Contractor dossier
280 projects on file, including joint ventures this contractor is part of.
Total projects
280
Total budget
₱10.5B
Average progress
93.5%
Completion rate
83.9%
Average risk score
50.4
Medium risk on average, out of 100
Flagged as unusual
10
3.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 234 | ₱6.8B | 48.6 | 7 | 94.0% |
| Region III | 44 | ₱3.2B | 58.9 | 3 | 90.5% |
| Central Office | 2 | ₱449.6M | 70.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 131 | ₱5B | 48.4 | 0 | 94.0% |
| Flood Control and Drainage | 100 | ₱4.3B | 50.6 | 2 | 96.9% |
| Buildings and Facilities | 20 | ₱396M | 47.0 | 1 | 88.1% |
| OTHER | 17 | ₱314.6M | 49.7 | 0 | 100.0% |
| GAA 2025 SSP | 6 | ₱128.3M | 89.2 | 5 | 51.1% |
| Bridges | 5 | ₱331.4M | 56.4 | 1 | 73.6% |
| GAA 2025 OO-1 | 1 | ₱66.9M | 93.8 | 1 | 36.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OA0070CONSTRUCTION OF C-4 FLOOD GATE (PHASE 1), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 47% | High risk95 | Flagged0.016 |
| 25OD0135REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS DEPARO-CAMARIN RD - K0023 + 783 - K0024 + 952 | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱66.9M | 37% | High risk94 | Flagged0.001 |
| 25OD0110CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARUGO ROAD, BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.2M | 36% | High risk92 | Flagged0.020 |
| 25OD0084CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.8M | 19% | High risk91 | Flagged0.024 |
| 25OD0200CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY 187, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.3M | 37% | High risk90 | Flagged0.018 |
| 25OD0163CONSTRUCTION OF ROADS INCLUDING DRAINAGE ALONG KAMIAS ST., BRGY. 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱7.7M | 100% | High risk84 | —-0.033 |
| 25OD0204REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), (PHASE 2), BARANGAY 184, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱5.8M | 66% | High risk83 | Flagged0.010 |
| 24C00518BASIC INFRASTRUCTURE PROGRAM-BIP-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, BRGY. TIGPALAS, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱99M | 98% | High risk80 | —-0.019 |
| 24CC0041CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SULIVAN (PHASE II), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 24CC0559CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT BARANGAY STO. ROSARIO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱108.6M | 0% | High risk80 | Flagged0.009 |
| 24CC0545CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT BARANGAY ATLAG, CITY OF MALOLOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.051 |
| 24CC0042CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SULIVAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CC0069CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG GUIGUINTO RIVER AT BARANGAY MATUNGAO (SITIO LOOBAN), BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 83% | High risk76 | —-0.027 |
| 24CC0425CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY SAN FRANCISCO, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77M | 100% | High risk76 | —-0.061 |
| 24CD0247REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS EASTERN BULACAN ROAD K0066+780 K0069+000 | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | High risk75 | —-0.058 |
| 24CC0189CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY MEYTO (PUROK 4 TO PUROK 5), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk75 | —-0.060 |
| 25CC0171CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG TABANG RIVER AND ITS TRIBUTARIES AT BARANGAY MAYSANTOL, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 83% | High risk75 | —-0.027 |
| 25CK0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE II), LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱72.4M | 86% | High risk75 | —-0.028 |
| 25CD0220CONSTRUCTION OF BAYBAY BRIDGE (PHASE II), BARANGAY BAYBAY, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱121.7M | 49% | High risk74 | Flagged0.010 |
| 24C00565ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS, MANILA NORTH ROAD, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱73.4M | 100% | High risk74 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OD0084CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.8M | 19% | High risk91 | Flagged0.024 |
| 25OD0110CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARUGO ROAD, BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.2M | 36% | High risk92 | Flagged0.020 |
| 25OD0200CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY 187, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.3M | 37% | High risk90 | Flagged0.018 |
| 25OA0070CONSTRUCTION OF C-4 FLOOD GATE (PHASE 1), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 47% | High risk95 | Flagged0.016 |
| 24CK0194CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PARUA RIVER, BARANGAY SAN VICENTE SECTION, PHASE 1, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱48.2M | 74% | Medium risk44 | Flagged0.014 |
| 25CD0220CONSTRUCTION OF BAYBAY BRIDGE (PHASE II), BARANGAY BAYBAY, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱121.7M | 49% | High risk74 | Flagged0.010 |
| 25OD0204REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), (PHASE 2), BARANGAY 184, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱5.8M | 66% | High risk83 | Flagged0.010 |
