Contractor dossier
523 projects on file, including joint ventures this contractor is part of.
Total projects
523
Total budget
₱38.5B
Average progress
89.7%
Completion rate
69.2%
Below 70%
Average risk score
57.0
Medium risk on average, out of 100
Flagged as unusual
71
13.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 407 | ₱33B | 57.9 | 58 | 88.9% |
| Negros Island Region | 114 | ₱5.3B | 54.0 | 13 | 92.5% |
| Region VII | 2 | ₱182.6M | 54.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 362 | ₱22.9B | 52.2 | 13 | 94.2% |
| Flood Control and Drainage | 74 | ₱6.4B | 58.6 | 9 | 89.7% |
| Bridges | 23 | ₱2.2B | 58.2 | 8 | 83.6% |
| OTHER | 20 | ₱2B | 75.9 | 11 | 82.3% |
| GAA 2025 OO-1 | 18 | ₱1.7B | 94.7 | 14 | 58.1% |
| GAA 2025 OO-2 | 11 | ₱1.5B | 93.8 | 10 | 37.6% |
| Bridges, Roads | 10 | ₱1.2B | 62.9 | 3 | 87.7% |
| Buildings and Facilities | 4 | ₱514.6M | 68.0 | 2 | 63.6% |
| GAA 2025 SSP | 1 | ₱128.6M | 96.0 | 1 | 3.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25G00072CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱128.6M | 3% | High risk96 | Flagged0.056 |
| 25GB0067PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BANTAYAN - SN PEDRO - CUBAY RD - K0104+000 - K0106+103, ANTIQUE | Region VI | Antique DEO | On-Going | ₱93.6M | 37% | High risk96 | Flagged0.021 |
| 25GK0132PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD - K0038 + 829 - K0038 + 909, K0039 + 596 - K0039 + 727, K0041 + 000 - K0041 + 358, K0045 + 965 - K0046 + 093, K0048 + 384 - K0049 + 366, K0060 + 670 - K0061 + 630, K0088 + 294 - K0088 + 59 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱141.6M | 81% | High risk95 | Flagged0.011 |
| 25GO0141PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY BACOLOD CIRCUMFERENTIAL RD - K0003 + (-535) - K0006 +000 | Negros Island Region | Bacolod City DEO | On-Going | ₱141.6M | 53% | High risk95 | Flagged0.018 |
| 25GB0070PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ODIONG - SIBALOM - SN REMIGIO - LEON RD - K0113+174 - K0117+000, ANTIQUE | Region VI | Antique DEO | On-Going | ₱113.8M | 10% | High risk95 | Flagged0.032 |
| 25GK0114PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - JCT NAT'L RD SAGAY-BATO-DIAN-MARCELO-BALEA JCT RD K0098 + 000 - K0099 + 194, K0099 + 639 - K0102 + 462 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱141.6M | 94% | High risk95 | Flagged0.007 |
| 25GK0124PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (OLD ROUTE) - K0074 + 800 - K0076 + 666 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱143.5M | 9% | High risk95 | Flagged0.034 |
| 25GK0131PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - JCT NAT'L RD SAGAY-BATO-DIAN-MARCELO-BALEA JCT RD K0084 + (-966) - K0085 + 000, K0085 + 361 - K0085 + 484, K0085 + 776 - K0086 + 000, K0087 + 000 - K0087 + 360 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱143.5M | 16% | High risk95 | Flagged0.032 |
| 25GL0109PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY -VALLEHERMOSO-CANLAON CITY-LA CASTELLANA RD - K0065 + 092 - K0066 + 617 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱97.4M | 61% | High risk95 | Flagged0.010 |
| 25HJ0146ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROAD-DUMAGUETE NORTH RD (JCT BAIS-KABANKALAN-NEGROS OCC BDRY) - K0051 + (-343) - K0051 + 765, K0051 + 790 - K0052 + 650, MANJUYOD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱70.4M | 94% | High risk95 | —-0.006 |
| 25GL0106PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BINALBAGANISABELA RD - K0062 + 000 - K0063 + 250, K0065 + 435 - K0066 + 511, CHAINAGE 0 - CHAINAGE 29 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱72M | 35% | High risk95 | Flagged0.011 |
