Contractor dossier
120 projects on file, including joint ventures this contractor is part of.
Total projects
120
Total budget
₱11.3B
Average progress
89.1%
Completion rate
73.3%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
27
22.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 120 | ₱11.3B | 51.4 | 27 | 89.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 80 | ₱8.9B | 52.6 | 12 | 89.5% |
| Buildings and Facilities | 18 | ₱368.8M | 29.7 | 2 | 100.0% |
| Flood Control and Drainage | 11 | ₱1.4B | 58.9 | 7 | 76.8% |
| Bridges | 4 | ₱108.1M | 46.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱109.8M | 91.7 | 2 | 81.9% |
| OTHER | 2 | ₱87.7M | 81.0 | 2 | 83.6% |
| GAA 2025 SSP | 1 | ₱103.4M | 94.6 | 1 | 28.9% |
| GAA 2025 OO-2 | 1 | ₱38.9M | 86.2 | 0 | 99.3% |
| Bridges, Roads | 1 | ₱279.3M | 67.8 | 1 | 29.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EG0014CONSTRUCTION OF ROAD, APORAWAN TO SITIO DAAN, 00+000.00 - 02+098.00, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱103.4M | 29% | High risk95 | Flagged0.055 |
| 25EE0050ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, K0149+000 - K0150+559, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱77M | 64% | High risk92 | Flagged0.021 |
| 25EF0001REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS PPSR K0142+387-K0142+517, K0143+074-K0143+255, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱32.8M | 100% | High risk92 | Flagged0.011 |
| 25EF0044CONSTRUCTION OF MALINAO RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱38.9M | 99% | High risk86 | —-0.002 |
| 24E00262CONCRETING OF SITIO LAMOT BABOY, BRGY. PINAGLABANAN FMR, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱35M | 82% | High risk84 | Flagged0.067 |
| 25EF0065CONST./IMPROVEMENT OF ACCESS ROADS LEADING MALALONG MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY OF PUNANG CHRISTIAN MUSLIM NATIVE, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱52.7M | 85% | High risk78 | Flagged0.016 |
| 25E00096CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGUMPAY RIVER (UPSTREAM), ROXAS, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱115M | 70% | High risk77 | Flagged0.016 |
| 25E00244SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD, PACKAGE A, STA. 0+000-STA. 2+820, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.3M | 30% | High risk68 | Flagged0.029 |
| 25E00118CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE, BATANG-BATANG RIVER, NARRA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱230.6M | 57% | High risk67 | Flagged0.020 |
| 24E00171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MAASIN RIVER FLOOD CONTROL STRUCTURE, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 83% | High risk66 | Flagged0.023 |
| 24E00166FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION TRUCTURE/ROAD DIKE ALONG TIGAPLAN RIVER, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱147.6M | 74% | High risk66 | Flagged0.014 |
| 24E00173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TAGBUAYA RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 74% | High risk66 | Flagged0.025 |
| 24E00170SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF KALITAWAN RIVER FLOOD CONTROL STRUCTURE, STA. 000+700-STA. 000+860; STA. 000+920-STA. 001+040 (LS), | Region IV-B | Region IV-B | On-Going | ₱193M | 81% | High risk65 | Flagged0.025 |
| 17E00052IMPROVEMENT/WIDENING OF PUERTO PRINCESA SOUTH ROAD K004+(-392)-K004+054; K006+738-K007+779; K0007+803-K008+839; K009+071-K009+491; K066+100-K066+670, PPC, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱92.5M | 100% | High risk65 | —-0.028 |
| 23EF0116CONSTRUCTION OF RIVERBANK PROTECTION RIVER CONTROL DIKE ALONG COLBY RIVER (RIGHT SIDE), RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱96.5M | 95% | High risk64 | Flagged0.061 |
| 25E00258SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE C, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 0% | High risk63 | Flagged0.042 |
| 25E00250SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE E, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 11% | High risk63 | Flagged0.020 |
| 25E00249SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE D, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 13% | High risk63 | Flagged0.020 |
| 25E00248SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE C, STA. 6+097.16-STA. 9+297.66, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.4M | 15% | High risk63 | Flagged0.023 |
| 23E00182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE B, PALAWA | Region IV-B | Region IV-B | On-Going | ₱282.6M | 74% | High risk63 | Flagged0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24E00262CONCRETING OF SITIO LAMOT BABOY, BRGY. PINAGLABANAN FMR, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱35M | 82% | High risk84 | Flagged0.067 |
