Contractor dossier
120 projects on file, including joint ventures this contractor is part of.
Total projects
120
Total budget
₱11.3B
Average progress
89.1%
Completion rate
73.3%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
27
22.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 120 | ₱11.3B | 51.4 | 27 | 89.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 80 | ₱8.9B | 52.6 | 12 | 89.5% |
| Buildings and Facilities | 18 | ₱368.8M | 29.7 | 2 | 100.0% |
| Flood Control and Drainage | 11 | ₱1.4B | 58.9 | 7 | 76.8% |
| Bridges | 4 | ₱108.1M | 46.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱109.8M | 91.7 | 2 | 81.9% |
| OTHER | 2 | ₱87.7M | 81.0 | 2 | 83.6% |
| GAA 2025 SSP | 1 | ₱103.4M | 94.6 | 1 | 28.9% |
| GAA 2025 OO-2 | 1 | ₱38.9M | 86.2 | 0 | 99.3% |
| Bridges, Roads | 1 | ₱279.3M | 67.8 | 1 | 29.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EG0014CONSTRUCTION OF ROAD, APORAWAN TO SITIO DAAN, 00+000.00 - 02+098.00, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱103.4M | 29% | High risk95 | Flagged0.055 |
| 25EE0050ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, K0149+000 - K0150+559, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱77M | 64% | High risk92 | Flagged0.021 |
| 25EF0001REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS PPSR K0142+387-K0142+517, K0143+074-K0143+255, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱32.8M | 100% | High risk92 | Flagged0.011 |
| 25EF0044CONSTRUCTION OF MALINAO RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱38.9M | 99% | High risk86 | —-0.002 |
| 24E00262CONCRETING OF SITIO LAMOT BABOY, BRGY. PINAGLABANAN FMR, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱35M | 82% | High risk84 | Flagged0.067 |
| 25EF0065CONST./IMPROVEMENT OF ACCESS ROADS LEADING MALALONG MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY OF PUNANG CHRISTIAN MUSLIM NATIVE, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱52.7M | 85% | High risk78 | Flagged0.016 |
| 25E00096CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGUMPAY RIVER (UPSTREAM), ROXAS, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱115M | 70% | High risk77 | Flagged0.016 |
| 25E00244SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD, PACKAGE A, STA. 0+000-STA. 2+820, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.3M | 30% | High risk68 | Flagged0.029 |
| 25E00118CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE, BATANG-BATANG RIVER, NARRA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱230.6M | 57% | High risk67 | Flagged0.020 |
| 24E00171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MAASIN RIVER FLOOD CONTROL STRUCTURE, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 83% | High risk66 | Flagged0.023 |
| 24E00166FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION TRUCTURE/ROAD DIKE ALONG TIGAPLAN RIVER, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱147.6M | 74% | High risk66 | Flagged0.014 |
| 24E00173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TAGBUAYA RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 74% | High risk66 | Flagged0.025 |
| 24E00170SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF KALITAWAN RIVER FLOOD CONTROL STRUCTURE, STA. 000+700-STA. 000+860; STA. 000+920-STA. 001+040 (LS), | Region IV-B | Region IV-B | On-Going | ₱193M | 81% | High risk65 | Flagged0.025 |
| 17E00052IMPROVEMENT/WIDENING OF PUERTO PRINCESA SOUTH ROAD K004+(-392)-K004+054; K006+738-K007+779; K0007+803-K008+839; K009+071-K009+491; K066+100-K066+670, PPC, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱92.5M | 100% | High risk65 | —-0.028 |
| 23EF0116CONSTRUCTION OF RIVERBANK PROTECTION RIVER CONTROL DIKE ALONG COLBY RIVER (RIGHT SIDE), RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱96.5M | 95% | High risk64 | Flagged0.061 |
| 25E00258SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE C, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 0% | High risk63 | Flagged0.042 |
| 25E00250SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE E, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 11% | High risk63 | Flagged0.020 |
| 25E00249SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE D, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 13% | High risk63 | Flagged0.020 |
| 25E00248SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE C, STA. 6+097.16-STA. 9+297.66, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.4M | 15% | High risk63 | Flagged0.023 |
| 23E00182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE B, PALAWA | Region IV-B | Region IV-B | On-Going | ₱282.6M | 74% | High risk63 | Flagged0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24E00262CONCRETING OF SITIO LAMOT BABOY, BRGY. PINAGLABANAN FMR, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱35M | 82% | High risk84 | Flagged0.067 |
