Contractor dossier
108 projects on file, including joint ventures this contractor is part of.
Total projects
108
Total budget
₱4.3B
Average progress
96.4%
Completion rate
77.8%
Average risk score
55.9
Medium risk on average, out of 100
Flagged as unusual
12
11.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 108 | ₱4.3B | 55.9 | 12 | 96.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 64 | ₱1.9B | 51.3 | 0 | 99.5% |
| Flood Control and Drainage | 16 | ₱1.1B | 57.6 | 0 | 96.0% |
| Buildings and Facilities | 14 | ₱92M | 46.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 7 | ₱802.3M | 92.1 | 7 | 74.5% |
| OTHER | 3 | ₱108.1M | 79.0 | 3 | 91.1% |
| Bridges | 2 | ₱100M | 51.2 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱66.1M | 94.9 | 1 | 18.9% |
| GAA 2025 OO-1 | 1 | ₱66.6M | 94.2 | 1 | 93.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0066CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION/IMPROVEMENT OF CALABIGAN-CAGANDUNGAN ROAD, BRGY CAGANDUNGAN & BRGY CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱66.1M | 19% | High risk95 | Flagged0.037 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 24PC0047OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0626 + 178 - K0626 + 288 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱25.6M | 100% | High risk79 | Flagged0.004 |
| 25PC0043CSSP-CONS/IMPR OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA PROG-TRIP)-SAN ISIDRO SUR-POBLACION-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM ROAD LEADING TO MANACOTA UNDERGROUND RIVER & OTHER TOURISM AREAS,BRGY. CADACLAN,CALANASAN | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱36.9M | 74% | High risk79 | Flagged0.010 |
| 24PC0040CSSP- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF WEST APAYAO ABULUG IRRIGATION SYSTEM (WAAIS) TUMOG - SAN ISIDRO ROAD, LUNA, APAYAO (KATUBIGAN-KALSADA TUNGO SA PATUBIGAN) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱45.5M | 100% | High risk79 | Flagged0.009 |
| 24PC0006OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱134.4M | 100% | High risk67 | —-0.008 |
| 24PC0005OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱142.9M | 100% | High risk67 | —-0.037 |
| 24PC0013OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 98% | High risk66 | —-0.002 |
| 24PC0067OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 100% | High risk66 | —-0.007 |
| 24PC0015OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱143.9M | 100% | High risk65 | —-0.037 |
| 23PC0032OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,SAN SEBASTIAN SEC,STA 28+085-STA 28+635 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 18P00022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS ABRA-KALINGA-APAYAO ROAD (BULUAN-BANBAN-PUGUIN-SACPIL-PINUKPUK), APAYAO STA 3+960 - STA 4+900, STA 4+960 - STA 7+520 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱93.5M | 100% | High risk60 | —-0.069 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0066CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION/IMPROVEMENT OF CALABIGAN-CAGANDUNGAN ROAD, BRGY CAGANDUNGAN & BRGY CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱66.1M | 19% | High risk95 | Flagged0.037 |
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PC0043CSSP-CONS/IMPR OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA PROG-TRIP)-SAN ISIDRO SUR-POBLACION-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM ROAD LEADING TO MANACOTA UNDERGROUND RIVER & OTHER TOURISM AREAS,BRGY. CADACLAN,CALANASAN | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱36.9M | 74% | High risk79 | Flagged0.010 |
| 24PC0040CSSP- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF WEST APAYAO ABULUG IRRIGATION SYSTEM (WAAIS) TUMOG - SAN ISIDRO ROAD, LUNA, APAYAO (KATUBIGAN-KALSADA TUNGO SA PATUBIGAN) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱45.5M | 100% | High risk79 | Flagged0.009 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 24PC0047OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0626 + 178 - K0626 + 288 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱25.6M | 100% | High risk79 | Flagged0.004 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25PC0066CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION/IMPROVEMENT OF CALABIGAN-CAGANDUNGAN ROAD, BRGY CAGANDUNGAN & BRGY CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱66.1M | 19% | High risk95 | Flagged0.037 |
| 2 | 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
| 3 | 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 4 | 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 5 | 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 6 | 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 7 | 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 8 | 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 9 | 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 10 | 24PC0047OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0626 + 178 - K0626 + 288 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱25.6M | 100% | High risk79 | Flagged0.004 |
| 11 | 25PC0043CSSP-CONS/IMPR OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA PROG-TRIP)-SAN ISIDRO SUR-POBLACION-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM ROAD LEADING TO MANACOTA UNDERGROUND RIVER & OTHER TOURISM AREAS,BRGY. CADACLAN,CALANASAN | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱36.9M | 74% | High risk79 | Flagged0.010 |
| 12 | 24PC0040CSSP- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF WEST APAYAO ABULUG IRRIGATION SYSTEM (WAAIS) TUMOG - SAN ISIDRO ROAD, LUNA, APAYAO (KATUBIGAN-KALSADA TUNGO SA PATUBIGAN) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱45.5M | 100% | High risk79 | Flagged0.009 |
| 13 | 24PC0006OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱134.4M | 100% | High risk67 | —-0.008 |
| 14 | 24PC0005OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱142.9M | 100% | High risk67 | —-0.037 |
| 15 | 24PC0013OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 98% | High risk66 | —-0.002 |
| 16 | 24PC0067OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 100% | High risk66 | —-0.007 |
| 17 | 24PC0015OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱143.9M | 100% | High risk65 | —-0.037 |
| 18 | 23PC0032OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,SAN SEBASTIAN SEC,STA 28+085-STA 28+635 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 19 | 18P00022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS ABRA-KALINGA-APAYAO ROAD (BULUAN-BANBAN-PUGUIN-SACPIL-PINUKPUK), APAYAO STA 3+960 - STA 4+900, STA 4+960 - STA 7+520 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱93.5M | 100% | High risk60 | —-0.069 |
| 20 | 19PC0007CONSTRUCTION OF MISSING LINKS/NEW ROADS PIDDIG-CARASI-CALANASAN ROAD 0+000-4+000, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.3M | 100% | Medium risk60 | —-0.064 |
| 21 | 18PC0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, UPPER MATON, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk58 | —-0.077 |
| 22 | 22PC0031CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BIDDING/FACILITIES-IMPROVEMENT OF BUTAO-PULOT ROAD, BARANGAY BUTAO, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱6.8M | 100% | Medium risk57 | —-0.072 |
| 23 | 18PC0027CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION SAN ISIDRO SUR-POBLACION-LAPPA-MARAG CADACLAN SALAGUNTING LUNA APAYAO 0+000-2+784 SAN ISIDRO-POBLACION-LAPPA SECTION 0+000-1+860 MARAG SECTION, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱95.7M | 100% | Medium risk56 | —-0.065 |
| 24 | 23PC0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES-IMPROVEMENT OF BUTAO-PULOT ROAD, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk56 | —-0.077 |
| 25 | 22PC0024NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO RD-K0712+000-K0712+144, K0712+228-713+383 - AT SPECIFIC LOCATIONS ALONG CLAVERIA-CALANASAN-KABUGAO RD (S00631LZ) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱67.6M | 100% | Medium risk56 | —-0.074 |