Contractor dossier
235 projects on file, including joint ventures this contractor is part of.
Total projects
235
Total budget
₱9.9B
Average progress
90.3%
Completion rate
70.6%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
37
15.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 234 | ₱9.8B | 51.5 | 37 | 90.2% |
| Negros Island Region | 1 | ₱73.5M | 51.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 110 | ₱6.1B | 51.6 | 2 | 95.9% |
| Buildings and Facilities | 80 | ₱2B | 43.9 | 14 | 86.5% |
| Bridges | 17 | ₱446.1M | 48.4 | 2 | 97.0% |
| OTHER | 15 | ₱753.6M | 82.9 | 14 | 71.6% |
| Flood Control and Drainage | 4 | ₱193.6M | 48.4 | 0 | 77.3% |
| GAA 2025 SSP | 3 | ₱102M | 94.3 | 3 | 89.0% |
| Bridges, Roads | 2 | ₱184.1M | 57.0 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱11.9M | 34.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱40.5M | 93.0 | 1 | 19.8% |
| GAA 2025 OO-2 | 1 | ₱66.4M | 92.4 | 1 | 21.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GE0046CONSTRUCTION OF CONCRETE ROAD - IMPROVEMENT OF ALAGUISOC-PIÑA ROAD, BARANGAY ALAGUISOC, JORDAN AND BARANGAY PIÑA, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱62.6M | 98% | High risk96 | Flagged0.013 |
| 25GE0048CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF CROSSING DAVID TO ALUBIHOD ROAD, BARANGAY POBLACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.7M | 70% | High risk95 | Flagged0.022 |
| 25GB0075PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - SIBALOM - PISANAN RD - K0107+(-078) - K0109+000, ANTIQUE | Region VI | Antique DEO | On-Going | ₱40.5M | 20% | High risk93 | Flagged0.018 |
| 25GP0020CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAYA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱66.4M | 22% | High risk92 | Flagged0.011 |
| 25GE0019CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF SITIO PAG-ASA-SITIO TOONG-SITIO ILAYA-SITIO LUSONG-JCT. GCR ROAD, BARANGAY CABALAGNAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱9.8M | 99% | High risk92 | Flagged0.011 |
| 24G00108PHASE II OF THE CONSTRUCTION OF DENR- MINES AND GEOSCIENCES REGION VI OFFICE BUILDING | Region VI | Region VI | On-Going | ₱41.7M | 75% | High risk89 | Flagged0.058 |
| 24G00119LGU HOSPITALS-ALTAVAS DISTRICT HOSPITAL, AKLAN | Region VI | Region VI | On-Going | ₱39.7M | 33% | High risk88 | Flagged0.066 |
| 24G00067SHARED PROCESSING FACILITY - WHITE COPRA (RBDO WHOLE NUT BUILDING) | Region VI | Region VI | On-Going | ₱37.9M | 96% | High risk88 | Flagged0.052 |
| 24G00109CONSTRUCTION OF ACADEMIC BUILDING I, HIMAMAYLAN CAMPUS - WEST VISAYAS STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱19.9M | 71% | High risk88 | Flagged0.054 |
| 24G00097CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS ARENA) IN JARO ILOILO CITY | Region VI | Region VI | On-Going | ₱96M | 82% | High risk85 | Flagged0.013 |
| 24GI0132CONSTRUCTION OF MULTI-PURPOSE BUILDING (CLASSROOM AND AUDITORIUM), PAVIA NATIONAL HIGH SCHOOL, PUROK 1, PAVIA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱93.1M | 53% | High risk83 | Flagged0.020 |
| 24G00052CONSTRUCTION OF NEW ILOILO CITY DISTRICT JAIL BUILDING PHASE I, BRGY. BUNTATALA, LEGANES, ILOILO | Region VI | Region VI | On-Going | ₱72.4M | 79% | High risk82 | Flagged0.010 |
