Contractor dossier
280 projects on file, including joint ventures this contractor is part of.
Total projects
280
Total budget
₱10.5B
Average progress
93.5%
Completion rate
83.9%
Average risk score
50.4
Medium risk on average, out of 100
Flagged as unusual
10
3.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 234 | ₱6.8B | 48.6 | 7 | 94.0% |
| Region III | 44 | ₱3.2B | 58.9 | 3 | 90.5% |
| Central Office | 2 | ₱449.6M | 70.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 131 | ₱5B | 48.4 | 0 | 94.0% |
| Flood Control and Drainage | 100 | ₱4.3B | 50.6 | 2 | 96.9% |
| Buildings and Facilities | 20 | ₱396M | 47.0 | 1 | 88.1% |
| OTHER | 17 | ₱314.6M | 49.7 | 0 | 100.0% |
| GAA 2025 SSP | 6 | ₱128.3M | 89.2 | 5 | 51.1% |
| Bridges | 5 | ₱331.4M | 56.4 | 1 | 73.6% |
| GAA 2025 OO-1 | 1 | ₱66.9M | 93.8 | 1 | 36.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OA0070CONSTRUCTION OF C-4 FLOOD GATE (PHASE 1), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 47% | High risk95 | Flagged0.016 |
| 25OD0135REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS DEPARO-CAMARIN RD - K0023 + 783 - K0024 + 952 | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱66.9M | 37% | High risk94 | Flagged0.001 |
| 25OD0110CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARUGO ROAD, BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.2M | 36% | High risk92 | Flagged0.020 |
| 25OD0084CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.8M | 19% | High risk91 | Flagged0.024 |
| 25OD0200CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY 187, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.3M | 37% | High risk90 | Flagged0.018 |
| 25OD0163CONSTRUCTION OF ROADS INCLUDING DRAINAGE ALONG KAMIAS ST., BRGY. 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱7.7M | 100% | High risk84 | —-0.033 |
| 25OD0204REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), (PHASE 2), BARANGAY 184, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱5.8M | 66% | High risk83 | Flagged0.010 |
| 24C00518BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, BRGY. TIGPALAS, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱99M | 98% | High risk80 | —-0.019 |
| 24CC0041CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SULIVAN (PHASE II), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 24CC0559CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT BARANGAY STO. ROSARIO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱108.6M | 0% | High risk80 | Flagged0.009 |
| 24CC0545CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT BARANGAY ATLAG, CITY OF MALOLOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.051 |
| 24CC0042CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SULIVAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0069CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG GUIGUINTO RIVER AT BARANGAY MATUNGAO (SITIO LOOBAN), BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 83% | High risk76 | —-0.027 |
| 24CC0425CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY SAN FRANCISCO, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77M | 100% | High risk76 | —-0.061 |
| 24CD0247REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS EASTERN BULACAN ROAD K0066+780 K0069+000 | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk75 | —-0.058 |
| 24CC0189CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY MEYTO (PUROK 4 TO PUROK 5), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk75 | —-0.060 |
| 25CC0171CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG TABANG RIVER AND ITS TRIBUTARIES AT BARANGAY MAYSANTOL, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 83% | High risk75 | —-0.027 |
| 25CK0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE II), LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱72.4M | 86% | High risk75 | —-0.028 |
| 25CD0220CONSTRUCTION OF BAYBAY BRIDGE (PHASE II), BARANGAY BAYBAY, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱121.7M | 49% | High risk74 | Flagged0.010 |
| 24C00565ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS, MANILA NORTH ROAD, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱73.4M | 100% | High risk74 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OD0084CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.8M | 19% | High risk91 | Flagged0.024 |
| 25OD0110CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARUGO ROAD, BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.2M | 36% | High risk92 | Flagged0.020 |
| 25OD0200CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY 187, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.3M | 37% | High risk90 | Flagged0.018 |
| 25OA0070CONSTRUCTION OF C-4 FLOOD GATE (PHASE 1), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 47% | High risk95 | Flagged0.016 |
| 24CK0194CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PARUA RIVER, BARANGAY SAN VICENTE SECTION, PHASE 1, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱48.2M | 74% | Medium risk44 | Flagged0.014 |
| 25CD0220CONSTRUCTION OF BAYBAY BRIDGE (PHASE II), BARANGAY BAYBAY, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱121.7M | 49% | High risk74 | Flagged0.010 |
| 25OD0204REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), (PHASE 2), BARANGAY 184, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱5.8M | 66% | High risk83 | Flagged0.010 |
| 24CC0559CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT BARANGAY STO. ROSARIO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱108.6M | 0% | High risk80 | Flagged0.009 |