| 23EF0116CONSTRUCTION OF RIVERBANK PROTECTION RIVER CONTROL DIKE ALONG COLBY RIVER (RIGHT SIDE), RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱96.5M | 95% | High risk64 | Flagged0.061 |
| 25EG0014CONSTRUCTION OF ROAD, APORAWAN TO SITIO DAAN, 00+000.00 - 02+098.00, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱103.4M | 29% | High risk95 | Flagged0.055 |
| 25E00258SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE C, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 0% | High risk63 | Flagged0.042 |
| 25E00244SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD, PACKAGE A, STA. 0+000-STA. 2+820, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.3M | 30% | High risk68 | Flagged0.029 |
| 24E00173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TAGBUAYA RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 74% | High risk66 | Flagged0.025 |
| 24E00170SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF KALITAWAN RIVER FLOOD CONTROL STRUCTURE, STA. 000+700-STA. 000+860; STA. 000+920-STA. 001+040 (LS), | Region IV-B | Region IV-B | On-Going | ₱193M | 81% | High risk65 | Flagged0.025 |
| 25E00248SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE C, STA. 6+097.16-STA. 9+297.66, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.4M | 15% | High risk63 | Flagged0.023 |
| 24E00171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MAASIN RIVER FLOOD CONTROL STRUCTURE, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 83% | High risk66 | Flagged0.023 |
| 25EE0050ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, K0149+000 - K0150+559, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱77M | 64% | High risk92 | Flagged0.021 |
| 25E00118CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE, BATANG-BATANG RIVER, NARRA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱230.6M | 57% | High risk67 | Flagged0.020 |
| 25E00250SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE E, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 11% | High risk63 | Flagged0.020 |
| 25E00249SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE D, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 13% | High risk63 | Flagged0.020 |
| 23E00182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE B, PALAWA | Region IV-B | Region IV-B | On-Going | ₱282.6M | 74% | High risk63 | Flagged0.019 |
| 23E00181SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE A, PALAWA | Region IV-B | Region IV-B | On-Going | ₱273.1M | 79% | High risk63 | Flagged0.018 |
| 25E00246SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE A, STA. 0+000.00-STA. 3+391.16, BATA | Region IV-B | Region IV-B | On-Going | ₱279.4M | 31% | High risk63 | Flagged0.017 |
| 25E00096CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGUMPAY RIVER (UPSTREAM), ROXAS, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱115M | 70% | High risk77 | Flagged0.016 |
| 25E00245SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD PACKAGE B, STA. 0+000.00-STA. 2+585.00, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.4M | 30% | High risk63 | Flagged0.016 |
| 25EF0065CONST./IMPROVEMENT OF ACCESS ROADS LEADING MALALONG MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY OF PUNANG CHRISTIAN MUSLIM NATIVE, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱52.7M | 85% | High risk78 | Flagged0.016 |
| 25E00247SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD, PACKAGE B, STA. 3+391.16-STA. 6+097.16, BATAR | Region IV-B | Region IV-B | On-Going | ₱279.4M | 31% | High risk63 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23E00070NETWORK DEVELOPMENT PROGRAM- CONST. OF MISSING LINKS/NEW ROADS- SOPFRONIO ESPANOLA-QUEZON CROSS COUNTRY ROAD (PULOT INTERIOR-TAGUSAO SECTION), PACKAGE H, STA. 180+168.00-STA. 181+689.99, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 63% | High risk62 | Flagged0.011 |
| 27 | 23E00097SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/ CONSERVATION- CONSTRUCTION OF ABORLAN EAST COASTAL ROAD, ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk61 | —-0.037 |
| 28 | 18E00043ROAD WIDENING OF PTO. PRINCESA SOUTH ROAD, KO015+807-KO017+473; KO017+568-KO019+769; KO019+880-KO022+595, PTO. PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | Completed | ₱192.8M | 100% | High risk61 | —-0.035 |
| 29 | 17E00033ROAD UPOGRADING (UNPAVED TO PAVED) ARAMAYWAN-BERONG-PUERTO PRINCESA ROAD K0176+(-1033)-K0176+(-878); K0181+906-K0182+000; K0186+801-K186+1030; K0197+960-K0199+829, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱94.5M | 100% | High risk61 | —-0.004 |
| 30 | 23E00183SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, TAGNATO-TABUD CROSS COUNTRY, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱202.6M | 100% | High risk61 | —-0.026 |
| 31 | 18E00046CONSTRUCTION/IMPROVEMENT OF BACUNGAN-SIMPUCAN-BAGUMBAYAN-NAPSAN ROAD, STA. 38+680.00-STA. 46+944.00, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk61 | —-0.019 |
