Contractor dossier
108 projects on file, including joint ventures this contractor is part of.
Total projects
108
Total budget
₱4.3B
Average progress
96.4%
Completion rate
77.8%
Average risk score
55.9
Medium risk on average, out of 100
Flagged as unusual
12
11.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 108 | ₱4.3B | 55.9 | 12 | 96.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 64 | ₱1.9B | 51.3 | 0 | 99.5% |
| Flood Control and Drainage | 16 | ₱1.1B | 57.6 | 0 | 96.0% |
| Buildings and Facilities | 14 | ₱92M | 46.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 7 | ₱802.3M | 92.1 | 7 | 74.5% |
| OTHER | 3 | ₱108.1M | 79.0 | 3 | 91.1% |
| Bridges | 2 | ₱100M | 51.2 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱66.1M | 94.9 | 1 | 18.9% |
| GAA 2025 OO-1 | 1 | ₱66.6M | 94.2 | 1 | 93.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0066CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION/IMPROVEMENT OF CALABIGAN-CAGANDUNGAN ROAD, BRGY CAGANDUNGAN & BRGY CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱66.1M | 19% | High risk95 | Flagged0.037 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 24PC0047OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0626 + 178 - K0626 + 288 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱25.6M | 100% | High risk79 | Flagged0.004 |
| 25PC0043CSSP-CONS/IMPR OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA PROG-TRIP)-SAN ISIDRO SUR-POBLACION-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM ROAD LEADING TO MANACOTA UNDERGROUND RIVER & OTHER TOURISM AREAS,BRGY. CADACLAN,CALANASAN | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱36.9M | 74% | High risk79 | Flagged0.010 |
| 24PC0040CSSP- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF WEST APAYAO ABULUG IRRIGATION SYSTEM (WAAIS) TUMOG - SAN ISIDRO ROAD, LUNA, APAYAO (KATUBIGAN-KALSADA TUNGO SA PATUBIGAN) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱45.5M | 100% | High risk79 | Flagged0.009 |
| 24PC0006OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱134.4M | 100% | High risk67 | —-0.008 |
| 24PC0005OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱142.9M | 100% | High risk67 | —-0.037 |
| 24PC0013OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 98% | High risk66 | —-0.002 |
| 24PC0067OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 100% | High risk66 | —-0.007 |
| 24PC0015OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱143.9M | 100% | High risk65 | —-0.037 |
| 23PC0032OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,SAN SEBASTIAN SEC,STA 28+085-STA 28+635 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 18P00022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/ NEW ROADS ABRA-KALINGA-APAYAO ROAD (BULUAN-BANBAN-PUGUIN-SACPIL-PINUKPUK), APAYAO STA 3+960 - STA 4+900, STA 4+960 - STA 7+520 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱93.5M | 100% | High risk60 | —-0.069 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PC0066CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION/IMPROVEMENT OF CALABIGAN-CAGANDUNGAN ROAD, BRGY CAGANDUNGAN & BRGY CALABIGAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱66.1M | 19% | High risk95 | Flagged0.037 |
| 25PC0010OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 70% | High risk91 | Flagged0.019 |
| 25PC0015OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 74% | High risk92 | Flagged0.017 |
| 25PC0012OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱141.8M | 81% | High risk92 | Flagged0.015 |
| 25PB0006ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 62% | High risk93 | Flagged0.011 |
| 25PB0007ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTUR | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱94.1M | 67% | High risk93 | Flagged0.010 |
| 25PC0043CSSP-CONS/IMPR OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM RD INFRA PROG-TRIP)-SAN ISIDRO SUR-POBLACION-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM ROAD LEADING TO MANACOTA UNDERGROUND RIVER & OTHER TOURISM AREAS,BRGY. CADACLAN,CALANASAN | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱36.9M | 74% | High risk79 | Flagged0.010 |
| 24PC0040CSSP- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF WEST APAYAO ABULUG IRRIGATION SYSTEM (WAAIS) TUMOG - SAN ISIDRO ROAD, LUNA, APAYAO (KATUBIGAN-KALSADA TUNGO SA PATUBIGAN) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱45.5M | 100% | High risk79 | Flagged0.009 |
| 25PC0027OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUC., APAYAO-ABULUG RIVER BASIN,SAN SEBASTIAN SEC,STA.27+345-STA. 27+715(L/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱95.1M | 79% | High risk91 | Flagged0.007 |
| 25PB0003ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, CAGLAYAN | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.7M | 89% | High risk93 | Flagged0.005 |
| 24PC0047OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0626 + 178 - K0626 + 288 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱25.6M | 100% | High risk79 | Flagged0.004 |
| 25PB0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD PACKAGE 1 (CONSTRUCTION OF CONCRETE ROAD), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱66.6M | 93% | High risk94 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 19PC0037CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL, CONSTRUCTION OF FLOOD CONTROL ALONG CABATACAN BRIDGE, CABATACAN, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.9M | 100% | Medium risk53 | —-0.063 |
| 52 | 20PC0012CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION SAN CARLOS-NUEVA-MARCELA ROAD LEADING TO BACUT LAKE, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.6M | 100% | Medium risk53 | —-0.076 |