| 23EF0116CONSTRUCTION OF RIVERBANK PROTECTION RIVER CONTROL DIKE ALONG COLBY RIVER (RIGHT SIDE), RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱96.5M | 95% | High risk64 | Flagged0.061 |
| 25EG0014CONSTRUCTION OF ROAD, APORAWAN TO SITIO DAAN, 00+000.00 - 02+098.00, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱103.4M | 29% | High risk95 | Flagged0.055 |
| 25E00258SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE C, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 0% | High risk63 | Flagged0.042 |
| 25E00244SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD, PACKAGE A, STA. 0+000-STA. 2+820, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.3M | 30% | High risk68 | Flagged0.029 |
| 24E00173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TAGBUAYA RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 74% | High risk66 | Flagged0.025 |
| 24E00170SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF KALITAWAN RIVER FLOOD CONTROL STRUCTURE, STA. 000+700-STA. 000+860; STA. 000+920-STA. 001+040 (LS), | Region IV-B | Region IV-B | On-Going | ₱193M | 81% | High risk65 | Flagged0.025 |
| 25E00248SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE C, STA. 6+097.16-STA. 9+297.66, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.4M | 15% | High risk63 | Flagged0.023 |
| 24E00171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MAASIN RIVER FLOOD CONTROL STRUCTURE, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 83% | High risk66 | Flagged0.023 |
| 25EE0050ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, K0149+000 - K0150+559, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱77M | 64% | High risk92 | Flagged0.021 |
| 25E00118CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE, BATANG-BATANG RIVER, NARRA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱230.6M | 57% | High risk67 | Flagged0.020 |
| 25E00250SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE E, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 11% | High risk63 | Flagged0.020 |
| 25E00249SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE D, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 13% | High risk63 | Flagged0.020 |
| 23E00182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE B, PALAWA | Region IV-B | Region IV-B | On-Going | ₱282.6M | 74% | High risk63 | Flagged0.019 |
| 23E00181SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE A, PALAWA | Region IV-B | Region IV-B | On-Going | ₱273.1M | 79% | High risk63 | Flagged0.018 |
| 25E00246SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE A, STA. 0+000.00-STA. 3+391.16, BATA | Region IV-B | Region IV-B | On-Going | ₱279.4M | 31% | High risk63 | Flagged0.017 |
| 25E00096CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGUMPAY RIVER (UPSTREAM), ROXAS, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱115M | 70% | High risk77 | Flagged0.016 |
| 25E00245SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD PACKAGE B, STA. 0+000.00-STA. 2+585.00, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.4M | 30% | High risk63 | Flagged0.016 |
| 25EF0065CONST./IMPROVEMENT OF ACCESS ROADS LEADING MALALONG MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY OF PUNANG CHRISTIAN MUSLIM NATIVE, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱52.7M | 85% | High risk78 | Flagged0.016 |
| 25E00247SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD, PACKAGE B, STA. 3+391.16-STA. 6+097.16, BATAR | Region IV-B | Region IV-B | On-Going | ₱279.4M | 31% | High risk63 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22E00131CLUSTER 6: ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, PALAWAN, 6.1. KO012+180.00-KO013+780.00; 6.2. KO013+967.00-KO014+740.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱111M | 100% | Medium risk53 | —-0.059 |
| 52 | 22E00063ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, KO108+960-KO109+423; KO109+453-KO110+323; KO114+000-KO115+386; KO115+425-KO116+431, PALAWAN | Region IV-B | Region IV-B | Completed | ₱106.1M | 100% | Medium risk53 | —-0.055 |
| 53 | 21E00015CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO FRESH WATER MINI LAGOON VERSION IN SAMARINIANA UPPER TAMLANG DAM, KO000+000-KO003+585.18, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | Completed | ₱97.7M | 100% | Medium risk53 | —-0.052 |
| 54 | 22E00062ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, KO118+000-KO118+459, KO118+715-KO119+868, KO120+171-KO122+000, PALAWAN | Region IV-B | Region IV-B | Completed | ₱106.1M | 100% | Medium risk53 | —-0.054 |
| 55 | 18E00037CONSTRUCTION/IMPROVEMENT OF NATIONAL ROAD JUNCTION LEADING TO TABON CAVE, STA. 1+276.50 TO STA. 3+144.12, QUEZON, PALAWAN | Region IV-B | Region IV-B | Completed | ₱107M | 100% | Medium risk53 | —-0.054 |