| 32 | 18E00038REHAB./RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PTO. PRINCESA SOUTH ROAD, KO013+000-KO013+600; KO016+000-KO016+300; KO017+205-KO017+530; KO017+568-KO018+592; KO018+942-KO019+855; KO020+160-KO021+000; KO021+400-KO021+820; KO026+000-KO027+162; KO02 | Region IV-B | Region IV-B | Completed | ₱170.1M | 100% | High risk61 | —-0.038 |
| 33 | 20E00034ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD KO009+462-KO010+018; KO010+094-KO010+239; KO010+315-KO011+635; KO011+705-KO012+180;KO014+921-KO015+807; KO027+262-KO029+962, PUERTO PRINCESA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱175.4M | 100% | High risk61 | —-0.043 |
| 34 | 23E00067NETWORK DEVELOPMENT PROGRAM- CONST. OF MISSING LINKS/NEW ROADS- SOFRONIO ESPANOLA-QUEZON CROSS COUNTRY ROAD (PULOT INTERIOR-TAGUSAO SECTION), PACKAGE G, STA. 177+900-STA. 179+440; STA. 179+600-STA. 180+168, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱144.7M | 68% | High risk61 | —-0.003 |
| 35 | 18E00039REHAB/RECONST/UPGRADING OF DAMAGED PAVED ROADS PPSR (STATIONS 1-13) K045+194.47 TO K072+700, (INTERMITTENT SECTIONS), PALAWAN | Region IV-B | Region IV-B | Completed | ₱150.6M | 100% | High risk60 | —-0.043 |
| 36 | 18E00045CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TALAKAIGAN RIVER HILLSIDE, STA. 4+360-STA.8+995.81; STA. 10+830-STA. 13+035.75, ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱149.6M | 100% | High risk60 | —-0.046 |
| 37 | 22E00034CONSTRUCTION OF MISSING LINKS/NEW ROADS- PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE G, STA. 283+054.00-STA. 288+150.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | Medium risk60 | —-0.033 |
| 38 | 21E00014CONSTRUCTION OF MISSING LINKS/NEW ROADS PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE F, STA. 276+000-STA. 281+854, RIZAL, PALAWAN | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | Medium risk60 | —-0.040 |
| 39 | 20E00027ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD K0122+815 - K0126+342; K0126+542 - K0127+893, NARRA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱141.3M | 100% | Medium risk60 | —-0.049 |
| 40 | 17E00034ROAD UPGRADING (UNPAVED TO PAVED), ARAMAYWAN-BERONG-PTO. PRINCESA ROAD, KO200+416.00-KO202+521.35, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱93.3M | 100% | Medium risk60 | Flagged0.003 |
| 41 | 17E00032IMPROVEMENT/WIDENING OF PUERTO PRINCESA SOUTH ROAD K0077+000 - K0079+512; K0079+534 - K0081+1003, PALAWAN | Region IV-B | Region IV-B | Completed | ₱121.8M | 100% | Medium risk59 | —-0.021 |
| 42 | 17EG0060ROAD UPGRADING (UNPAVED TO PAVED) ARAMAYWN-BERONG-PTO. PRINCESA ROAD, K0224+689-K0224+999, K0208+897-K0209+037, K0209+110-K0209+240, K0209+690-K0209+792, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱22.7M | 100% | Medium risk59 | —-0.031 |
| 43 | 17EG0059RECONSTRUCTION OF PUERTO PRINCESA SOUTH ROAD, K0018+592 - K0018+782, K0018+782 - K0018+942, K0011+707 - K0012+600, K0013+600 - K0013+800, PUERTO PRINCESA CITY | Region IV-B | Palawan 3rd DEO | Completed | ₱42.6M | 100% | Medium risk59 | —-0.035 |
| 44 | 17EG0057RECONSTRUCTION OF IRAWAN-TAGBUROS ROAD, K0012+(-667) - K0012+(-484)), K0012+194 - K0012+744, PUERTO PRINCESA CITY | Region IV-B | Palawan 3rd DEO | Completed | ₱17.7M | 100% | Medium risk59 | —-0.036 |
| 45 | 22E00137CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PUERTO PRINCESA SOUTH DIVERSION ROAD II, STA. 47+635-STA. 49+460, PALAWAN | Region IV-B | Region IV-B | Completed | ₱132.2M | 100% | Medium risk58 | —-0.049 |
| 46 | 18E00044ROAD WIDENING OFTAPUL- BAHILE ROAD, KO038+955.00 TO KO042+1168.00, PTO. PRINCESA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱128.1M | 100% | Medium risk56 | —-0.044 |
| 47 | 20E00100CLUSTER 7 - CONCRETING OF VARIOUS ROADS ALONG PUROK VALDERAMA, RAMPANO ROAD, SAMPALOC ROAD, NIA ROAD, PUROK MASAGANA, PUROK MAGKAKAISA, PUROK KATUMBAL AND LEADING TO PALSAHAN POOL, PALAWAN | Region IV-B | Region IV-B | Completed | ₱121.9M | 100% | Medium risk56 | —-0.060 |
| 48 | 21E00022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS TO BARANGAYS APORAWAN, BARAKE, MAGBABADIL, MABINI TO POBLACION, IN SUPPORT TO COCONUT, CACAO AND OIL PALM INDUSTRY, KO000+000-KO003+592, ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱120.6M | 100% | Medium risk56 | —-0.054 |
| 49 | 22EG0069CLUSTER 7: CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT), 7.1. STA. 00+000-STA. 01+190; 7.2. SECTION 1: 00+000-00+626; SECTION 2: 00+00 | Region IV-B | Palawan 3rd DEO | Completed | ₱116M | 100% | Medium risk55 | —-0.057 |
| 50 | 20E00028ROAD WIDENING - SECONDARY ROADS PUERTO PRINCESA SOUTH ROAD K086+331 - K086+900; K087+060 - K090+06; K094+048 - K094+564, PUERTO PRINCESA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱117.2M | 100% | Medium risk55 | —-0.058 |