Contractor dossier
11 projects on file, including joint ventures this contractor is part of.
Total projects
11
Total budget
₱106.2M
Average progress
99.2%
Completion rate
90.9%
Average risk score
28.6
Low risk on average, out of 100
Flagged as unusual
1
9.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 11 | ₱106.2M | 28.6 | 1 | 99.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 6 | ₱28.6M | 19.5 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱39.1M | 26.6 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱31.5M | 93.7 | 1 | 91.0% |
| Roads | 1 | ₱6.9M | 24.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱31.5M | 91% | High risk94 | Flagged0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱31.5M | 91% | High risk94 | Flagged0.015 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25MC0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 4, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱31.5M | 91% | High risk94 | Flagged0.015 |
| 2 | 23MH0074CONSTRUCTION OF SOLAR WATER SYSTEM, LEBAK, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱14.7M | 100% | Low risk27 | —-0.053 |
| 3 | 23MH0073CONSTRUCTION OF SOLAR WATER SYSTEM, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱14.7M | 100% | Low risk26 | —-0.053 |
| 4 | 23MH0072CONSTRUCTION OF SOLAR WATER SYSTEM, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱9.7M | 100% | Low risk26 | —-0.053 |
| 5 | 22MI0089CONSTRUCTION OF ROAD IN BARANGAY LATAGAN, MATALAM, NORTH COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱6.9M | 100% | Low risk24 | —-0.089 |
| 6 | 21MC0026CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DALLAG, ARAKAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.9M | 100% | Low risk22 | —-0.086 |
| 7 | 23MC0046CONSTRUCTION OF 2-STOREY MULTI-PURPOSE BUILDING, BARANGAY NAJE, ARAKAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.9M | 100% | Low risk22 | —-0.087 |
| 8 | 22MC0069CONSTRUCTION OF TWO (2) STOREY MULTI-PURPOSE BUILDING, BARANGAY BINOONGAN, ARAKAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.9M | 100% | Low risk22 | —-0.086 |
| 9 | 23MC0062CONSTRUCTION OF MULTI-PURPOSE BUILDING (ACADEMIC BUILDING) IN THE PROPOSED UNIVERSITY OF SOUTHERN MINDANAO (USM)-ANTIPAS EXTENSION CAMPUS, ANTIPAS, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.9M | 100% | Low risk21 | —-0.087 |
| 10 | 22MC0072CONSTRUCTION OF TWO (2) STOREY MULTI-PURPOSE BUILDING, BARANGAY MAKALANGOT, ARAKAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.9M | 100% | Low risk21 | —-0.087 |
| 11 | 21MC0056REHABILITATION/IMPROVEMENT OF MULTI-PURPOSE BUILDING, BARANGAY MALATAB, ANTIPAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4M | 100% | Low risk8 | —-0.087 |