Opening the dossier…
Opening the dossier…
Contractor dossier
120 projects on file, including joint ventures this contractor is part of.
Total projects
120
Total budget
₱11.3B
Average progress
89.1%
Completion rate
73.3%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
27
22.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 120 | ₱11.3B | 51.4 | 27 | 89.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 80 | ₱8.9B | 52.6 | 12 | 89.5% |
| Buildings and Facilities | 18 | ₱368.8M | 29.7 | 2 | 100.0% |
| Flood Control and Drainage | 11 | ₱1.4B | 58.9 | 7 | 76.8% |
| Bridges | 4 | ₱108.1M | 46.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱109.8M | 91.7 | 2 | 81.9% |
| OTHER | 2 | ₱87.7M | 81.0 | 2 | 83.6% |
| GAA 2025 SSP | 1 | ₱103.4M | 94.6 | 1 | 28.9% |
| GAA 2025 OO-2 | 1 | ₱38.9M | 86.2 | 0 | 99.3% |
| Bridges, Roads | 1 | ₱279.3M | 67.8 | 1 | 29.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EG0014CONSTRUCTION OF ROAD, APORAWAN TO SITIO DAAN, 00+000.00 - 02+098.00, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱103.4M | 29% | High risk95 | Flagged0.055 |
| 25EE0050ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, K0149+000 - K0150+559, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱77M | 64% | High risk92 | Flagged0.021 |
| 25EF0001REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS PPSR K0142+387-K0142+517, K0143+074-K0143+255, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱32.8M | 100% | High risk92 | Flagged0.011 |
| 25EF0044CONSTRUCTION OF MALINAO RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱38.9M | 99% | High risk86 | —-0.002 |
| 24E00262CONCRETING OF SITIO LAMOT BABOY, BRGY. PINAGLABANAN FMR, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱35M | 82% | High risk84 | Flagged0.067 |
| 25EF0065CONST./IMPROVEMENT OF ACCESS ROADS LEADING MALALONG MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY OF PUNANG CHRISTIAN MUSLIM NATIVE, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱52.7M | 85% | High risk78 | Flagged0.016 |
| 25E00096CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGUMPAY RIVER (UPSTREAM), ROXAS, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱115M | 70% | High risk77 | Flagged0.016 |
| 25E00244SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD, PACKAGE A, STA. 0+000-STA. 2+820, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.3M | 30% | High risk68 | Flagged0.029 |
| 25E00118CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE, BATANG-BATANG RIVER, NARRA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱230.6M | 57% | High risk67 | Flagged0.020 |
| 24E00171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MAASIN RIVER FLOOD CONTROL STRUCTURE, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 83% | High risk66 | Flagged0.023 |
| 24E00166FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION TRUCTURE/ROAD DIKE ALONG TIGAPLAN RIVER, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱147.6M | 74% | High risk66 | Flagged0.014 |
| 24E00173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TAGBUAYA RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 74% | High risk66 | Flagged0.025 |
| 24E00170SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF KALITAWAN RIVER FLOOD CONTROL STRUCTURE, STA. 000+700-STA. 000+860; STA. 000+920-STA. 001+040 (LS), | Region IV-B | Region IV-B | On-Going | ₱193M | 81% | High risk65 | Flagged0.025 |
| 17E00052IMPROVEMENT/WIDENING OF PUERTO PRINCESA SOUTH ROAD K004+(-392)-K004+054; K006+738-K007+779; K0007+803-K008+839; K009+071-K009+491; K066+100-K066+670, PPC, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱92.5M | 100% | High risk65 | —-0.028 |
| 23EF0116CONSTRUCTION OF RIVERBANK PROTECTION RIVER CONTROL DIKE ALONG COLBY RIVER (RIGHT SIDE), RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱96.5M | 95% | High risk64 | Flagged0.061 |
| 25E00258SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE C, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 0% | High risk63 | Flagged0.042 |
| 25E00250SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE E, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 11% | High risk63 | Flagged0.020 |
| 25E00249SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE D, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 13% | High risk63 | Flagged0.020 |
| 25E00248SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE C, STA. 6+097.16-STA. 9+297.66, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.4M | 15% | High risk63 | Flagged0.023 |
