Opening the dossier…
Opening the dossier…
Contractor dossier
5 projects on file, including joint ventures this contractor is part of.
Total projects
5
Total budget
₱132.5M
Average progress
100.0%
Completion rate
100.0%
Average risk score
51.9
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 4 | ₱80.2M | 46.4 | 0 | 100.0% |
| Region III | 1 | ₱52.3M | 74.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 3 | ₱99.5M | 55.6 | 0 | 100.0% |
| Roads | 2 | ₱33M | 46.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23C00411CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING PUBLIC INFRA./FACILITIES-CONST. OF FLOOD CONTROL STRUCT. AT GALAS MAASIM CREEK ALONG BYPASS RD. (PHASE II), MAASIM, SAN RAFAEL, BULACAN | Region III | Region III | Completed | ₱52.3M | 100% | High risk74 | —-0.063 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23C00411CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING PUBLIC INFRA./FACILITIES-CONST. OF FLOOD CONTROL STRUCT. AT GALAS MAASIM CREEK ALONG BYPASS RD. (PHASE II), MAASIM, SAN RAFAEL, BULACAN | Region III | Region III | Completed | ₱52.3M | 100% | High risk74 | —-0.063 |
| 2 | 22DH0080REPAIR/ REHABILATION/ IMPROVEMENT OF RIVER CONTROL ALONG STA. CRUZ RIVER, BRGY. STO. ANGEL NORTE, STA. CRUZ, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱23.4M | 100% | Medium risk46 | —-0.088 |
| 3 | 22DH0081REPAIR/ REHABILITATION/ IMPROVEMENT OF RIVER CONTROL ALONG STA. CRUZ RIVER, BRGY. STO. ANGEL SUR, STA. CRUZ, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱23.8M | 100% | Medium risk46 | —-0.088 |
| 4 | 21DH0012REHABILITATION OF ROAD ALONG LUMBAN-CALIRAYA ROAD, K0097 + 797 TO K0098 + 541, LUMBAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱15.4M | 100% | Medium risk46 | —-0.103 |
| 5 | 21DH0013REPAIR/REHABILITATION OF ROAD ALONG LUMBAN-CALIRAYA ROAD, K0101 + 790 TO K0102 + 675, LUMBAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱17.6M | 100% | Medium risk46 | —-0.103 |