| 56 | 21E00013ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, KO101+000.00-KO101+908.00; KO101+1001-KO102+332.00; KO102+726.00-KO104+776.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱101.3M | 100% | Medium risk53 | —-0.057 |
| 57 | 23E00069CONSTRUCTION OF MISSING LINKS/NEW ROADS- PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE I, STA. 290+605-STA. 293+380, PALAWAN | Region IV-B | Region IV-B | Completed | ₱101.3M | 100% | Medium risk53 | —-0.050 |
| 58 | 23E00068CONSTRUCTION OF MISSING LINKS/NEW ROADS- PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE H, STA. 288+291-STA. 289+353.70; STA. 289+414.30-STA. 290+605, PALAWAN | Region IV-B | Region IV-B | Completed | ₱101.3M | 100% | Medium risk53 | —-0.050 |
| 59 | 20E00048VIILP- WIDENING OF ROAD, PALAWAN CIRCUMFERENTIAL ROAD (S00063PW), KO256+569.00-KO259+507.00; KO259+769.00-KO260+751.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.051 |
| 60 | 20E00047VIILP- WIDENING OF ROAD, PALAWAN CIRCUMFERENTIAL ROAD (S0063PW), KO252+1023-KO255+768.00; KO255+827.00-KO255+1201; KO256+099.00-KO256+569.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.051 |
| 61 | 20E00049VIILP- WIDENING OF ROAD, PALAWAN CIRCUMFERENTIAL ROAD (S00063PW), KO260+751.00-KO263+514.00; KO263+746.00-KO265+598.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.051 |
| 62 | 17E00031REHABILITATION/RECONSTRUCTION/UPGRADING OF PPSR K0169+559-K0169+657; K0172+042-K0172+068; K0175+988-K0176+000; K0176+212-K0176+240; K0179+755 - K0181+684; K0181+850-K181+991; K182+065-K0182+272; K0182+414 - K0184+091; K0184+524 - K0185+679, PALAWAN | Region IV-B | Region IV-B | Completed | ₱118.9M | 100% | Medium risk53 | —-0.019 |
| 63 | 22E00046CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-BACUNGAN-SIMPUCAN-BAGUMBAYAN-NAPSAN ROAD, STA. 29+500-STA. 31+130; STA. 46+084-STA. 47+495, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Region IV-B | Completed | ₱100M | 100% | Medium risk52 | —-0.060 |
| 64 | 21E00021ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, KO022+595.00-KO022+974.00; KO023+049.00-KO023+650.00; KO025+024.00-KO027+156.00, PUERTO PRINCESA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱99.4M | 100% | Medium risk52 | —-0.061 |
| 65 | 22E00139SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - SIPAG - CONSTRUCTION OF MAGBABADIL-MAGSAYSAY ROAD STA.0+000-STA.3+392, ABORLAN, PALAWAN | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk52 | —-0.055 |
| 66 | 21EG0062CONSTRUCTION OF IRAAN RIVER WATERWAYS, STA. 0+000.00 - 0+600.00, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱89.7M | 100% | Medium risk51 | —-0.040 |
| 67 | 17EG0030RETROFITTING/STRENGTHENING OF ABORLAN BRIDGE (B00022PW) ALONG PUERTO PRINCESA SOUTH ROAD, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱19.1M | 100% | Medium risk50 | —-0.013 |
| 68 | 22EG0063CLUSTER 2: ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, 2.1: KO033+260-KO033+629; 2.2. KO039+698-KO040+000; KO045+700-KO046+000; 2.3. KO036+529-KO037+498, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱91.6M | 100% | Medium risk50 | —-0.061 |
| 69 | 20EF0011PAVING OF UNPAVED ROAD PALAWAN CIRCUMFERENTIAL RD., BATATARAZA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱90.6M | 100% | Medium risk50 | —-0.053 |
| 70 | 17EF0019WIDENING OF PERMANENT BRIDGES FROM 1 TO 2 LANES SABSABAN BR. (B00164PW) PPSR JCT (ABO-ABO) QUEZON RD | Region IV-B | Palawan 2nd DEO | Completed | ₱19.1M | 100% | Medium risk50 | —-0.011 |
| 71 | 18EF0077REHAB./RECONST./UPGRADING OF PPSR, K0166+333-K0166+363; K0135+072.5-K0135+230; K0185+694.4-K0186+000; K0188+276-K0189+897; K0154+390-K0154+450, ESPAÑOLA & BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱59.6M | 100% | Medium risk48 | —-0.061 |
| 72 | 21E00103CLUSTER 11-CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS & BRIDGES-LOCAL ROADS. 11.1. CONC.OF HI-WAY JUNCTION PLARIDEL-TIGMAN-CABURIAN ROAD, STA. 0+000-STA. 1+143, 11.2. CONC. OF PLARIDEL-APIS-CABIGAAN ROA | Region IV-B | Palawan 3rd DEO | Completed | ₱72.3M | 100% | Medium risk48 | —-0.065 |
| 73 | 18EG0092ROAD CONCRETING - SAGPANGAN TRIBAL MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY, STA. 000+000 - STA. 002+800, SAGPANGAN, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱65.9M | 100% | Medium risk48 | —-0.059 |
| 74 | 18EG0088ROAD CONCRETING - ACCESS ROADS TO BARANGAYS APORAWAN, BARAKE, MAGBABADIL, MABINI TO POBLACION, IN SUPPORT OF COCONUT, CACAO, AND OIL PALM INDUSTRY, STA. 000+000 - STA. 002+840, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱65.8M | 100% | Medium risk48 | —-0.065 |
| 75 | 18EG0091ROAD CONCRETING - SITIO COMMUNAL MULTI-PURPOSE COOPERATIVE ROAD CONNECTING BARANGAY ROAD OF IRAAN IN SUPPORT OF OIL PALM INDUSTRY, STA. 00+000.00 - STA. 03+790.00, IRAAN, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱65.9M | 100% | Medium risk48 | —-0.066 |