| 23E00182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE B, PALAWA | Region IV-B | Region IV-B | On-Going | ₱282.6M | 74% | High risk63 | Flagged0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24E00262CONCRETING OF SITIO LAMOT BABOY, BRGY. PINAGLABANAN FMR, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱35M | 82% | High risk84 | Flagged0.067 |
| 23EF0116CONSTRUCTION OF RIVERBANK PROTECTION RIVER CONTROL DIKE ALONG COLBY RIVER (RIGHT SIDE), RIZAL, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱96.5M | 95% | High risk64 | Flagged0.061 |
| 25EG0014CONSTRUCTION OF ROAD, APORAWAN TO SITIO DAAN, 00+000.00 - 02+098.00, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | On-Going | ₱103.4M | 29% | High risk95 | Flagged0.055 |
| 25E00258SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF CABIGAAN-APURAWAN CROSS COUNTRY ROAD PACKAGE C, ABORLAN, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 0% | High risk63 | Flagged0.042 |
| 25E00244SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD, PACKAGE A, STA. 0+000-STA. 2+820, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.3M | 30% | High risk68 | Flagged0.029 |
| 24E00173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TAGBUAYA RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 74% | High risk66 | Flagged0.025 |
| 24E00170SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF KALITAWAN RIVER FLOOD CONTROL STRUCTURE, STA. 000+700-STA. 000+860; STA. 000+920-STA. 001+040 (LS), | Region IV-B | Region IV-B | On-Going | ₱193M | 81% | High risk65 | Flagged0.025 |
| 25E00248SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE C, STA. 6+097.16-STA. 9+297.66, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.4M | 15% | High risk63 | Flagged0.023 |
| 24E00171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF MAASIN RIVER FLOOD CONTROL STRUCTURE, BROOKE'S POINT, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱193M | 83% | High risk66 | Flagged0.023 |
| 25EE0050ROAD WIDENING OF PUERTO PRINCESA NORTH ROAD, K0149+000 - K0150+559, ROXAS, PALAWAN | Region IV-B | Palawan 1st DEO | On-Going | ₱77M | 64% | High risk92 | Flagged0.021 |
| 25E00118CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD MITIGATION STRUCTURE, BATANG-BATANG RIVER, NARRA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱230.6M | 57% | High risk67 | Flagged0.020 |
| 25E00250SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE E, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 11% | High risk63 | Flagged0.020 |
| 25E00249SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE D, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱232.8M | 13% | High risk63 | Flagged0.020 |
| 23E00182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE B, PALAWA | Region IV-B | Region IV-B | On-Going | ₱282.6M | 74% | High risk63 | Flagged0.019 |
| 23E00181SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE A, PALAWA | Region IV-B | Region IV-B | On-Going | ₱273.1M | 79% | High risk63 | Flagged0.018 |
| 25E00246SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE A, STA. 0+000.00-STA. 3+391.16, BATA | Region IV-B | Region IV-B | On-Going | ₱279.4M | 31% | High risk63 | Flagged0.017 |
| 25E00096CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, TAGUMPAY RIVER (UPSTREAM), ROXAS, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱115M | 70% | High risk77 | Flagged0.016 |
| 25E00245SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD PACKAGE B, STA. 0+000.00-STA. 2+585.00, BATARAZA, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱279.4M | 30% | High risk63 | Flagged0.016 |
| 25EF0065CONST./IMPROVEMENT OF ACCESS ROADS LEADING MALALONG MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY OF PUNANG CHRISTIAN MUSLIM NATIVE, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱52.7M | 85% | High risk78 | Flagged0.016 |
| 25E00247SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD, PACKAGE B, STA. 3+391.16-STA. 6+097.16, BATAR | Region IV-B | Region IV-B | On-Going | ₱279.4M | 31% | High risk63 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 21EG0059CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PUERTO PRINCESA SOUTH RD - K0035+600 - K0035 +790, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱66.5M | 100% | Medium risk48 | —-0.067 |
| 77 | 22EG0068CLUSTER 5: ROAD WIDENING OF PUERTO PRINCESA SOUTH ROAD, 5.1: KO046+000-KO047+300; KO047+440-KO047+522; 5.2: KO076+171-KO076+874, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱62M | 100% | Medium risk48 | —-0.069 |
| 78 | 24EF0066BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES TIGAPLAN BR. (B00114PW) ALONG PUERTO PRINCESA SOUTH RD., BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱47M | 100% | Medium risk46 | —-0.005 |