| 25G00040KALIBO CIRCUMFERENTIAL ROAD (MAKATO- LEZO SECTION), AKLAN | Region VI | Region VI | On-Going | ₱48M | 82% | High risk95 | —-0.001 |
| 25GO0140PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY BACOLOD SOUTH RD - K0000 + 000 - K0002 +982, K0003 + 300 - K0004 + 085 | Negros Island Region | Bacolod City DEO | On-Going | ₱141.6M | 100% | High risk95 | Flagged0.005 |
| 25GL0105PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - HINIGARANISABELA RD - K0063 + 100 - K0065 + 163 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱69.6M | 42% | High risk95 | Flagged0.008 |
| 25GL0101PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD SOUTH RD - K0064 + 538 - K0065 + 364 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱54.2M | 52% | High risk95 | Flagged0.004 |
| 25GL0110PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD SOUTH RD - K0055 + 174 - K0056 + 000, K0056 + 570 - K0056 + 720 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱63.8M | 68% | High risk95 | Flagged0.003 |
| 25G00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUAGE RIVER, SECTION 9, JANIUAY, ILOILO | Region VI | Region VI | On-Going | ₱147.4M | 1% | High risk94 | Flagged0.029 |
| 25G00038CONSTRUCTION OF FLOOD CONTROL ALONG JALAUR RIVER IN CALINOG, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱145M | 0% | High risk94 | Flagged0.027 |
| 25G00039CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ULIAN RIVER, SECTION 8, DUEÑAS, ILOILO | Region VI | Region VI | On-Going | ₱147.4M | 22% | High risk94 | Flagged0.023 |
| 25G00020CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG SUAGE RIVER IN JANIUAY, ILOILO (PACKAGE 6) | Region VI | Region VI | On-Going | ₱145M | 44% | High risk94 | Flagged0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24GR0003CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG JALAUR RIVER(PACKAGE 3), CALINOG, ILOILO | Region VI | Iloilo 6th DEO | On-Going | ₱140.2M | 46% | High risk83 | Flagged0.067 |
| 24GG0274CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ULIAN RIVER, LAMBUNAO, ILOILO (SECTION 2) | Region VI | Iloilo 2nd DEO | On-Going | ₱120M | 38% | High risk83 | Flagged0.065 |
| 22G00140CONSTRUCTION OF ROAD, ILOILO RIVER NORTH BANK ROAD EXTENSION, OTON, ILOILO | Region VI | Region VI | On-Going | ₱289.5M | 73% | High risk85 | Flagged0.057 |
| 25G00072CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | Region VI | On-Going | ₱128.6M | 3% | High risk96 | Flagged0.056 |
| 21G00007ROXAS CITY CIRCUMFERENTIAL ROAD-C1 (SECTION 1), CAPIZ | Region VI | Region VI | On-Going | ₱70.4M | 33% | High risk79 | Flagged0.051 |
| 23G00063CONSTRUCTION OF PANDAN-IBAJAY ROAD, BRGY. STA. ANA, PANDAN, ANTIQUE | Region VI | Region VI | On-Going | ₱118.8M | 15% | High risk80 | Flagged0.050 |
| 24G00071CONSTRUCTION OF MULTIPURPOSE FACILITIES, MALAY, AKLAN PACKAGE 1 | Region VI | Region VI | On-Going | ₱296.2M | 0% | High risk77 | Flagged0.044 |
| 21G00023AGANAN FLYOVER, ILOILO | Region VI | Region VI | On-Going | ₱48.3M | 0% | Medium risk50 | Flagged0.041 |
| 23G00077ILOILO RIVER NORTH BANK ROAD, ILOILO CITY | Region VI | Region VI | On-Going | ₱94.8M | 32% | High risk85 | Flagged0.039 |
| 22G00028PANAY EAST-WEST ROAD, ILOILO SECTION, ILOILO | Region VI | Region VI | On-Going | ₱147.3M | 92% | High risk85 | Flagged0.039 |
| 24GJ0070CONSTRUCTION OF DUNGON B BRIDGE, BRGY. DUNGON B, JARO, ILOILO CITY | Region VI | Iloilo City DEO | On-Going | ₱46.5M | 5% | Medium risk59 | Flagged0.034 |
