Contractor dossier
203 projects on file, including joint ventures this contractor is part of.
Total projects
203
Total budget
₱5.8B
Average progress
97.4%
Completion rate
75.9%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
1
0.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 203 | ₱5.8B | 51.3 | 1 | 97.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 89 | ₱3B | 48.9 | 1 | 99.6% |
| Buildings and Facilities | 52 | ₱433.6M | 45.4 | 0 | 97.5% |
| Flood Control and Drainage | 28 | ₱1.4B | 50.6 | 0 | 99.7% |
| Water Provision and Storage | 16 | ₱160M | 47.8 | 0 | 98.8% |
| GAA 2025 OO-1 | 9 | ₱590.7M | 94.2 | 0 | 79.2% |
| GAA 2025 OO-2 | 3 | ₱170.5M | 89.7 | 0 | 54.4% |
| Bridges | 3 | ₱76.1M | 48.6 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱9.7M | 94.6 | 0 | 95.6% |
| OTHER | 1 | ₱5M | 72.4 | 0 | 87.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0116ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0347 + 000 - K0349 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 87% | High risk96 | —-0.003 |
| 25DM0115ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0345 + 000 - K0347 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 92% | High risk96 | —-0.004 |
| 25DM0117ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES- SN NARCISO RD - K0343 + 000 - K0345 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 92% | High risk96 | —-0.004 |
| 25DM0126ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0351 + (-700) - K0353 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 85% | High risk96 | —-0.003 |
| 25DM0125ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0349 + 000 - K0351 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 89% | High risk96 | —-0.004 |
| 25DJ0029CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY POBLACION 1, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.9M | 91% | High risk95 | —-0.005 |
| 25DJ0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY MASIN SUR, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | —-0.009 |
| 25DJ0115OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, QUEZON-BATANGAS RD - K0101 + 725 - K0102 + 425 | Region IV-A | Quezon 2nd DEO | On-Going | ₱47.5M | 63% | High risk94 | —-0.004 |
| 25DJ0082OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL STRUCTURE, PACKAGE 5, LUCE | Region IV-A | Quezon 2nd DEO | On-Going | ₱137.1M | 64% | High risk93 | —-0.008 |
| 25DJ0114OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, PAGBILAO-DALAHICAN PORT RD (OLD MSR-MAYAO-TALAO-TALAO-DALAHICAN PORT) - (S06106LZ) CHAINAGE 10 - CHAINAGE 213, CHAINAGE 246 - CHAINAGE 690 | Region IV-A | Quezon 2nd DEO | On-Going | ₱47.5M | 47% | High risk93 | —-0.003 |
| 25DJ0111OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, LUCENA COTTA PORT RD - K0132 + (-030) - K0132 + 290 | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.5M | 57% | High risk92 | —-0.003 |
| 25DJ0113OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, CANDELARIA BYPASS RD - K0106+935 - K0107+124.5 | Region IV-A | Quezon 2nd DEO | On-Going | ₱18.1M | 100% | High risk91 | —-0.018 |
| 25DJ0120OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SMALL RIVER IMPROVEMENT PROJECT, PILI PIP, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱14.3M | 77% | High risk88 | —-0.029 |
| 25DJ0083OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE, BARANGAY 10, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱19.2M | 22% | High risk88 | —-0.014 |
| 24DJ0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY STA. LUCIA, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱5M | 87% | High risk72 | —-0.007 |
| 24DJ0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LALIG, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 97% | High risk72 | —-0.035 |
| 22DJ0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS) CONSTRUCTION OF AFP RESERVE CENTERS (AFPRCENS), CAMP GUILL | Region IV-A | Quezon 2nd DEO | Completed | ₱14.7M | 100% | High risk67 | —-0.070 |
| 20DM0034ASSET PRESERVATION: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-MULANAY-SAN FRANCISCO RD-K0291+106-K029+156 | Region IV-A | Quezon 3rd DEO | Completed | ₱13.7M | 100% | High risk64 | —-0.069 |
| 23DJ0117CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 11), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 90% | High risk64 | —-0.022 |
| 22DJ0131OO2: PROTECTION LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (UPSTREAM-PACKAGE 5), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DJ0190CONCRETING OF BRGY. PILI FMR, BRGY. PILI, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.8M | 91% | High risk61 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 22DJ0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, PREVENTIVE MAINTENANCE ALONG LUCENA-DALAHICAN PORT RD-K0133+511-K0133+872 | Region IV-A | Quezon 2nd DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.106 |
