Contractor dossier
203 projects on file, including joint ventures this contractor is part of.
Total projects
203
Total budget
₱5.8B
Average progress
97.4%
Completion rate
75.9%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
1
0.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 203 | ₱5.8B | 51.3 | 1 | 97.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 89 | ₱3B | 48.9 | 1 | 99.6% |
| Buildings and Facilities | 52 | ₱433.6M | 45.4 | 0 | 97.5% |
| Flood Control and Drainage | 28 | ₱1.4B | 50.6 | 0 | 99.7% |
| Water Provision and Storage | 16 | ₱160M | 47.8 | 0 | 98.8% |
| GAA 2025 OO-1 | 9 | ₱590.7M | 94.2 | 0 | 79.2% |
| GAA 2025 OO-2 | 3 | ₱170.5M | 89.7 | 0 | 54.4% |
| Bridges | 3 | ₱76.1M | 48.6 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱9.7M | 94.6 | 0 | 95.6% |
| OTHER | 1 | ₱5M | 72.4 | 0 | 87.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0116ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0347 + 000 - K0349 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 87% | High risk96 | —-0.003 |
| 25DM0115ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0345 + 000 - K0347 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 92% | High risk96 | —-0.004 |
| 25DM0117ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES- SN NARCISO RD - K0343 + 000 - K0345 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 92% | High risk96 | —-0.004 |
| 25DM0126ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0351 + (-700) - K0353 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 85% | High risk96 | —-0.003 |
| 25DM0125ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0349 + 000 - K0351 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 89% | High risk96 | —-0.004 |
| 25DJ0029CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY POBLACION 1, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.9M | 91% | High risk95 | —-0.005 |
| 25DJ0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY MASIN SUR, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | —-0.009 |
| 25DJ0115OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, QUEZON-BATANGAS RD - K0101 + 725 - K0102 + 425 | Region IV-A | Quezon 2nd DEO | On-Going | ₱47.5M | 63% | High risk94 | —-0.004 |
| 25DJ0082OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL STRUCTURE, PACKAGE 5, LUCE | Region IV-A | Quezon 2nd DEO | On-Going | ₱137.1M | 64% | High risk93 | —-0.008 |
| 25DJ0114OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, PAGBILAO-DALAHICAN PORT RD (OLD MSR-MAYAO-TALAO-TALAO-DALAHICAN PORT) - (S06106LZ) CHAINAGE 10 - CHAINAGE 213, CHAINAGE 246 - CHAINAGE 690 | Region IV-A | Quezon 2nd DEO | On-Going | ₱47.5M | 47% | High risk93 | —-0.003 |
| 25DJ0111OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, LUCENA COTTA PORT RD - K0132 + (-030) - K0132 + 290 | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.5M | 57% | High risk92 | —-0.003 |
| 25DJ0113OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, CANDELARIA BYPASS RD - K0106+935 - K0107+124.5 | Region IV-A | Quezon 2nd DEO | On-Going | ₱18.1M | 100% | High risk91 | —-0.018 |
| 25DJ0120OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SMALL RIVER IMPROVEMENT PROJECT, PILI PIP, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱14.3M | 77% | High risk88 | —-0.029 |
| 25DJ0083OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE, BARANGAY 10, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱19.2M | 22% | High risk88 | —-0.014 |
| 24DJ0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY STA. LUCIA, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱5M | 87% | High risk72 | —-0.007 |
| 24DJ0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LALIG, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 97% | High risk72 | —-0.035 |
| 22DJ0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS) CONSTRUCTION OF AFP RESERVE CENTERS (AFPRCENS), CAMP GUILL | Region IV-A | Quezon 2nd DEO | Completed | ₱14.7M | 100% | High risk67 | —-0.070 |
| 20DM0034ASSET PRESERVATION: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-MULANAY-SAN FRANCISCO RD-K0291+106-K029+156 | Region IV-A | Quezon 3rd DEO | Completed | ₱13.7M | 100% | High risk64 | —-0.069 |
| 23DJ0117CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 11), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 90% | High risk64 | —-0.022 |
| 22DJ0131OO2: PROTECTION LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (UPSTREAM-PACKAGE 5), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DJ0190CONCRETING OF BRGY. PILI FMR, BRGY. PILI, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.8M | 91% | High risk61 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 23DJ0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF ROAD BARANGAY SAN ANDRES, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.108 |
