Contractor dossier
280 projects on file, including joint ventures this contractor is part of.
Total projects
280
Total budget
₱10.5B
Average progress
93.5%
Completion rate
83.9%
Average risk score
50.4
Medium risk on average, out of 100
Flagged as unusual
10
3.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 234 | ₱6.8B | 48.6 | 7 | 94.0% |
| Region III | 44 | ₱3.2B | 58.9 | 3 | 90.5% |
| Central Office | 2 | ₱449.6M | 70.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 131 | ₱5B | 48.4 | 0 | 94.0% |
| Flood Control and Drainage | 100 | ₱4.3B | 50.6 | 2 | 96.9% |
| Buildings and Facilities | 20 | ₱396M | 47.0 | 1 | 88.1% |
| OTHER | 17 | ₱314.6M | 49.7 | 0 | 100.0% |
| GAA 2025 SSP | 6 | ₱128.3M | 89.2 | 5 | 51.1% |
| Bridges | 5 | ₱331.4M | 56.4 | 1 | 73.6% |
| GAA 2025 OO-1 | 1 | ₱66.9M | 93.8 | 1 | 36.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OA0070CONSTRUCTION OF C-4 FLOOD GATE (PHASE 1), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 47% | High risk95 | Flagged0.016 |
| 25OD0135REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS DEPARO-CAMARIN RD - K0023 + 783 - K0024 + 952 | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱66.9M | 37% | High risk94 | Flagged0.001 |
| 25OD0110CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARUGO ROAD, BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.2M | 36% | High risk92 | Flagged0.020 |
| 25OD0084CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.8M | 19% | High risk91 | Flagged0.024 |
| 25OD0200CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY 187, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.3M | 37% | High risk90 | Flagged0.018 |
| 25OD0163CONSTRUCTION OF ROADS INCLUDING DRAINAGE ALONG KAMIAS ST., BRGY. 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱7.7M | 100% | High risk84 | —-0.033 |
| 25OD0204REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), (PHASE 2), BARANGAY 184, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱5.8M | 66% | High risk83 | Flagged0.010 |
| 24C00518BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, BRGY. TIGPALAS, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱99M | 98% | High risk80 | —-0.019 |
| 24CC0041CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SULIVAN (PHASE II), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 24CC0559CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT BARANGAY STO. ROSARIO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱108.6M | 0% | High risk80 | Flagged0.009 |
| 24CC0545CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT BARANGAY ATLAG, CITY OF MALOLOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.051 |
| 24CC0042CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SULIVAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0069CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG GUIGUINTO RIVER AT BARANGAY MATUNGAO (SITIO LOOBAN), BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 83% | High risk76 | —-0.027 |
| 24CC0425CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY SAN FRANCISCO, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77M | 100% | High risk76 | —-0.061 |
| 24CD0247REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS EASTERN BULACAN ROAD K0066+780 K0069+000 | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk75 | —-0.058 |
| 24CC0189CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY MEYTO (PUROK 4 TO PUROK 5), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk75 | —-0.060 |
| 25CC0171CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG TABANG RIVER AND ITS TRIBUTARIES AT BARANGAY MAYSANTOL, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 83% | High risk75 | —-0.027 |
| 25CK0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE II), LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱72.4M | 86% | High risk75 | —-0.028 |
| 25CD0220CONSTRUCTION OF BAYBAY BRIDGE (PHASE II), BARANGAY BAYBAY, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱121.7M | 49% | High risk74 | Flagged0.010 |
| 24C00565ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS, MANILA NORTH ROAD, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱73.4M | 100% | High risk74 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OD0084CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.8M | 19% | High risk91 | Flagged0.024 |
| 25OD0110CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARUGO ROAD, BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.2M | 36% | High risk92 | Flagged0.020 |
| 25OD0200CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY 187, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.3M | 37% | High risk90 | Flagged0.018 |
| 25OA0070CONSTRUCTION OF C-4 FLOOD GATE (PHASE 1), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 47% | High risk95 | Flagged0.016 |
| 24CK0194CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PARUA RIVER, BARANGAY SAN VICENTE SECTION, PHASE 1, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱48.2M | 74% | Medium risk44 | Flagged0.014 |
| 25CD0220CONSTRUCTION OF BAYBAY BRIDGE (PHASE II), BARANGAY BAYBAY, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱121.7M | 49% | High risk74 | Flagged0.010 |
| 25OD0204REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), (PHASE 2), BARANGAY 184, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱5.8M | 66% | High risk83 | Flagged0.010 |
| 24CC0559CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT BARANGAY STO. ROSARIO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱108.6M | 0% | High risk80 | Flagged0.009 |
