079+307 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱39.2M | 100% | High risk95 | —-0.015 |
| 25GM0008OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN-BAIS RD - K0096+000 - K0096+569, K0097+646 - K0098+000, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱39.7M | 37% | High risk92 | Flagged0.008 |
| 25HK0041ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG BAIS-KABANKALAN ROAD-K0078+403-K0078+873,MABINAY,NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱11M | 92% | High risk92 | —-0.010 |
| 21GL0050PREVENTIVE MAINTENANCE ALONG PRIMARY RD , BACOLOD SOUTH RD (S00134NR) K0047 + 000 - K0047 + 487 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱10.4M | 100% | High risk73 | —-0.033 |
| 25HJ0015ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG HIBAIYO RIVER, GUIHULNGAN | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱48.5M | 100% | High risk71 | —-0.021 |
| 25GN0006ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD - K0040+765- K0042+647 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱79.6M | 100% | High risk70 | —-0.037 |
| 25HK0040ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - BAIS - KABANKALAN RD - K0094+000 - K0095+000 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱63.9M | 93% | High risk70 | —-0.037 |
| 25GN0005ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT. PONTEVEDRA - LA CASTELLANA ROAD - K0052+806 - K0053+140, K0053+813 - K0054+655 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱28.7M | 100% | High risk66 | —-0.042 |
| 24GN0016ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - ASPHALT OVERLAY- BACOLOD SOUTH ROAD-K0011+(-469) - K0011+000, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱17M | 100% | High risk66 | —-0.031 |
| 25GN0061ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT SAN ENRIQUE - PONTEVEDRA BY-PASS ROAD - K0043+000 - K0044+989, K00045+497 - K0045+821, K0046+079 - K0046+365 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱44.6M | 90% | High risk66 | —-0.039 |
| 24GN0019ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - ASPHALT OVERLAY - BACOLOD SOUTH BY-PASS ROAD - K0019+(-175) - K0019+663 | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱30M | 100% | High risk66 | —-0.060 |
| 25RH0003SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG BAIS - KABANKALAN ROAD - K0058+869 - K0059+135, K0060+300 - K0060+502 | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱18.1M | 100% | High risk66 | —-0.040 |
| 24GN0017ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-BACOLOD SOUTH ROAD-K0024+(-036)-K0024+331,PULUPANDAN,NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱13.3M | 100% | High risk66 | —-0.031 |
| 25G00062CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG- HILABANGAN RIVER (DOWNSTREAM OF APPROACH A OF ILOG BR.), ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱181.5M | 79% | High risk65 | —-0.011 |
| 25G00070CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MINULU- AN RIVER (BOTHSTREAM) AT BACOLOD NORTH RD, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱179.7M | 0% | High risk65 | Flagged0.010 |
| 25GN0011ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BACOLOD SOUTH ROAD (GEN. LUNA - BAGO HIGH SCHOOL ROAD) K0022+200 - K0022+317 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱5.5M | 100% | High risk65 | —-0.042 |
| 25GN0012PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG BACOLOD SOUTH ROAD - (S00210NR) CHAINAGE 032 - CHAINAGE 076, CHAINAGE 076 - CHAINAGE 217, CHAINAGE 217 - CHAINAGE 261 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱7.4M | 100% | High risk65 | —-0.041 |
| 24GM0017CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG-HILABANGAN RIVER (UPSTREAM OF APPROACH A OF ILOG BR.) PHASE 2, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱125.5M | 100% | High risk63 | —-0.050 |
| 24GK0191CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. RAFAELA, SAGAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.053 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25RC0003REHABILITATION AND WATERLINE IMPROVEMENT, KABANKALAN CITY WATER DISTRICT, BARANGAY 8, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱99M | 11% | High risk96 | Flagged0.042 |
| 25G00070CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MINULU- AN RIVER (BOTHSTREAM) AT BACOLOD NORTH RD, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱179.7M | 0% | High risk65 | Flagged0.010 |
| 25GM0008OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN-BAIS RD - K0096+000 - K0096+569, K0097+646 - K0098+000, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱39.7M | 37% | High risk92 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 25GO0094PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY, BACOLOD SILAY AIRPORT ACCESS RD - (S00119NR) - K0007 + (-602) - K0007 + 252 | Negros Island Region | Bacolod City DEO | Completed | ₱23.7M | 100% | Medium risk45 | —-0.092 |
| 102 | 20GO0013PREVENTIVE MAINTENANCE OF ROAD : ASPHALT OVERLAY- ALONG BACOLOD NORTH RD. - K0000+000 -K0001+000 | Negros Island Region | Bacolod City DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.092 |
