Contractor dossier
194 projects on file, including joint ventures this contractor is part of.
Total projects
194
Total budget
₱2.9B
Average progress
98.6%
Completion rate
89.2%
Average risk score
43.5
Medium risk on average, out of 100
Flagged as unusual
1
0.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 194 | ₱2.9B | 43.5 | 1 | 98.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱1.7B | 43.5 | 0 | 99.2% |
| Buildings and Facilities | 62 | ₱507.1M | 38.8 | 0 | 97.7% |
| OTHER | 6 | ₱321.7M | 71.3 | 0 | 100.0% |
| Bridges | 5 | ₱160.9M | 50.8 | 0 | 100.0% |
| Flood Control and Drainage | 5 | ₱82.6M | 38.7 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱77.2M | 95.3 | 1 | 65.3% |
| GAA 2025 OO-1 | 1 | ₱60.4M | 94.0 | 0 | 87.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
| 25DD0096ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - PRIMARY ROADS, MANILA-BATANGAS RD - K0089 + 031 - K0089 + 941, K0090 + 024 - K0090 + 067, K0091 + 080 - K0091 + 630 | Region IV-A | Batangas 4th DEO | On-Going | ₱60.4M | 88% | High risk94 | —-0.012 |
| 24DD0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROADS AND IMPROVEMENT OF BARANGAY MARILAG TO BARA | Region IV-A | Batangas 4th DEO | On-Going | ₱96M | 100% | High risk75 | —-0.002 |
| 20DD0084LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/REHABILITATION/IMPROVEMENT OF QUILO-QUILO-SAN CARLOS ROAD, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱47.5M | 100% | High risk71 | —-0.042 |
| 19DD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - OFF - CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ROSARIO - SN JUAN RD - K0138 + 299 - K0140 + 381 | Region IV-A | Batangas 4th DEO | Completed | ₱65.5M | 100% | High risk71 | —-0.040 |
| 20DD0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- SECONDARY ROADS, ROSARIO-SN JUAN RD - K0122+236 - K0123+800 | Region IV-A | Batangas 4th DEO | Completed | ₱61.8M | 100% | High risk70 | —-0.039 |
| 23DD0167CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BARANGAY ROAD, OF BARANGAY MALAYA IN ROSARIO, BATAN | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | High risk70 | —-0.039 |
| 22DD0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, ROSARIO-SN JUAN RD - K0137 + 000 - K0138 + 299 | Region IV-A | Batangas 4th DEO | Completed | ₱46M | 100% | High risk69 | —-0.042 |
| 23DD0246CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRIDGE ALONG BARANGAY SAN BENITO-SAN ISIDRO ROAD IN | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk64 | —-0.055 |
| 21DD0129LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk62 | —-0.080 |
| 23DD0245CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD, BRGY. NAMUNGA-BRGY. STA. CRUZ, ROSARIO, BAT | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk61 | —-0.096 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
| 2 | 25DD0096ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - PRIMARY ROADS, MANILA-BATANGAS RD - K0089 + 031 - K0089 + 941, K0090 + 024 - K0090 + 067, K0091 + 080 - K0091 + 630 | Region IV-A | Batangas 4th DEO | On-Going | ₱60.4M | 88% | High risk94 | —-0.012 |
| 3 | 24DD0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROADS AND IMPROVEMENT OF BARANGAY MARILAG TO BARA | Region IV-A | Batangas 4th DEO | On-Going | ₱96M | 100% | High risk75 | —-0.002 |
| 4 | 20DD0084LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/REHABILITATION/IMPROVEMENT OF QUILO-QUILO-SAN CARLOS ROAD, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱47.5M | 100% | High risk71 | —-0.042 |
| 5 | 19DD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - OFF - CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ROSARIO - SN JUAN RD - K0138 + 299 - K0140 + 381 | Region IV-A | Batangas 4th DEO | Completed | ₱65.5M | 100% | High risk71 | —-0.040 |