| 25GK0124PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (OLD ROUTE) - K0074 + 800 - K0076 + 666 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱143.5M | 9% | High risk95 | Flagged0.034 |
| 23G00021PASSI BY-PASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱84.5M | 50% | High risk82 | Flagged0.034 |
| 25GK0131PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - JCT NAT'L RD SAGAY-BATO-DIAN-MARCELO-BALEA JCT RD K0084 + (-966) - K0085 + 000, K0085 + 361 - K0085 + 484, K0085 + 776 - K0086 + 000, K0087 + 000 - K0087 + 360 | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱143.5M | 16% | High risk95 | Flagged0.032 |
| 19G00014CONSTRUCTION OF GRAVEL ROAD AND CONCRETE BRIDGE - PANAY EAST - WEST ROAD, ILOILO | Region VI | Region VI | On-Going | ₱97.5M | 3% | High risk62 | Flagged0.032 |
| 25GB0070PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ODIONG - SIBALOM - SN REMIGIO - LEON RD - K0113+174 - K0117+000, ANTIQUE | Region VI | Antique DEO | On-Going | ₱113.8M | 10% | High risk95 | Flagged0.032 |
| 21G00131AGANAN FLYOVER, ILOILO (PHASE 2) | Region VI | Region VI | On-Going | ₱69.8M | 36% | Medium risk53 | Flagged0.031 |
| 19G00106CONSTRUCTION OF UNGKA FLYOVER (PHASE 2), BRGY. UNGKA, PAVIA, ILOILO | Region VI | Region VI | Completed | ₱190.1M | 100% | High risk66 | Flagged0.031 |
| 25G00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUAGE RIVER, SECTION 9, JANIUAY, ILOILO | Region VI | Region VI | On-Going | ₱147.4M | 1% | High risk94 | Flagged0.029 |
| 25G00024CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG JALAUR RIVER, POTOTAN, ILOILO (PACKAGE 7) | Region VI | Region VI | On-Going | ₱145M | 6% | High risk94 | Flagged0.029 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 426 | 21GI0056ROAD WIDENING - METRO ILOILO RADIAL ROAD (R-4 BY-PASS ROAD), ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱28.9M | 100% | Medium risk46 | —-0.087 |
| 427 | 22GK0116PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (S00408NR) - K0082+1002 - K0083+284, K0083+318 - K0083+340, K0083+340 - K0083+563 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱6M | 100% | Medium risk46 | —-0.087 |
| 428 | 22GK0154PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - JCT NATL RD SAGAY-BATO-DIANAY-MARCELO-BALEA JCT RD (S00019NR) - K0085+361 - K0085+420, K0085+552 - K0085+674, K0087+000 - K0087+360, K0085+420 - K0085+452 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.087 |
| 429 | 24GG0126PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG PASSI - CALINOG RD - K0061 + 257 - K0062 + 000 | Region VI | Iloilo 2nd DEO | Completed | ₱33.1M | 100% | Medium risk45 | —-0.086 |
| 430 | 20GK0158PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY WITH CORRECTION AT SPECIFIC LOCATIONS ALONG BACOLOD NORTH RD (S00406NR) K0044+000 - K0060+000 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱34.6M | 100% | Medium risk45 | —-0.090 |
| 431 | 24GK0175PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (S00406NR) K0029+273 - K0029+975, K0033+728 - K0034+330 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱37.2M | 100% | Medium risk45 | —-0.090 |
| 432 | 18GJ0131CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF REVETMENT WALL AT DUNGON CREEK SECTION 1 (BRGY. DUNGON A, JARO - BRGY. STA. ROSA, MANDURRIAO), ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱41.9M | 100% | Medium risk45 | —-0.071 |
| 433 | 23GG0148PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO - CAPIZ (NEW ROUTE) - K0046+225 - K0047+000, K0047+200 - K0047+600, K0048+000 - K0048+300, K0048+400 - K0048+565, K0049+077 - K0049+266, K0050+000 - K0050+006 | Region VI | Iloilo 2nd DEO | Completed | ₱42.4M | 100% | Medium risk45 | —-0.086 |