| 24GE0048ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0020+490-K0020+740, K0023+654-K0024+000, K0029+859-K0029+1000, K0039+214-K0040+280 | Region VI | Guimaras DEO | On-Going | ₱81.6M | 77% | High risk82 | Flagged0.014 |
| 24GI0123CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX FACILITIES), STA BARBARA CENTRAL ELEMENTARY SCHOOL, STA. BARBARA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱51.8M | 31% | High risk81 | Flagged0.021 |
| 24GI0122CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX FACILITIES), PAVIA NATIONAL HIGH SCHOOL, PAVIA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱52M | 32% | High risk81 | Flagged0.020 |
| 25G00075CONSTRUCTION (COMPLETION) OF THREE STOREY DPWH REGIONAL OFFICE VI BUILDING, FORT SAN PEDRO, ILOILO CITY | Region VI | Region VI | On-Going | ₱48.2M | 52% | High risk81 | Flagged0.010 |
| 22G00039CONSTRUCTION (COMPLETION) OF THREE STOREY DPWH REGIONAL OFFICE VI BUILDING, FORT SAN PEDRO, ILOILO CITY | Region VI | Region VI | On-Going | ₱28.8M | 95% | High risk79 | Flagged0.022 |
| 23GE0051CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM IN BARANGAY SANTO DOMINGO, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱33.7M | 97% | High risk79 | Flagged0.011 |
| 24GE0003ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) (S00025GR) K0052 + 440 - K0053 + 000 | Region VI | Guimaras DEO | On-Going | ₱33.5M | 100% | High risk79 | Flagged0.004 |
| 17GE0035WIDENING OF BRIDGE-LANGAB BR. (B00005GR) ALONG GUIMARAS CIRCUMFERENTIAL ROAD | Region VI | Guimaras DEO | Completed | ₱23.3M | 100% | High risk77 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00119LGU HOSPITALS-ALTAVAS DISTRICT HOSPITAL, AKLAN | Region VI | Region VI | On-Going | ₱39.7M | 33% | High risk88 | Flagged0.066 |
| 24G00108PHASE II OF THE CONSTRUCTION OF DENR- MINES AND GEOSCIENCES REGION VI OFFICE BUILDING | Region VI | Region VI | On-Going | ₱41.7M | 75% | High risk89 | Flagged0.058 |
| 24G00109CONSTRUCTION OF ACADEMIC BUILDING I, HIMAMAYLAN CAMPUS - WEST VISAYAS STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱19.9M | 71% | High risk88 | Flagged0.054 |
| 24G00067SHARED PROCESSING FACILITY - WHITE COPRA (RBDO WHOLE NUT BUILDING) | Region VI | Region VI | On-Going | ₱37.9M | 96% | High risk88 | Flagged0.052 |
| 24G00092COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS- NABAS SUPER HEALTH CENTER, AKLAN | Region VI | Region VI | On-Going | ₱5.9M | 0% | Medium risk54 | Flagged0.051 |
| 23GE0073REHABILITATION OF PAVED ROAD - IMPROVEMENT OF CONCORDIA-ORACON-BOTCONAWAY ROAD, BARANGAY CONCORDIA, BARANGAY ORACON, AND BARANGAY SAN ANTONIO, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱18.9M | 100% | High risk68 | Flagged0.037 |
| 24G00115CONSTRUCTION OF ACADEMIC BUILDING SIPALAY CAMPUS- CENTRAL PHILIPPINES STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱14.8M | 35% | Medium risk56 | Flagged0.033 |
| 18GE0135CONSTRUCTION OF 2STY2CL, SCIENCE LAB. G.I. ROOF SCHOOL BUILDING, TRINIDAD V. CANJA-STA. TERESA NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.8M | 100% | Medium risk44 | Flagged0.025 |
| 24GE0068CONSTRUCTION OF 2-STOREY 10-CLASSROOM SCHOOL BUILDING IN JORDAN CENTRAL SCHOOL, BARANGAY POBLACION, MUNICIPALITY OF JORDAN, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱39.7M | 95% | High risk63 | Flagged0.024 |
| 25GE0048CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF CROSSING DAVID TO ALUBIHOD ROAD, BARANGAY POBLACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.7M | 70% | High risk95 | Flagged0.022 |
