Contractor dossier
235 projects on file, including joint ventures this contractor is part of.
Total projects
235
Total budget
₱9.9B
Average progress
90.3%
Completion rate
70.6%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
37
15.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 234 | ₱9.8B | 51.5 | 37 | 90.2% |
| Negros Island Region | 1 | ₱73.5M | 51.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 110 | ₱6.1B | 51.6 | 2 | 95.9% |
| Buildings and Facilities | 80 | ₱2B | 43.9 | 14 | 86.5% |
| Bridges | 17 | ₱446.1M | 48.4 | 2 | 97.0% |
| OTHER | 15 | ₱753.6M | 82.9 | 14 | 71.6% |
| Flood Control and Drainage | 4 | ₱193.6M | 48.4 | 0 | 77.3% |
| GAA 2025 SSP | 3 | ₱102M | 94.3 | 3 | 89.0% |
| Bridges, Roads | 2 | ₱184.1M | 57.0 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱11.9M | 34.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱40.5M | 93.0 | 1 | 19.8% |
| GAA 2025 OO-2 | 1 | ₱66.4M | 92.4 | 1 | 21.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GE0046CONSTRUCTION OF CONCRETE ROAD - IMPROVEMENT OF ALAGUISOC-PIÑA ROAD, BARANGAY ALAGUISOC, JORDAN AND BARANGAY PIÑA, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱62.6M | 98% | High risk96 | Flagged0.013 |
| 25GE0048CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF CROSSING DAVID TO ALUBIHOD ROAD, BARANGAY POBLACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.7M | 70% | High risk95 | Flagged0.022 |
| 25GB0075PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - SIBALOM - PISANAN RD - K0107+(-078) - K0109+000, ANTIQUE | Region VI | Antique DEO | On-Going | ₱40.5M | 20% | High risk93 | Flagged0.018 |
| 25GP0020CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAYA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱66.4M | 22% | High risk92 | Flagged0.011 |
| 25GE0019CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF SITIO PAG-ASA-SITIO TOONG-SITIO ILAYA-SITIO LUSONG-JCT. GCR ROAD, BARANGAY CABALAGNAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱9.8M | 99% | High risk92 | Flagged0.011 |
| 24G00108PHASE II OF THE CONSTRUCTION OF DENR- MINES AND GEOSCIENCES REGION VI OFFICE BUILDING | Region VI | Region VI | On-Going | ₱41.7M | 75% | High risk89 | Flagged0.058 |
| 24G00119LGU HOSPITALS-ALTAVAS DISTRICT HOSPITAL, AKLAN | Region VI | Region VI | On-Going | ₱39.7M | 33% | High risk88 | Flagged0.066 |
| 24G00067SHARED PROCESSING FACILITY - WHITE COPRA (RBDO WHOLE NUT BUILDING) | Region VI | Region VI | On-Going | ₱37.9M | 96% | High risk88 | Flagged0.052 |
| 24G00109CONSTRUCTION OF ACADEMIC BUILDING I, HIMAMAYLAN CAMPUS - WEST VISAYAS STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱19.9M | 71% | High risk88 | Flagged0.054 |
| 24G00097CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS ARENA) IN JARO ILOILO CITY | Region VI | Region VI | On-Going | ₱96M | 82% | High risk85 | Flagged0.013 |
| 24GI0132CONSTRUCTION OF MULTI-PURPOSE BUILDING (CLASSROOM AND AUDITORIUM), PAVIA NATIONAL HIGH SCHOOL, PUROK 1, PAVIA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱93.1M | 53% | High risk83 | Flagged0.020 |
| 24G00052CONSTRUCTION OF NEW ILOILO CITY DISTRICT JAIL BUILDING PHASE I, BRGY. BUNTATALA, LEGANES, ILOILO | Region VI | Region VI | On-Going | ₱72.4M | 79% | High risk82 | Flagged0.010 |
| 24GE0048ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0020+490-K0020+740, K0023+654-K0024+000, K0029+859-K0029+1000, K0039+214-K0040+280 | Region VI | Guimaras DEO | On-Going | ₱81.6M | 77% | High risk82 | Flagged0.014 |
| 24GI0123CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX FACILITIES), STA BARBARA CENTRAL ELEMENTARY SCHOOL, STA. BARBARA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱51.8M | 31% | High risk81 | Flagged0.021 |