| 434 | 23GK0112PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - JCT NATL RD SAGAY-BATO-DIAN-MARCELO-BALEA JCT RD (S00019NR) - K0085+000 - K0085+361, K0085+420 - K0085+452, K0085+674 - K0085+776 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱7.8M | 100% | Medium risk45 | —-0.090 |
| 435 | 20GP0025PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG ILOILO-CAPIZ RD (NEW ROUTE) (S00254PN) K0092+572 - K0093+937 | Region VI | Capiz 2nd DEO | Completed | ₱13.5M | 100% | Medium risk45 | —-0.087 |
| 436 | 25GL0107PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY -ISABELALIBAS NEGROS OCC. BDRY RD - K0085 + 914 - K0087 + 000 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱41.4M | 23% | Medium risk45 | —-0.043 |
| 437 | 25GO0090PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY , BACOLOD-SN CARLOS RD - K0008 + 000 - K0008 + 731 | Negros Island Region | Bacolod City DEO | On-Going | ₱42.6M | 90% | Medium risk45 | —-0.068 |
| 438 | 21GO0072PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- BACOLOD CIRCUMFERENTIAL ROAD K0003 + (-543) + K0003 + ( -222), K0006+040-K0007+000, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱38M | 100% | Medium risk45 | —-0.090 |
| 439 | 20GK0136PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG BACOLOD NORTH RD (S00393NR) K0011+(-100) - K0010+1016 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱32.9M | 100% | Medium risk45 | —-0.091 |
| 440 | 25GO0002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD-SN CARLOS RD - K0005 + 000 - K0005 + 903 | Negros Island Region | Bacolod City DEO | Completed | ₱42.6M | 100% | Medium risk45 | —-0.091 |
| 441 | 23GQ0038PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG BACOLOD NORTH RD (S00425NR) K0122 + 000 - K0122 + 605 | Region VI | Region VI | Completed | ₱18.6M | 100% | Medium risk45 | —-0.084 |
| 442 | 22G00120CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IMBANG RIVER (UPSTREAM), STA. 2+209.30 - STA. 2+598.50, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱43.4M | 100% | Medium risk45 | —-0.064 |
| 443 | 20GB0001ANINI-Y - TOBIAS FORNIER ROAD, K0087+157 - K0088+608 | Region VI | Antique DEO | Completed | ₱21.8M | 100% | Medium risk45 | —-0.084 |
| 444 | 18GF0009CONSTRUCTION OF CUT-OFF CHANNEL AND WATERWAY ALONG GUIMBAL RIVER, GUIMBAL, ILOILO (STATION 0+(-)030 - STATION 1+000) | Region VI | Iloilo 1st DEO | Completed | ₱33.5M | 100% | Medium risk45 | —-0.071 |
| 445 | 20GA0056CONST. OF ROAD SLOPE PROTECTION STRUCTURES ALONG AKLAN WEST ROAD (KALIBO-NABAS) K0244+540- K0244+700, K0245+000- K0245+080, K0245+160- K0245+200, AKLAN WEST RD. (KALIBO-NABAS) | Region VI | Aklan DEO | Completed | ₱11.3M | 100% | Medium risk45 | —-0.085 |
| 446 | 19GH0006PREVENTIVE MAINTENANCE OF PASSI - SAN RAFAEL - LEMERY - SARA ROAD - K0090+762 - K0093+230, LEMERY, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱20.5M | 100% | Medium risk45 | —-0.085 |
| 447 | 18GF0021CONSTRUCTION OF TUMAGBOK FLOOD CONTROL PROJECT, MIAGAO, ILOILO (STATION 0+120 - STATION 0+367) | Region VI | Iloilo 1st DEO | Completed | ₱27.5M | 100% | Medium risk45 | —-0.070 |
| 448 | 21GF0028CONSTRUCTION OF TUMAGBOK FLOOD CONTROL PROJECT, MIAG-AO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.071 |
| 449 | 20GF0021CONSTRUCTION OF TUMAGBOK FLOOD CONTROL PROJECT, MIAGAO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.071 |
| 450 | 19GF0018CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF TUMAGBOK FLOOD CONTROL/RIVER CONTROL, MIAG-AO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱24.3M | 100% | Medium risk45 | —-0.072 |