| 23OF0197CONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC CIVIC CENTER), BRGY. NEW ERA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.8M | 75% | Medium risk52 | Flagged0.005 |
| 25OD0135REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS DEPARO-CAMARIN RD - K0023 + 783 - K0024 + 952 | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱66.9M | 37% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 19C00057JICA-ASSISTED ROAD UPGRADING AND PRESERVATION PROJECT (RUPP) REHABILITATION/IMPROVEMENT ALONG DAANG MAHARLIKA, BULACAN, PROVINCE OF BULACAN | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱295.3M | 100% | High risk70 | —-0.044 |
| 27 | 21C00089REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MANILA NORTH ROAD, UNDER THE ANNUAL WORK PROGRAM 3, ASSET PRESERVATION CONTRACT (APC) COMPONENT, ROAD UPGRADING AND PRESERVATION PROJECT, PROVINCE OF BULACAN | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱154.3M | 100% | High risk70 | —-0.066 |
| 28 | 24CC0503NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - PULILAN-CALUMPIT RD - K0049+(-316) - K0050+018, K0050+033- K0052+287, PULILAN AND CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.6M | 69% | High risk69 | —-0.023 |
| 29 | 17OF0025CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE & DRAINAGE OF MALABON TULLAHAN RIVER, BRGY. GULOD, Q.C. | National Capital Region | Quezon City 1st DEO | Terminated | ₱84.9M | 100% | High risk65 | —-0.004 |
| 30 | 19OF0151CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MARIKINA RIVER (STA. 19+550 TO 19+700), BRGY. BATASAN HILLS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95.1M | 100% | High risk65 | —-0.070 |
| 31 | 23OF0092PREVENTIVE MAINTENANCE - SECONDARY ROADS - COMMONWEALTH AVE - K0020 + 520 - K0017 + 061, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱181.3M | 100% | High risk65 | —-0.067 |
| 32 | 24OF0143PREVENTIVE MAINTENANCE - COMMONWEALTH AVE (LUZON AVE TO CENTRAL AVE), QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.076 |
| 33 | 24OF0122REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - PAYATAS RD - K0022+(-1067) - K0022+000, K0025+230 - K0026+500, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱144.7M | 100% | High risk64 | —-0.075 |
| 34 | 18OF0087OPENING OF KATIPUNAN AVE., EXT., Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱93.1M | 100% | High risk63 | —-0.029 |
| 35 | 17CD0103CONSTRUCTION/ REHABILITATION/ IMPROVEMENT OF ROAD LEADING TO RELOCATION SITE, BARANGAY CITRUS, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱27.9M | 100% | High risk63 | —-0.040 |
| 36 | 21OF0090CONSTRUCTION OF KATIPUNAN AVE., EXTENSION (MWSS PROPERTY TO GSIS PROPERTY), QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱131.5M | 100% | High risk63 | —-0.078 |
| 37 | 17CD0108REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE NORZAGARAY - BIGTE ROAD, K0071+268 - K0071+506; K0076+000 - K0076+500; K0077+262 - K0077+883; K0078+271 - K0078+889 | Region III | Bulacan 2nd DEO | Completed | ₱11M | 100% | High risk62 | —-0.039 |
| 38 | 17OF0026REHAB./RECONSTRUCTION/UPGRADING OF DAMAGED PAVEMENT OF CONGRESSIONAL AVE., EXT., (K0016 + (-199) - K0016+206; K0016+(-794) - K0016+(-199); K0016+206 - K0016+496; K0016+068 - K0016+813), Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱60.3M | 100% | High risk62 | —-0.066 |
| 39 | 25OG0146REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS: COMMONWEALTH AVE - K0013 + 400 - K0013 + 820, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.4M | 35% | High risk61 | —-0.044 |
| 40 | 25OG0147REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS: COMMONWEALTH AVE - K0013 + 820 - K0014 + 240, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.4M | 37% | High risk61 | —-0.045 |
| 41 | 25OF0156REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - COMMONWEALTH AVENUE (S05646LZ) - K0018+250 - K0018+730, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱96M | 99% | High risk61 | —-0.060 |
| 42 | 22OF0226REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BATASAN ROAD - K0018+000 - K0019+765, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.085 |
| 43 | 22OF0227REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - DEL MONTE AVE., K0008+680 - K0010+604.40, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.087 |
| 44 | 22OF0191REHABILITATION / RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AGHAM ROAD - K0011+(-610) - K0011+250, K0011+(-252) - K0011+602, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.087 |
| 45 | 24OF0140PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - LUZON AVENUE (S05625LZ) - CHAINAGE 0 - CHAINAGE 1047, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.087 |
| 46 | 24CD0117CONSTRUCTION OF BAYBAY BRIDGE, BARANGAY BAYBAY, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱29M | 100% | High risk60 | —-0.038 |
| 47 | 24CD0109REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, BARANGAY TAWIRAN TO WAWANG PULO, STA. 02+636 STA. 02+756, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.080 |
| 48 | 23OF0089CONSTRUCTION OF MULTI-PURPOSE BUILDING (DISASTER RELIEF CENTER) AT BARANGAY PASONG TAMO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱66.9M | 100% | Medium risk59 | —-0.047 |
| 49 | 22CJ0189FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG CAMILING RIVER (PACKAGE H - RIGHT BANK), TAMBUGAN - SAWAT SECTION, CAMILIN | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk59 | —-0.073 |
| 50 | 23OF0143STRUCTURAL RETROFITTING OF THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES (DENR) - CENTRAL OFFICE MAIN BUILDING, VISAYAS AVE., DILIMAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱66.1M | 41% | Medium risk58 | —-0.027 |