| 24GI0122CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX FACILITIES), PAVIA NATIONAL HIGH SCHOOL, PAVIA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱52M | 32% | High risk81 | Flagged0.020 |
| 25G00075CONSTRUCTION (COMPLETION) OF THREE STOREY DPWH REGIONAL OFFICE VI BUILDING, FORT SAN PEDRO, ILOILO CITY | Region VI | Region VI | On-Going | ₱48.2M | 52% | High risk81 | Flagged0.010 |
| 22G00039CONSTRUCTION (COMPLETION) OF THREE STOREY DPWH REGIONAL OFFICE VI BUILDING, FORT SAN PEDRO, ILOILO CITY | Region VI | Region VI | On-Going | ₱28.8M | 95% | High risk79 | Flagged0.022 |
| 23GE0051CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM IN BARANGAY SANTO DOMINGO, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱33.7M | 97% | High risk79 | Flagged0.011 |
| 24GE0003ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) (S00025GR) K0052 + 440 - K0053 + 000 | Region VI | Guimaras DEO | On-Going | ₱33.5M | 100% | High risk79 | Flagged0.004 |
| 17GE0035WIDENING OF BRIDGE-LANGAB BR. (B00005GR) ALONG GUIMARAS CIRCUMFERENTIAL ROAD | Region VI | Guimaras DEO | Completed | ₱23.3M | 100% | High risk77 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00119LGU HOSPITALS-ALTAVAS DISTRICT HOSPITAL, AKLAN | Region VI | Region VI | On-Going | ₱39.7M | 33% | High risk88 | Flagged0.066 |
| 24G00108PHASE II OF THE CONSTRUCTION OF DENR- MINES AND GEOSCIENCES REGION VI OFFICE BUILDING | Region VI | Region VI | On-Going | ₱41.7M | 75% | High risk89 | Flagged0.058 |
| 24G00109CONSTRUCTION OF ACADEMIC BUILDING I, HIMAMAYLAN CAMPUS - WEST VISAYAS STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱19.9M | 71% | High risk88 | Flagged0.054 |
| 24G00067SHARED PROCESSING FACILITY - WHITE COPRA (RBDO WHOLE NUT BUILDING) | Region VI | Region VI | On-Going | ₱37.9M | 96% | High risk88 | Flagged0.052 |
| 24G00092COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS- NABAS SUPER HEALTH CENTER, AKLAN | Region VI | Region VI | On-Going | ₱5.9M | 0% | Medium risk54 | Flagged0.051 |
| 23GE0073REHABILITATION OF PAVED ROAD - IMPROVEMENT OF CONCORDIA-ORACON-BOTCONAWAY ROAD, BARANGAY CONCORDIA, BARANGAY ORACON, AND BARANGAY SAN ANTONIO, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱18.9M | 100% | High risk68 | Flagged0.037 |
| 24G00115CONSTRUCTION OF ACADEMIC BUILDING SIPALAY CAMPUS- CENTRAL PHILIPPINES STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱14.8M | 35% | Medium risk56 | Flagged0.033 |
| 18GE0135CONSTRUCTION OF 2STY2CL, SCIENCE LAB. G.I. ROOF SCHOOL BUILDING, TRINIDAD V. CANJA-STA. TERESA NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.8M | 100% | Medium risk44 | Flagged0.025 |
| 24GE0068CONSTRUCTION OF 2-STOREY 10-CLASSROOM SCHOOL BUILDING IN JORDAN CENTRAL SCHOOL, BARANGAY POBLACION, MUNICIPALITY OF JORDAN, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱39.7M | 95% | High risk63 | Flagged0.024 |
| 25GE0048CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF CROSSING DAVID TO ALUBIHOD ROAD, BARANGAY POBLACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.7M | 70% | High risk95 | Flagged0.022 |
| 22G00039CONSTRUCTION (COMPLETION) OF THREE STOREY DPWH REGIONAL OFFICE VI BUILDING, FORT SAN PEDRO, ILOILO CITY | Region VI | Region VI | On-Going | ₱28.8M | 95% | High risk79 | Flagged0.022 |
| 24GI0123CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX FACILITIES), STA BARBARA CENTRAL ELEMENTARY SCHOOL, STA. BARBARA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱51.8M | 31% | High risk81 | Flagged0.021 |
