Contractor dossier
194 projects on file, including joint ventures this contractor is part of.
Total projects
194
Total budget
₱2.9B
Average progress
98.6%
Completion rate
89.2%
Average risk score
43.5
Medium risk on average, out of 100
Flagged as unusual
1
0.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 194 | ₱2.9B | 43.5 | 1 | 98.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 114 | ₱1.7B | 43.5 | 0 | 99.2% |
| Buildings and Facilities | 62 | ₱507.1M | 38.8 | 0 | 97.7% |
| OTHER | 6 | ₱321.7M | 71.3 | 0 | 100.0% |
| Bridges | 5 | ₱160.9M | 50.8 | 0 | 100.0% |
| Flood Control and Drainage | 5 | ₱82.6M | 38.7 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱77.2M | 95.3 | 1 | 65.3% |
| GAA 2025 OO-1 | 1 | ₱60.4M | 94.0 | 0 | 87.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
| 25DD0096ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - PRIMARY ROADS, MANILA-BATANGAS RD - K0089 + 031 - K0089 + 941, K0090 + 024 - K0090 + 067, K0091 + 080 - K0091 + 630 | Region IV-A | Batangas 4th DEO | On-Going | ₱60.4M | 88% | High risk94 | —-0.012 |
| 24DD0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROADS AND IMPROVEMENT OF BARANGAY MARILAG TO BARA | Region IV-A | Batangas 4th DEO | On-Going | ₱96M | 100% | High risk75 | —-0.002 |
| 20DD0084LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/REHABILITATION/IMPROVEMENT OF QUILO-QUILO-SAN CARLOS ROAD, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱47.5M | 100% | High risk71 | —-0.042 |
| 19DD0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - OFF - CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - ROSARIO - SN JUAN RD - K0138 + 299 - K0140 + 381 | Region IV-A | Batangas 4th DEO | Completed | ₱65.5M | 100% | High risk71 | —-0.040 |
| 20DD0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- SECONDARY ROADS, ROSARIO-SN JUAN RD - K0122+236 - K0123+800 | Region IV-A | Batangas 4th DEO | Completed | ₱61.8M | 100% | High risk70 | —-0.039 |
| 23DD0167CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BARANGAY ROAD, OF BARANGAY MALAYA IN ROSARIO, BATAN | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | High risk70 | —-0.039 |
| 22DD0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, ROSARIO-SN JUAN RD - K0137 + 000 - K0138 + 299 | Region IV-A | Batangas 4th DEO | Completed | ₱46M | 100% | High risk69 | —-0.042 |
| 23DD0246CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRIDGE ALONG BARANGAY SAN BENITO-SAN ISIDRO ROAD IN | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk64 | —-0.055 |
| 21DD0129LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk62 | —-0.080 |
| 23DD0245CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD, BRGY. NAMUNGA-BRGY. STA. CRUZ, ROSARIO, BAT | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk61 | —-0.096 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DD0081CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF BRIDGE ALONG MALAYA - MARILA | Region IV-A | Batangas 4th DEO | On-Going | ₱77.2M | 65% | High risk95 | Flagged0.012 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 18DD0515LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REHABILITATION/IMPROVEMENT OF ROAD AT A.) BARANGAY PAGOLINGIN EAST B.) BARANGAY SAN ISIDRO C.) BARANGAY SAN SEBASTIAN D.) BARANGAY TALISAY, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱19.7M | 100% | Medium risk47 | —-0.108 |
| 77 | 21DD0328LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/ REHABILITATION OF LOCAL ROAD, BRGY. SAN BENITO, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱19.2M | 100% | Medium risk47 | —-0.108 |
| 78 | 18DD0427LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REHABILITATION/IMPROVEMENT OF MABUNGA-BAYAWANG PROVINCIAL ROAD, BARANGAY MABUNGA AND BAYAWANG, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.109 |
| 79 | 21DD0225LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF ROAD, BRGY. MASAYA, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 80 | 21DD0166LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF ROAD, BRGY. ITLUGAN, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 81 | 22DD0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD AT BARANGAY MARILAG, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 82 | 22DD0223CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD AT BARANGAY MASAYA, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 83 | 22DD0240CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD AT BARANGAY COLONGAN, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 84 | 22DD0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD AT BARANGAY TIMBUGAN, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 85 | 22DD0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD AT BARANGAY NAMUNGA, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.106 |
| 86 | 24DD0077ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - PRIMARY ROADS, MANILA-BATANGAS RD - K0088 + 700 - K0089 + 031 | Region IV-A | Batangas 4th DEO | On-Going | ₱15M | 100% | Medium risk47 | —-0.069 |
| 87 | 19DD0439LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REHABILITATION OF ROAD IN BRGYS. MUNTING TUBIG AND DAYAPAN, IBAAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.102 |
| 88 | 19DD0297LOCAL PROGRAM, LOCAL ROADS AND BRIDGES- LOCAL ROADS - CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONCRETING OF ROAD, BRGY. ITLUGAN (SITIO SAN LORENZO), ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 89 | 24DD0164CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY ITLUGAN, ROSARIO, BATANGAS (PHASE 2) | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.103 |
| 90 | 24DD0076ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, BATANGAS-QUEZON RD - K0118 + 620 - K0119 + 195 | Region IV-A | Batangas 4th DEO | On-Going | ₱16M | 100% | Medium risk47 | —-0.069 |
| 91 | 25DD0051CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF BOX CULVERT AT NASI-MABUNGA ROAD, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱7.6M | 100% | Medium risk47 | —-0.057 |
| 92 | 22DD0189CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD AT BARANGAY MACALAMCAM B, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.104 |
| 93 | 20DD0270LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, SITIO BALBANERAHAN, BRGY. CAHIGAM, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.102 |
| 94 | 19DD0336LOCAL PROGRAM, LOCAL ROADS AND BRIDGES- LOCAL ROADS- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONCRETING OF ROAD, BRGY. MARILAG (SITIO BURANDAL), ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.102 |
| 95 | 24DD0121CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BULIHAN, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.102 |
| 96 | 21DD0168LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF ROAD, BRGY. MAVALOR, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |
| 97 | 22DD0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD AT BARANGAY BAGONG POOK (SITIO NIYUGAN), ROSARI | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.104 |
| 98 | 21DD0146LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REHABILITATION/ IMPROVEMENT OF LOCAL ROADS, SITIO SIPANGAN, BRGY. MAYURO, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱14.4M | 100% | Medium risk46 | —-0.106 |
| 99 | 21DD0178LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF ROAD, BRGY. CALANTAS, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.102 |
| 100 | 23DD0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION (CONCRETING) OF ROAD, BRGY. CALANTAS, ROSARIO, BATANGA | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.102 |