| 53 | 20PC0008CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SAN JOSE-SAN SEBASTIAN-SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE, PINEAPPLE, BANANA, VEGETABLES, RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.6M | 100% | Medium risk53 | —-0.078 |
| 54 | 20PC0029CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS TUROD-BAYUGAO ROAD LEADING TO BAYUGAO FALLS, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk53 | —-0.077 |
| 55 | 19PC0006NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY ROAD. K0679+750-K0680+174, K0680+183-K0680+356 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱20.4M | 100% | Medium risk53 | —-0.072 |
| 56 | 22PC0040ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT CONSTRUCTION OF MISSING LINKS/NEW ROADS-PENRO APAYAO (BUROT)-SAN ISIDRO-QUIRINO ROAD, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk53 | —-0.076 |
| 57 | 22PC0053(CSSP)-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) - PANAY-BATO, SABEL ROAD IN SUPPORT OF CASSAVA, CORN, RICE, MANDARIN, TOURISM HANDICRAFT FURNITURE, FRUIT WINES, AND COCONUT, SANTA MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk53 | —-0.076 |
| 58 | 22PC0058BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING (CROP WAREHOUSE), BARANGAY EVA PUZON, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk53 | —-0.068 |
| 59 | 19PC0044CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TUROD-BAYUGAO ROAD LEADING TO BAYUGAO WATERFALLS STA K0000+000-K0000+855 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱17M | 100% | Medium risk53 | —-0.078 |
| 60 | 24PC0071CSSP - CONS/ IMPROVEMENT OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRA PROGRAM-TRIP)-SAN ISIDRO SUR-POB-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM ROAD LEADING TO MANACOTA UNDERGROUND RIVER & OTHER TOURISM AREAS, BRGY. CADACLAN, | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱123.6M | 100% | Medium risk53 | —-0.033 |
| 61 | 23PC0068CONVERGENCE AND SPECIAL SUPPORT PROG.(CSSP)-BASIC INFRASTRUCTURE PROG.(BIP) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF NAGUILLIAN - ELEAZAR- FERDINAND ROAD, CALANASAN,APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.9M | 100% | Medium risk53 | —-0.074 |
| 62 | 21PC0057LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH APAYAO SECOND DEO MATERIAL TESTING LABORATORY, PAYANAN, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk53 | —-0.073 |
| 63 | 22PC0054NETWORK DEVELOPMENT PROGRAM PAVING OF UNPAVED ROADS - TERTIARY ROADS - APAYAO (CALANASAN)-ILOCOS NORTE ROAD - (S00644LZ) CHAINAGE 2298-CHAINAGE 3324 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱43.2M | 100% | Medium risk52 | —-0.071 |
| 64 | 19PC0049CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, SAN CARLOS PALALI-MALEKKEG ROAD IN SUPPORT OF CASSAVA, CORN, RICE, MANDARIN, TOURISM, HANDICRAFT, FURNITURE AND COCONUT, SANTA MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk52 | —-0.078 |
| 65 | 22PC0021BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN GREGORIO, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.9M | 100% | Medium risk52 | —-0.075 |
| 66 | 20PC0013CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PANAY-BATO SABEL ROAD IN SUPPORT OF CASSAVA, CORN, RICE, MANDARIN, TOURISM, HANDICRAFT, FURNITURE, FRUIT WINES AND COCONUT, SANTA MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk52 | —-0.077 |
| 67 | 19PC0042CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION SAN CARLOS-NUEVA-MARCELA ROAD LEADING TO BACUT LAKE, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱19M | 100% | Medium risk52 | —-0.078 |
| 68 | 19PC0047CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PANAY-BATO SABEL ROAD IN SUPPORT OF CASSAVA, CORN, RICE, MANDARIN, TOURISM, HANDICRAFT, FURNITURE, FRUIT WINES AND COCONUT, SANTA MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.5M | 100% | Medium risk52 | —-0.078 |
| 69 | 18PC0018CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SAN CARLOS-PALALI-MALEKKEG ROAD IN SUPPORT OF CASSAVA, CORN, RICE, MANDARIN, TOURISM HANDICRAFTS, FURNITURE AND COCUNUT, SAN CARLOS-PALALI-MALEKKEG 0+000- 0+800, STA | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱18.6M | 100% | Medium risk52 | —-0.076 |
| 70 | 18PC0008CONSTRUCTION OF MPB, APAYAO SCHOOLS DIVISION OFFICE, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.9M | 100% | Medium risk52 | —-0.073 |
| 71 | 20PC0028CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES; SAN CARLOS PALALI-MALEKKEG ROAD IN SUPPORT OF CASSAVA, CORN, RICE, MANDARIN, TOURISM, HANDICRAFT, FURNITURE AND COCONUT, SANTA MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱14.7M | 100% | Medium risk52 | —-0.076 |
| 72 | 24PC0073CSSP-SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG)-EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES-CONSTRUCTION (COMPLETION) OF MALASAKIT CENTER, FAR NORTH LUZON GEN. HOSPITAL AND TRAINING CENTER, QUIRINO, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.5M | 100% | Medium risk52 | —-0.043 |
| 73 | 20PC0037CONSTRUCTION OF MULTI-PURPOSE BUILDING (PNP), SAN GREGORIO, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.9M | 100% | Medium risk52 | —-0.068 |
| 74 | 23PC0016CSSP - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) - SAN CARLOS - SAN ANTONIO - NUEVA-MARCELA ROAD LEADING TO BACUT LAKE, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk52 | —-0.077 |
| 75 | 20PC0043CONSTRUCTION OF MULTI-PURPOSE BUILDING, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱14.3M | 100% | Medium risk52 | —-0.065 |