| 23G00104REPAIR AND REHABILITATION OF THE TWO STOREY BUILDING OF PCA | Region VI | Region VI | On-Going | ₱1.9M | 78% | Low risk27 | Flagged0.021 |
| 24GI0132CONSTRUCTION OF MULTI-PURPOSE BUILDING (CLASSROOM AND AUDITORIUM), PAVIA NATIONAL HIGH SCHOOL, PUROK 1, PAVIA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱93.1M | 53% | High risk83 | Flagged0.020 |
| 24GI0122CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX FACILITIES), PAVIA NATIONAL HIGH SCHOOL, PAVIA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱52M | 32% | High risk81 | Flagged0.020 |
| 22G00024CONSTRUCTION OF PARALLEL BRIDGE - SIBUNAG BR. (B00014GR) ALONG GUIMARAS CIRCUMFERENTIAL RD | Region VI | Region VI | On-Going | ₱105.1M | 71% | High risk61 | Flagged0.019 |
| 24G00098CONSTRUCTION OF NURSING AND ALLIED HEALTH SERVICES ACADEMIC BUILDING (PHASE 3), SAGAY CAMPUS-NORTHERN NEGROS STATE COLLEGE OF SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 34% | Medium risk46 | Flagged0.018 |
| 25GB0075PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - SIBALOM - PISANAN RD - K0107+(-078) - K0109+000, ANTIQUE | Region VI | Antique DEO | On-Going | ₱40.5M | 20% | High risk93 | Flagged0.018 |
| 24GE0048ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0020+490-K0020+740, K0023+654-K0024+000, K0029+859-K0029+1000, K0039+214-K0040+280 | Region VI | Guimaras DEO | On-Going | ₱81.6M | 77% | High risk82 | Flagged0.014 |
| 24G00097CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS ARENA) IN JARO ILOILO CITY | Region VI | Region VI | On-Going | ₱96M | 82% | High risk85 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 25GG0073PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO - CAPIZ (NEW ROUTE) - K0039 + 619 - K0042 + 190 | Region VI | Iloilo 2nd DEO | Completed | ₱91.2M | 100% | Medium risk54 | —-0.076 |
| 77 | 24G00092COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS- NABAS SUPER HEALTH CENTER, AKLAN | Region VI | Region VI | On-Going | ₱5.9M | 0% | Medium risk54 | Flagged0.051 |
| 78 | 19GP0017RECONSTRUCTION TO CONCRETE PAVEMENT - ON SPECIFIC LOCATIONS ALONG CAPIZ-AKLAN RD. (S00298PN) K0324+(-742) TO K0330+580 | Region VI | Capiz 2nd DEO | Completed | ₱84.4M | 100% | Medium risk53 | —-0.073 |
| 79 | 18GP0077REHABILITATION OF PAVED ROAD - CAPIZ - AKLAN RD - K0324+420-K0325+236, K0325+436-K0326+522, K0327+402-K0328+742.84 | Region VI | Capiz 2nd DEO | Completed | ₱72.1M | 100% | Medium risk53 | —-0.078 |
| 80 | 18GP0025ROAD WIDENING - ILOILO - CAPIZ RD. (NEW ROUTE) - K0090+759.5 - K0092+079, K0092+106 - K0092+544 | Region VI | Capiz 2nd DEO | Completed | ₱74.5M | 100% | Medium risk53 | —-0.076 |
| 81 | 20G00023CONSTRUCTION OF PMS-OP INTEGRATED OPERATIONS AND SERVICE CONTINUITY (IOSC) SITE, ILOILO CITY | Region VI | Region VI | Completed | ₱48.2M | 100% | Medium risk53 | —-0.066 |
| 82 | 21G00155CONSTRUCTION OF MULTI-PURPOSE BUILDING (BACOLOD MUSEUM), BRGY. TANGUB, BACOLOD CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱49M | 100% | Medium risk53 | —-0.060 |
| 83 | 25G00021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUAGE RIVER (SECTION 11), JANIUAY, ILOILO | Region VI | Region VI | On-Going | ₱80.1M | 9% | Medium risk52 | —-0.005 |
| 84 | 21GE0089CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF BRGY. CALAYA TO SO. CASILIAN, BRGY. ORACON ROAD, NUEVA VALENCIA AND SIBUNAG, GUIMARAS (STA. 1+420-STA. 4+142, STA. 4+542-STA. 6+410) | Region VI | Guimaras DEO | Completed | ₱76.6M | 100% | Medium risk52 | —-0.078 |
| 85 | 23GF0029CONSTRUCTION OF UP VISAYAS ROAD LEADING TO ACADEMIC INSTITUTIONS, MIAG-AO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱67.5M | 100% | Medium risk52 | —-0.071 |