| 152 | 18DM0034PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0216+593 - K0217+014, K0235+749 - K0236+254, K0246+977 - K0247+773, K0248+800 - K0249+200, K0291+400 - K0292+505, GUMACA - PITOGO - MULANAY - SN NARCISO RD | Region IV-A | Quezon 3rd DEO | Completed | ₱27M | 100% | Medium risk46 | —-0.104 |
| 153 | 18DM0064CONSTRUCTION OF DRAINAGE STRUCTURE ALONG GUMACA-PITOGO-MULANAY-SN NARCISO RD, K0272+940-K0273+440, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.104 |
| 154 | 22DM0041ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MULANAY-SN FRANCISCO RD - K0277 + 000 - K0278 + 000, K0282 + 000 - K0282 + 280, K0282 + 740 - K0283 + 000, K0300 + 700 - K0300 + 900, K0308 + 100 - K0309 + 000MULANAY & SAN FRANCISCO | Region IV-A | Quezon 3rd DEO | Completed | ₱19.3M | 100% | Medium risk46 | —-0.105 |
| 155 | 20DM0016ASSET PRESERVATION: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0218+558 - K0218+617, K0220+778 - K0220+856, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.106 |
| 156 | 22DM0062CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT F. NAÑADIEGO, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.101 |
| 157 | 24DJ0096CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BRGY. KINATIHAN 2, CANDELARIA, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | On-Going | ₱5.8M | 99% | Medium risk46 | —-0.069 |
| 158 | 24DJ0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BUKAL, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱11.9M | 100% | Medium risk46 | —-0.110 |
| 159 | 18DM0019CONSTRUCTION OF MULTIPURPOSE BUILDING (TRAINING CENTER), BRGY. PACABIT, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.100 |
| 160 | 24DJ0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY ANASTACIA, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱11.9M | 100% | Medium risk46 | —-0.111 |
| 161 | 23DJ0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SAN PEDRO, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.108 |
| 162 | 21DJ0029OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS, CANDELARIA BYPASS RD-K0107+213-K0107+560 CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.107 |
| 163 | 22DJ0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD AT MARTINEZ ST., BA | Region IV-A | Quezon 2nd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.110 |
| 164 | 24DJ0097CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BRGY. SAN ANDRES, CANDELARIA, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | On-Going | ₱5.9M | 97% | Medium risk46 | —-0.070 |
| 165 | 22DJ0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ECO-TOURISM ROAD-BRGY. RANSO | Region IV-A | Quezon 2nd DEO | Completed | ₱11M | 100% | Medium risk46 | —-0.109 |
| 166 | 22DJ0145CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONCRETING/REHABILITATION OF ROAD, ST. JOHN STREET, ST. PETER II SUBDI | Region IV-A | Quezon 2nd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.109 |
| 167 | 22DJ0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF ROAD, (DALEON ST., NORTH EMPLOYEES VILLAGE), BARANGAY | Region IV-A | Quezon 2nd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.109 |
| 168 | 24DJ0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BRGY. CORAZON, SAN ANTONIO, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.106 |
| 169 | 24DJ0094CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY PAHINGA SUR, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.107 |
| 170 | 23DJ0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SAN ISIDRO, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 171 | 23DJ0118CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), CONSTRUCTION OF QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD, SARIAYA | Region IV-A | Quezon 2nd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.108 |
| 172 | 23DJ0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BUKAL, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.107 |
| 173 | 21DJ0042LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF LOCAL ROAD AT VILLA ROSARIO SUBDIVISION, BARANGAY QUIPOT, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 174 | 23DJ0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONSTRUCTION OF ROAD, BARANGAY LAGALAG, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 175 | 23DJ0058CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY JANAGDONG 1, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.107 |