| 24CC0559CONSTRUCTION OF PUMPING STATION AND FLOOD GATE AT BARANGAY STO. ROSARIO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱108.6M | 0% | High risk80 | Flagged0.009 |
| 23OF0197CONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC CIVIC CENTER), BRGY. NEW ERA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱47.8M | 75% | Medium risk52 | Flagged0.005 |
| 25OD0135REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS DEPARO-CAMARIN RD - K0023 + 783 - K0024 + 952 | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱66.9M | 37% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 19OA0007CONST. OF RIVERWALL ALONG MALABON-TULLAHAN RIVER (PHASE I) BRGY. NBBS DAGAT-DAGATAN, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱32.3M | 100% | Medium risk46 | —-0.088 |
| 177 | 18OA0079CONST. OF BOX CULVERT ALONG M. NAVAL ST., FROM PALTOK CREEK TO VADEO 5, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.096 |
| 178 | 25OF0099PREVENTIVE MAINTENANCE - SECONDARY ROADS - ROAD 1 (S05480LZ) - CHAINAGE 660 - 880, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱14.2M | 92% | Medium risk46 | —-0.068 |
| 179 | 21OG0060PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING - C.P. GARCIA (S05442LZ) K0014 + 000 - K0015 + 718, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.099 |
| 180 | 22OD0214REHABILITATION OF CASILI CREEK FROM SAMSON ROAD TO ESTERO DE MAYPAJO, BARANGAYS 34, 36 UP TO BARANGAY 75, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱28.8M | 100% | Medium risk46 | —-0.088 |
| 181 | 19OC0147CONSTRUCTION OF BOX CULVERT ALONG VILLANUEVA CREEK NEAR PARAÑAQUE NATIONAL HIGH SCHOOL, BARANGAY SAN DIONISIOPARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.074 |
| 182 | 24OG0062REHABILITATION OF ROADS, BRGY. QUIRINO 3-A, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.098 |
| 183 | 20OD0043CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANK OF CREEK IN LIBIS BAESA, BARANGAY 163, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱46.4M | 100% | Medium risk46 | —-0.084 |
| 184 | 18OD0177CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANK OF CREEKS ALONG BRGY. 178 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱28.2M | 100% | Medium risk46 | —-0.086 |
| 185 | 20OD0042CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANK OF CREEK IN LIBIS BAESA, BARANGAY 162, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱46.4M | 100% | Medium risk46 | —-0.086 |
| 186 | 19OD0250REHABILITATION OF CREEK RIPRAP, RETAINING WALL AND DRAINAGE SYSTEM AT F.C. BARTOLOME, BF HOMES T. SAMSON AND SILANGAN SUBD. ALONG BRGY. 164, 169 & 170, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱37.2M | 100% | Medium risk46 | —-0.085 |
| 187 | 22OD0060CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS ALONG KABATUHAN RD., BRGY. 168 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱28.5M | 100% | Medium risk46 | —-0.087 |
| 188 | 21OD0063CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANK OF CREEKS, BARANGAY 168, VILLA MARIA, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱28.4M | 100% | Medium risk46 | —-0.087 |
| 189 | 19OB0003CONSTRUCTION OF REVETMENT WALL ALONG SALAPAN CREEK, BRGY. SALAPAN, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.088 |
| 190 | 24OD0187CONSTRUCTION OF ROADS AND DRAINAGE ALONG BO. CONCEPCION, BRGY. 188, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.2M | 100% | Medium risk46 | —-0.097 |
| 191 | 18OD0241CONSTRUCTION OF 4 STOREY 8 CLASSROOM SCHOOL BUILDING CALOOCAN NORTH ES, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱21.6M | 100% | Medium risk46 | —-0.049 |
| 192 | 22OD0022CONSTRUCTION OF ROAD INCLUDING DRAINAGE SYSTEM ALONG ILANG-ILANG RD., BRGY. 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱15.3M | 100% | Medium risk46 | —-0.097 |
| 193 | 22OD0036CONSTRUCTION OF ROAD INCLUDING DRAINAGE ALONG PILI ROAD, CONNECTING DEPARO CAMARIN, BRGY. 178, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.1M | 100% | Medium risk46 | —-0.097 |
| 194 | 24OA0014ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, TERTIARY ROADS - SEVILLA BLVD (S02205LZ) CHAINAGE 000 - CHAINAGE 173 - CHAINAGE 320 - MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱16.7M | 100% | Medium risk46 | —-0.097 |
| 195 | 23OD0031CONSTRUCTION OF ROAD INCLUDING DRAINAGE ALONG SUNFLOWER ST., BRGY. 187, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.2M | 100% | Medium risk46 | —-0.097 |
| 196 | 18OD0171CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), BRGY. 176, PHASE 8-A, PKG. 12, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.7M | 100% | Medium risk46 | —-0.101 |
| 197 | 24OD0076REHABILITATION OF ROAD INCLUDING DRAINAGE SYSTEM ALONG KIPAPA ROAD CONNECTING DEPARO CAMARIN, PHASE 2, BARANGAY 178, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱15.4M | 100% | Medium risk46 | —-0.098 |
| 198 | 19OD0029IMPROVEMENT OF DRAINAGE SYSTEM ALONG BRGY. 169, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱23.4M | 100% | Medium risk46 | —-0.081 |
| 199 | 19OD0165CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANK OF VARIOUS CREEKS ALONG SAN ROQUE, BRGY. 187, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱27.5M | 100% | Medium risk46 | —-0.085 |
| 200 | 23OF0165CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN FRANCISCO RIVER IN BRGY. SAN ANTONIO, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.089 |