| 6 | 20DD0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- SECONDARY ROADS, ROSARIO-SN JUAN RD - K0122+236 - K0123+800 | Region IV-A | Batangas 4th DEO | Completed | ₱61.8M | 100% | High risk70 | —-0.039 |
| 7 | 23DD0167CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BARANGAY ROAD, OF BARANGAY MALAYA IN ROSARIO, BATAN | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | High risk70 | —-0.039 |
| 8 | 22DD0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, ROSARIO-SN JUAN RD - K0137 + 000 - K0138 + 299 | Region IV-A | Batangas 4th DEO | Completed | ₱46M | 100% | High risk69 | —-0.042 |
| 9 | 23DD0246CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRIDGE ALONG BARANGAY SAN BENITO-SAN ISIDRO ROAD IN | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk64 | —-0.055 |
| 10 | 21DD0129LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk62 | —-0.080 |
| 11 | 23DD0245CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD, BRGY. NAMUNGA-BRGY. STA. CRUZ, ROSARIO, BAT | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk61 | —-0.096 |
| 12 | 23DD0340ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, REHABILITATION OF BATANGAS-QUEZON ROAD, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱56.2M | 100% | Medium risk57 | —-0.044 |
| 13 | 19DD0535REPAIR/REHABILITATION OF DAMAGED PAVED ROAD (ASPHALT OVERLAY) ALONG SAN JUAN- LAIYA ROAD, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱55M | 100% | Medium risk55 | —-0.044 |
| 14 | 22DD0065ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MANILA-BATANGAS RD - K0077 + 043 - K0078 + 276 | Region IV-A | Batangas 4th DEO | Completed | ₱84.2M | 100% | Medium risk54 | —-0.100 |
| 15 | 23DD0013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, ROSARIO - SN JUAN RD - K0119 + 000 - K0119 + 500, K0119 + 800 - K0121 + 800 | Region IV-A | Batangas 4th DEO | Completed | ₱86.9M | 100% | Medium risk54 | —-0.098 |
| 16 | 24DD0141CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MALAYA-MARILAO ROAD ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱57.6M | 100% | Medium risk54 | —-0.066 |
| 17 | 21DD0157LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, SLOPE PORTECTION BY ROCK NETTING ALONG SAN JUAN- LAIYA ROAD, HUGOM SECTIONJ, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱79.2M | 100% | Medium risk54 | —-0.099 |
| 18 | 21DD0263ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE SYSTEM, QUILO-QUILO - SAN CARLOS ROAD, PADRE GAR | Region IV-A | Batangas 4th DEO | Completed | ₱59.5M | 100% | Medium risk53 | —-0.086 |
| 19 | 22DD0074ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE- PRIMARY ROADS, MANILA BATANGAS RD - K0093 + 828 - K0095 + 470 | Region IV-A | Batangas 4th DEO | Completed | ₱52.5M | 100% | Medium risk52 | —-0.103 |
| 20 | 22DD0265CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY QUILO-QUILO NORTH AND BARANGAY PAYAP | Region IV-A | Batangas 4th DEO | Completed | ₱53.8M | 100% | Medium risk52 | —-0.105 |
| 21 | 24DD0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (BUILDING 2) IN ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱30.7M | 100% | Medium risk52 | —-0.062 |
| 22 | 20DD0341LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION AND COMPLETION OF PADRE GARCIA COMMUNITY HOSPITAL, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱28.8M | 100% | Medium risk52 | —-0.103 |
| 23 | 24DD0204CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, POBLACION B, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱28.8M | 92% | Medium risk51 | —-0.056 |
| 24 | 22DD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE- PRIMARY ROADS, MANILA BATANGAS RD - K0086 + 197 - K0087 + 578 | Region IV-A | Batangas 4th DEO | Completed | ₱47.7M | 100% | Medium risk51 | —-0.104 |
| 25 | 23DD0247CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD AND DRAINAGE, BRGY. CAWONGAN, PADRE GARCIA, | Region IV-A | Batangas 4th DEO | Completed | ₱48M | 100% | Medium risk51 | —-0.105 |