| 177 | 20DM0033ASSET PRESERVATION: RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-MSR JCT-LOPEZ-BUENAVISTA-K0238+(-1010)-K0238+(-955), BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱7.8M | 100% | Medium risk46 | —-0.105 |
| 178 | 19DM0011ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - TERTIARY ROADS - CATANAUAN-BUENAVISTA RD - K0255+335 - K0255+868, K0261+901 - K0262+153, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱13M | 100% | Medium risk46 | —-0.106 |
| 179 | 18DM0018CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), BRGY. TAGBAKAN ILAYA, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.101 |
| 180 | 24DJ0176CONSTRUCTION OF 3-STOREY, 12-CLASSROOM SCHOOL BUILDING IN NIING ELEMENTARY SCHOOL, BARANGAY NIING, SAN ANTONIO, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | On-Going | ₱29.3M | 100% | Medium risk46 | —-0.016 |
| 181 | 21DK0056CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, BURDEOS, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱5M | 100% | Medium risk44 | —-0.099 |
| 182 | 23DJ0176CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, SITIO BUGNAW, BRGY. PA | Region IV-A | Quezon 2nd DEO | Completed | ₱9.7M | 100% | Medium risk43 | —-0.057 |
| 183 | 23DJ0137CONCRETING OF BRGY. SAN ISIDRO FMR, BRGY. SAN ISIDRO, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱10.9M | 100% | Medium risk43 | —-0.057 |
| 184 | 23DJ0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BRGY. SAN MATEO, DOLOR | Region IV-A | Quezon 2nd DEO | Completed | ₱9.7M | 100% | Medium risk43 | —-0.056 |
| 185 | 21DJ0097CONCRETING OF BRGY. BIGNAY 2 FMR, BIGNAY 2, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱9.8M | 100% | Medium risk43 | —-0.053 |
| 186 | 23DJ0154OPENING AND CONCRETING OF BRGY. BULIHAN FMR, BRGY. BULIHAN, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱11.9M | 85% | Medium risk42 | —-0.002 |
| 187 | 20DJ0106CONCRETING OF BRGY. CABAY FMR, BRGY. CABAY, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱11.9M | 100% | Medium risk42 | —-0.056 |
| 188 | 22DJ0166CONCRETING OF SITIO HACIENDA MALOLES FMR, BRGY. STA. CATALINA SUR, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱11.9M | 100% | Medium risk42 | —-0.055 |
| 189 | 21DJ0120CONCRETING OF BRGY. MASALUKOT 2 FMR, BRGY. MASALUKOT 2, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱11.9M | 100% | Medium risk42 | —-0.057 |
| 190 | 22DJ0167CONCRETING OF BRGY. SAN MATEO FMR, BRGY. SAN MATEO, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱11.9M | 100% | Medium risk42 | —-0.053 |
| 191 | 22DJ0165CONCRETING OF SITIO ALIB FMR, BRGY. GUISGUIS TALON, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱11.9M | 100% | Medium risk42 | —-0.056 |
| 192 | 17DJ0055CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOMS ACADEMIC SCHOOL BUILDING AT RECTO MEMORIAL NATIONAL HIGH SCHOOL, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱20.2M | 100% | Medium risk41 | —-0.030 |
| 193 | 17DM0137CONSTRUCTION OF VARIOUS WORKSHOP SCHOOL BUILDING AT MALAYA NHS, GEN. LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱24.4M | 100% | Medium risk39 | —-0.028 |
| 194 | 17DM0163CONSTRUCTION OF TWO-STOREY SIX-CLASSROOM SCHOOL BUILDING AT UNISAN NHS, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱12.2M | 100% | Medium risk39 | —-0.030 |
| 195 | 17DK0212CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING (SCIENCE LABORATORY) @ SABANG NATIONAL HIGH SCHOOL, POLILLO, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱7.1M | 100% | Medium risk39 | —-0.030 |
| 196 | 17DK0213CONSTRUCTION OF TWO(2) UNITS ONE STOREY WORKSHOP BUILDING (INFORMATION COMMUNICATION TECHNOLOGY LABORATORY) @ SABANG NATIONAL HIGH SCHOOL, POLILLO, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱7.1M | 100% | Medium risk39 | —-0.030 |
| 197 | 17DK0220CONSTRUCTION OF TWO(2) UNITS TWO(2) STOREY FOUR(4) CLASSROOM SCHOOL BUILDING @ POLILLO NATIONAL HIGH SCHOOL, POLILLO ANNEX, POLILLO, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱18.6M | 100% | Medium risk39 | —-0.028 |
| 198 | 18DM0057CONSTRUCTION OF MULTIPURPOSE HALL, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.099 |
| 199 | 25DJ0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MANGGAHAN, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱2.9M | 100% | Low risk25 | —-0.073 |
| 200 | 24DJ0088CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MAGSAYSAY, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱2.5M | 88% | Low risk24 | —-0.054 |