| 103 | 22GK0117PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00009NR) - K0014+(-437) - K0014+(-255), K0015+000 - K0016+000 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱25.6M | 100% | Medium risk45 | —-0.092 |
| 104 | 25GO0093PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY, BACOLOD-SN CARLOS RD (S00093NR) - K0009 + 383 - K0009 + 880 | Negros Island Region | Bacolod City DEO | Completed | ₱25.8M | 100% | Medium risk45 | —-0.092 |
| 105 | 24GK0127PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD - K0007+(-378) - K0007+(-129), K0007+180 - K0007+542 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱21.1M | 100% | Medium risk45 | —-0.092 |
| 106 | 22GK0151PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (S00406NR) - K0014+690 - K0014+994, K0030+063 - K0030+271, K0030+745 - K0031+027, K0033+000 - K0033+135, K0033+185 - K0033+210 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱20.1M | 100% | Medium risk45 | —-0.093 |
| 107 | 23GK0120RECONSTRUCTION TO CONCRETE PAVEMENT: BACOLOD NORTH ROAD (S00406NR) - K0018+099 - K0018+164, K0022+000 - K0022+451, K0022+520 - K0023+080 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱28M | 100% | Medium risk45 | —-0.093 |
| 108 | 23GK0117RECONSTRUCTION TO CONCRETE PAVEMENT: BACOLOD NORTH RD (S00026NR) - K0007+(-129) - K0007+000, K0007+937 - K0008+224, K0007+542 - K0007+937 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱21.7M | 100% | Medium risk45 | —-0.093 |
| 109 | 24GQ0003PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG BACOLOD NORTH RD (S00425NR) - K0125+566 - K0125+946 | Region VI | Region VI | Completed | ₱9.3M | 100% | Medium risk45 | —-0.082 |
| 110 | 25GL0098IMPROVEMENT OF INTERSECTION AT BACOLOD SOUTH RD - K0061 + 520 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱19.4M | 97% | Medium risk45 | —-0.069 |
| 111 | 24GL0050PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- BACOLOD SOUTH RD- K0074 + 950- K0075 + 463 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.090 |
| 112 | 23GL0049PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - HINIGARAN - ISABELA ROAD -K0059+129 - K0060+150 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱27.5M | 100% | Medium risk45 | —-0.090 |
| 113 | 23GN0037PREVENTIVE MAINTENANCE - PRIMARY ROADS - BACOLOD SOUTH ROAD - (S00127NR) K0024+(-879) - K0024+(-043), BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱20.2M | 100% | Medium risk45 | —-0.091 |
| 114 | 23HL0055ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS: STA CATALINA-PAMPLONA-TANJAY CITY - K0075 + 000 - K0075 +319, K008 | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱17.6M | 100% | Medium risk45 | —-0.091 |
| 115 | 24HK0133ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD-PRIMARY ROADS-BAIS-KABANKALAN RD-K0093+586-K0094+000, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱17.2M | 100% | Medium risk45 | —-0.092 |
| 116 | 24GM0045PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PREVENTIVE MAINTENANCE ALONG BACOLOD SOUTH RD, K0084+(-179) - K0084+512, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱27.1M | 100% | Medium risk45 | —-0.090 |
| 117 | 20GN0061PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG BACOLOD SOUTH BY-PASS ROAD, K0022+192 - K0022+352, K0022+622 - K0023+000, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.091 |
| 118 | 21GO0001PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-BACOLOD NORTH RD K0003+000 - K0003+325, BACOLOD CITY, NEG.OCC | Negros Island Region | Bacolod City DEO | Completed | ₱10.1M | 100% | Medium risk44 | —-0.090 |
| 119 | 22GO0007PREVENTIVE MAINTENANCE -SECONDARY ROADS-- STO NIÑO-BANAGO RD (SOUTH) (S00102NR) - K0001 + (-112) - K0001 + 000, K0001 + (-248) - K0001 + (-112), K0001 + (-291) - K0001 + (-248), K0001 + (-417) - K0001 + (-291), K0001 + 000 - K0001 + 371,BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱13M | 100% | Medium risk44 | —-0.092 |
| 120 | 20GK0134PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY WITH CORRECTION ALONG BACOLOD NORTH RD (S00406NR) K0022+520 - K0023+080 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱10.1M | 100% | Medium risk44 | —-0.092 |
| 121 | 22GO0005PREVENTIVE MAINTENANCE- SECONDARY ROADS-BACOLOD CIRCUMFERENTIAL RD ( S00130NR)- K0007+000-K0007+634,BACOLOD CITY, NEG. OCC | Negros Island Region | Bacolod City DEO | Completed | ₱12.8M | 100% | Medium risk44 | —-0.092 |
| 122 | 21GK0005PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY WITH CORRECTION ALONG BACOLOD NORTH RD (S00406NR) - K0032+353 - K0032+639 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱5.5M | 100% | Medium risk44 | —-0.088 |
| 123 | 25GL0104IMPROVEMENT OF INTERSECTION AT BACOLOD SOUTH RD - K0071 + 570 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱10.7M | 100% | Medium risk44 | —-0.069 |
| 124 | 20GN0057ASPHALT OVERLAY - JCT. PONTEVEDRA - LA CASTELLANA ROAD (S00200NR), K0048+805 - K0050+000, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.089 |
| 125 | 22GL0042PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BINALBAGAN-ISABELA RD (S00419NR) - K0067 + 203 - K0068 + 165, K0068 + 236 - K0068 + 393 | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱11.5M | 100% | Medium risk44 | —-0.092 |