| 23OF0197CONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC CIVIC CENTER), BRGY. NEW ERA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.8M | 75% | Medium risk52 | Flagged0.005 |
| 25OD0135REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS DEPARO-CAMARIN RD - K0023 + 783 - K0024 + 952 | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱66.9M | 37% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22CD0156CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER STA. 01+000 STA. 01+880 (RIGHT SIDE), SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱99M | 100% | Medium risk57 | —-0.075 |
| 52 | 21OE0031RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - R-10 BR. 2 (B01745LZ) ALONG R-10 | National Capital Region | North Manila DEO | Completed | ₱74.3M | 100% | Medium risk55 | —-0.059 |
| 53 | 23CC0147CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG ANGAT RIVER, SAN JOSE TRIBUTARY SECTION, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.080 |
| 54 | 18OF0099CONSTRUCTION OF PERMANENT BRIDGES STRUCTURES OF KATIPUNAN AVE., EXT. (VISTA REAL CLASSICAL), BRGY. BATASAN HILLS, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱58.9M | 100% | Medium risk55 | —-0.056 |
| 55 | 25OD0108REHABILITATION OF ROAD AND DRAINAGE ALONG GALAS-IBABA, BARANGAY BIGNAY, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱66.5M | 16% | Medium risk55 | —-0.038 |
| 56 | 20OF0004CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG QUIRINO HI-WAY K0010+(-127) - K0014+294, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱75M | 100% | Medium risk55 | —-0.089 |
| 57 | 20OF0002PREVENTIVE MAINTENANCE OF MINDANAO AVE., K0018+(-092) - K0016+400, (SO5475LZ) CHAINAGE 000 - CHAINAGE496, (SO5476LZ) CHAINAGE 000 - CHAINAGE 496, K0015+800 - K0017+604, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱70.3M | 100% | Medium risk55 | —-0.092 |
| 58 | 24OF0163REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - CONGRESSIONAL AVENUE EXTENSION, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱68.8M | 100% | Medium risk55 | —-0.093 |
| 59 | 18OD0106REHABILITATION/ RECONSTRUCTION OF DAMAGED PAVED ROADS CENTRAL LUZON LEPROSARIUM RD., K0031+698-K0031+289, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱21.1M | 100% | Medium risk54 | —-0.042 |
| 60 | 18OD0108REHABILITATION / RECONSTRUCTION OF DAMAGED PAVED ROADS CENTRAL LUZON LEPROSARIUM RD. - K0029+543-K0029+159, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱17.6M | 100% | Medium risk54 | —-0.042 |
| 61 | 24OD0022CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS IN BARANGAY 179 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱84.7M | 100% | Medium risk53 | —-0.080 |
| 62 | 16OD0109REHABILITATION OF ROADS AND DRAINAGE ALONG M.H. DEL PILAR ST., (11TH AVENUE TO C-3), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱31.9M | 100% | Medium risk53 | —-0.043 |
| 63 | 22C00125REHABILITATION OF DISASTER-REALTED INFRASTRUCTURE AND OTHER FACILITIES-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS, MANILA NORTH ROAD, PROVINCES OF PAMPANGA AND BULACAN | Region III | Region III | Completed | ₱193M | 100% | Medium risk53 | —-0.071 |
| 64 | 22OG0092REHABILITATION OF 3-STOREY VANGUARD BUILDING, UNIVERSITY OF THE PHILIPPINES, DILIMAN, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱39.2M | 100% | Medium risk53 | —-0.089 |
| 65 | 21OA0056CONST. OF FLOODWALL AND UPGRADING OF ROAD W/ DRAIN. SYSTEM ALONG ADELFA ST., BRGY. TANZA 1 NAV. CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱67.5M | 100% | Medium risk52 | —-0.082 |
| 66 | 23OD0086CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG THE BANKS OF CREEKS, BARANGAY 173, CALOOCAN CITY (PHASE 3) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱85.1M | 100% | Medium risk52 | —-0.079 |
| 67 | 23OD0071CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF MATARIK CREEK, BRGY. 175 (PHASE 3), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱89.2M | 100% | Medium risk52 | —-0.078 |
| 68 | 23OD0072CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF MATARIK CREEK, BRGY. 176, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱89.2M | 100% | Medium risk52 | —-0.078 |
| 69 | 23OF0197CONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC CIVIC CENTER), BRGY. NEW ERA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.8M | 75% | Medium risk52 | Flagged0.005 |
| 70 | 24OD0152CONSTRUCTION OF ROAD AND DRAINAGE, TEOFILO SAMSON AVENUE TO NORTHSTAR INDUSTRIAL MANUFACTURING/ OTHER MANUFACTURING SITES, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱47.9M | 100% | Medium risk51 | —-0.097 |
| 71 | 23OD0199IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM ALONG REPARO ROAD (PHASE 2) FROM MACARTHUR HIGHWAY TO NORTH DIVERSION ROAD, CALOOCAN | National Capital Region | Metro Manila 3rd DEO | Completed | ₱47.8M | 100% | Medium risk51 | —-0.098 |
| 72 | 21OD0240REHABILITATION (CONCRETE REBLOCKING) ALONG EDSA SOUTH BOUND, K0010+(-920) TO K0010+666, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱47.9M | 100% | Medium risk51 | —-0.099 |
| 73 | 18OA0104CONST. OF ACCESS ROAD FR. LETRE TO GOV. W. PASCUAL AVE., MAL. CITY (PHASE 1) STA. 0+000 - STA. 0+790 | National Capital Region | Malabon-Navotas DEO | Completed | ₱47.7M | 100% | Medium risk51 | —-0.095 |
| 74 | 25OD0068REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS DEPARO-BAGUMBONG RD - K0021 + 849 - K0022 + 395, K0022 + 597 - K0022 + 1000 | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.5M | 75% | Medium risk51 | —-0.060 |
| 75 | 25OD0147CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM CONNECTING CONGRESSIONAL NATIONAL ROAD TO UNION VILLAGE CREEK, BARANGAY 171, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.2M | 56% | Medium risk51 | —-0.056 |