Opening the dossier…
Opening the dossier…
Contractor dossier
4 projects on file, including joint ventures this contractor is part of.
Total projects
4
Total budget
₱211.9M
Average progress
69.7%
Completion rate
25.0%
Below 70%
Average risk score
54.2
Medium risk on average, out of 100
Flagged as unusual
2
50.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 4 | ₱211.9M | 54.2 | 2 | 69.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 2 | ₱134.8M | 56.2 | 1 | 58.1% |
| Flood Control and Drainage | 1 | ₱47.7M | 56.8 | 1 | 69.5% |
| Bridges | 1 | ₱29.4M | 47.5 | 0 | 93.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LD0220CONSTRUCTION OF COASTAL ROAD INCLUDING BIKE LANES WITH SOLAR LIGHTS (APLAYA-DAWIS SECTION, PHASE 2, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.6M | 16% | High risk65 | Flagged0.037 |
| 24LD0214CONSTRUCTION OF FLOOD CONTROL STRUCTURE- CONCRETE REVETMENT ALONG BALUTAKAY RIVER (DOMINGO V. ABAWAG ES TO IGPIT SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱47.7M | 70% | Medium risk57 | Flagged0.027 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24LD0220CONSTRUCTION OF COASTAL ROAD INCLUDING BIKE LANES WITH SOLAR LIGHTS (APLAYA-DAWIS SECTION, PHASE 2, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.6M | 16% | High risk65 | Flagged0.037 |
| 2 | 24LD0214CONSTRUCTION OF FLOOD CONTROL STRUCTURE- CONCRETE REVETMENT ALONG BALUTAKAY RIVER (DOMINGO V. ABAWAG ES TO IGPIT SECTION), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱47.7M | 70% | Medium risk57 | Flagged0.027 |
| 3 | 24LD0121CONSTRUCTION OF COASTAL ROAD (APLAYA- DAWIS SECTION, PHASE 3), DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.089 |
| 4 | 24LD0070CONSTRUCTION OF STA. TERESITA BRIDGE, MALALAG, MALALAG, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱29.4M | 93% | Medium risk48 | —-0.023 |