| 79 | 24E00082CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP)-CONST. OF ROAD LEADING TO EL SALVADOR NATURE PARK/EL SALVADOR FALLS, BRGY. PULOT INTERIOR, SOFRONIO, ESPANOLA,, PALAWAN | Region IV-B | Region IV-B | On-Going | ₱48.2M | 90% | Medium risk45 | —-0.033 |
| 80 | 18EG0081PAVING OF UNPAVED ROADS - ARAMAYWAN BERONG-PTO. PRINCESA ROAD, K0231+054 - K00232 + 825, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱50.8M | 100% | Medium risk44 | —-0.065 |
| 81 | 24EF0006CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO MALALONG MULTI-PURPOSE COOPERATIVE ROAD IN SUPPORT OF OIL PALM INDUSTRY OF PUNANG CHRISTIAN MUSLIM NATIVE, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱49M | 100% | Medium risk44 | —-0.064 |
| 82 | 25EF0052ROAD WIDENING-SECONDARY ROADS PUERTO PRINCESA SOUTH RD K0216+693-K0218+422, BATARAZA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱46M | 65% | Medium risk42 | —-0.034 |
| 83 | 24EF0038CONST. OF BATANG-BATANG RIVER IRRIGATION SYSTEM LATERAL E SERVICE ROAD, BARANGAY MALINAO, NARRA, PALAWAN (KATUBIGAN-KALSADA TUNGO SA PATUBIGAN), NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱46.5M | 91% | Medium risk42 | —-0.032 |
| 84 | 25EF0009CONST. OF PULOT RIVER CONTROL STRUCTURE, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱34.1M | 27% | Medium risk42 | —-0.003 |
| 85 | 25EF0008CONST. OF FLOOD MITIGATION STRUCTURE, BARANGAY MALATGAO, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱34.1M | 83% | Medium risk42 | —-0.019 |
| 86 | 22EF0068CONST. OF TAGUSAO RIVER FLOOD CONTROL STRUCTURE STA. 0+000-STA. 0+200, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱39.2M | 100% | Medium risk42 | —-0.043 |
| 87 | 23EF0025CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS, TAGPINASAO ROAD LEADING TO ECO-TOURISM SITE IN SALOGON, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱35.9M | 100% | Medium risk41 | —-0.064 |
| 88 | 22EG0072CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR REHABILITATION AND RECOVERY COVID-19 FACILITIES, BRGY. MAGSAYSAY, ABORLAN, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱53.1M | 100% | Medium risk41 | —-0.051 |
| 89 | 24EF0061REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS QUEZON-PUNTA BAJA RD. K0151+749-K0151+814, K0163+800-K0163+850, K0167+270-K0167+300, K0170+370-K0170+500, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱38.9M | 100% | Medium risk41 | —-0.064 |
| 90 | 18EF0082CONST./IMPROVEMENT OF PANGOBILIAN ROAD LEADING TO MAINIT SEVEN FALLS, BRGY MAINIT, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱34M | 100% | Medium risk41 | —-0.064 |
| 91 | 18EF0081CONSTRUCTION/IMPROVEMENT OF PARATUNGON ROAD LEADING TO SIR BROOKES AND TANAKI BEACH RESORTS | Region IV-B | Palawan 2nd DEO | Completed | ₱34M | 100% | Medium risk41 | —-0.064 |
| 92 | 18EF0095CONST./IMPROVEMENT OF MAINIT FALLS ROAD LEADING TO SABSABAN FALLS, BRGY. ARIBUNGOS, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱34.3M | 100% | Medium risk41 | —-0.064 |
| 93 | 23EF0015REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS PUERTO PRINCESA SOUTH RD-K0120+850-K0122+715, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱42.2M | 100% | Medium risk40 | —-0.067 |
| 94 | 24EF0029REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS PUERTO PRINCESA SOUTH RD-K0135+640-K0135+740, K0137+903-K0138+012,K0140+170-K0140+260, K0140+835-K0140+940, SOFRONIO ESPANOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱37.6M | 100% | Medium risk40 | —-0.066 |
| 95 | 21EF0104ROAD WIDENING-PPSR JCT (ABO-ABO)-QUEZON RD. K0129+(-572)-K0129+975, QUEZON, PLAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱30.4M | 100% | Medium risk40 | —-0.067 |
| 96 | 21EF0073CONST. OF ROAD, DUMANGUEÑA ROAD TO SITIO BUONG ROAD, BRGY DUMANGUEÑA, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱37.2M | 100% | Medium risk40 | —-0.069 |
| 97 | 18EG0030WIDENING OF CARAMURAN BRIDGE (B00327PW) ALONG PUERTO PRINCESA SOUTH ROAD, PUERTO PRINCESA CITY | Region IV-B | Palawan 3rd DEO | Completed | ₱22.8M | 100% | Medium risk40 | —-0.022 |
| 98 | 19EF0059CONSTRUCTION/IMPROVEMENT OF PANGOBILIAN ROAD LEADING TO MAINIT SEVEN FALLS, BRGY MAINIT, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱19.6M | 100% | Medium risk40 | —-0.064 |
| 99 | 18EF0085CONST./IMPROVEMENT OF JCT. PUERTO PRINCESA SOUTH ROAD LEADING TO MAINIT FALLS, BRGY MAINIT, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱19.4M | 100% | Medium risk40 | —-0.065 |
| 100 | 19EF0058CONSTRUCTION/IMPROVEMENT OF MAINIT FALLS ROAD LEADING TO SABSABAN FALLS, BRGY. ARIBUNGOS, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱19.6M | 100% | Medium risk40 | —-0.066 |