| 86 | 19GE0003PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ON SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0013+637-K0079+792 | Region VI | Guimaras DEO | Completed | ₱80.2M | 100% | Medium risk52 | —-0.076 |
| 87 | 22GE0036ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL ROAD (S00028GR) K0086+850 - K0088+303 | Region VI | Guimaras DEO | Completed | ₱76.2M | 100% | Medium risk52 | —-0.078 |
| 88 | 23GE0037CONSTRUCTION OF CONCRETE ROAD - LUCMAYAN-SAN ROQUE-LAPAZ ROAD LEADING TO SUBA MALAWIG, TINMAR, UPV MARINE STATION, LA PUERTA, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱57.9M | 100% | Medium risk52 | —-0.082 |
| 89 | 21GE0082CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF ROAD, SO. TOONG, BRGY. CABALAGNAN TO SO. IRAYA, BRGY. SALVACION ROAD, STA. 0+400-STA. 3+300, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱56.3M | 100% | Medium risk52 | —-0.082 |
| 90 | 22GE0027ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL ROAD (S00028GR) K0055+000-K0056+600 | Region VI | Guimaras DEO | Completed | ₱78.4M | 100% | Medium risk52 | —-0.076 |
| 91 | 22GE0019ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) (S00025GR) K0051+(-1127) - K0051+386 | Region VI | Guimaras DEO | Completed | ₱71.4M | 100% | Medium risk52 | —-0.079 |
| 92 | 19GE0015ROAD WIDENING-ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0009+783-K0011+860 | Region VI | Guimaras DEO | Completed | ₱76.1M | 100% | Medium risk52 | —-0.071 |
| 93 | 20GE0096ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) (S0025GR) K0058+392 - K0060+392 | Region VI | Guimaras DEO | Completed | ₱86.4M | 100% | Medium risk52 | —-0.075 |
| 94 | 20GE0092PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-AT SPECIFIC LOCATIONS ALONG GUIMARAS CENTRAL RD, SAN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN (S00025GR) K0051+(-1127)-K0063+780, JORDAN/ SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱80.6M | 100% | Medium risk52 | —-0.076 |
| 95 | 22GE0025PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0002+081 - K0033+360 | Region VI | Guimaras DEO | Completed | ₱74.8M | 100% | Medium risk52 | —-0.079 |
| 96 | 22GE0039CONSTRUCTION OF CONCRETE ROAD - SITIO TALUNGON (TANGAW BRIDGE) - SITIO TUMANDA ROAD ACCESS TO PAYAG PAYAG SA SAN LORENZO, MUNICIPAL HALL, WINDMILL SITE, CABANO RORO WHARF, PASALUBONG CENTER, TUMANDA WHARF AT SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱66.5M | 100% | Medium risk52 | —-0.080 |
| 97 | 18GE0105CONSTRUCTION OF CONCRETE ROAD-SITIO CALOG/BUBOG, CABANO TO SITIO BANTAYAN, AGUILAR ROAD LEADING TO SAN LORENZO WIND FARM, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱67.9M | 100% | Medium risk52 | —-0.080 |
| 98 | 21GE0087CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF SO. LEBAS, BRGY. SAPAL TO BRGY. SEBARIO ROAD, SAN LORENZO, GUIMARAS (STA. 1+530-STA. 2+800, STA. 3+630-STA. 3+816, STA. 5+397-STA. 7+030, STA. 8+792-STA.9+102, STA. 9+462-STA. 9+862) | Region VI | Guimaras DEO | Completed | ₱68M | 100% | Medium risk52 | —-0.080 |
| 99 | 18GE0073ROAD WIDENING-GUIMARAS CIRCUMFERENTIAL RD K0027+209 L/S-K0028+903 L/S, K0027+351 R/S-K0028+903 R/S | Region VI | Guimaras DEO | Completed | ₱61.9M | 100% | Medium risk52 | —-0.081 |
| 100 | 24GM0046PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ASPHALT OVERLAY ALONG KABANKALAN JCT. SALONG-TAPI-DACONGCOGON-BANTAYAN RD. K0106+000 - K0109+000 (WITH EXCEPTION), KABANKALAN CITY, NEGROS OCCIDENTAL. | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱73.5M | 100% | Medium risk51 | —-0.085 |