| 22G00039CONSTRUCTION (COMPLETION) OF THREE STOREY DPWH REGIONAL OFFICE VI BUILDING, FORT SAN PEDRO, ILOILO CITY | Region VI | Region VI | On-Going | ₱28.8M | 95% | High risk79 | Flagged0.022 |
| 24GI0123CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX FACILITIES), STA BARBARA CENTRAL ELEMENTARY SCHOOL, STA. BARBARA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱51.8M | 31% | High risk81 | Flagged0.021 |
| 23G00104REPAIR AND REHABILITATION OF THE TWO STOREY BUILDING OF PCA | Region VI | Region VI | On-Going | ₱1.9M | 78% | Low risk27 | Flagged0.021 |
| 24GI0132CONSTRUCTION OF MULTI-PURPOSE BUILDING (CLASSROOM AND AUDITORIUM), PAVIA NATIONAL HIGH SCHOOL, PUROK 1, PAVIA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱93.1M | 53% | High risk83 | Flagged0.020 |
| 24GI0122CONSTRUCTION OF MULTI-PURPOSE FACILITY (SPORTS COMPLEX FACILITIES), PAVIA NATIONAL HIGH SCHOOL, PAVIA, ILOILO | Region VI | Iloilo 4th DEO | On-Going | ₱52M | 32% | High risk81 | Flagged0.020 |
| 22G00024CONSTRUCTION OF PARALLEL BRIDGE - SIBUNAG BR. (B00014GR) ALONG GUIMARAS CIRCUMFERENTIAL RD | Region VI | Region VI | On-Going | ₱105.1M | 71% | High risk61 | Flagged0.019 |
| 24G00098CONSTRUCTION OF NURSING AND ALLIED HEALTH SERVICES ACADEMIC BUILDING (PHASE 3), SAGAY CAMPUS-NORTHERN NEGROS STATE COLLEGE OF SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 34% | Medium risk46 | Flagged0.018 |
| 25GB0075PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - SIBALOM - PISANAN RD - K0107+(-078) - K0109+000, ANTIQUE | Region VI | Antique DEO | On-Going | ₱40.5M | 20% | High risk93 | Flagged0.018 |
| 24GE0048ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0020+490-K0020+740, K0023+654-K0024+000, K0029+859-K0029+1000, K0039+214-K0040+280 | Region VI | Guimaras DEO | On-Going | ₱81.6M | 77% | High risk82 | Flagged0.014 |
| 24G00097CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS ARENA) IN JARO ILOILO CITY | Region VI | Region VI | On-Going | ₱96M | 82% | High risk85 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20GP0050CONCRETING OF ROAD, BARANGAY ANGUB, CUARTERO TO BRGY. SANTA MONICA, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱48.5M | 100% | Medium risk50 | —-0.076 |
| 102 | 23GE0032ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) (S00025GR) K0051+386 - K0052+440 | Region VI | Guimaras DEO | Completed | ₱54.7M | 100% | Medium risk50 | —-0.081 |
| 103 | 24GB0051ILOILO-ANTIQUE RD-K0088+240-K0089+024, K0089+107-K0089+420, ANTIQUE | Region VI | Antique DEO | On-Going | ₱52M | 85% | Medium risk50 | —-0.039 |
| 104 | 18GP0013CONSTRUCTION OF CONCRETE ROAD - SITIO LOMBOY, BRGY. LINAMBASA TO BRGY. GANZON, BRGY. JAENA AND BRGY. SAN JUAN TO NATIONAL HIGHWAY IN SUPPORT OF ABACA INDUSTRY, JAMINDAN, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱47M | 100% | Medium risk50 | —-0.082 |
| 105 | 18GP0007CONSTRUCTION OF CONCRETE ROAD - SITIO LABANG, BRGY. STA. CARMEN TO SITIO DALAHI, BRGY. SAN RAFAEL CO | Region VI | Capiz 2nd DEO | Completed | ₱47M | 100% | Medium risk50 | —-0.082 |
| 106 | 20G00105CONSTRUCTION OF PERMANENT EVACUATION CENTER/MULTI-PURPOSE COVERED COURT (STANDARD) | Region VI | Region VI | On-Going | ₱37.9M | 86% | Medium risk50 | —-0.009 |
| 107 | 21G00132CONSTRUCTION OF PMS-OP INTEGRATED OPERATIONS AND SERVICE CONTINUITY (IOSC) SITE, (PHASE 2), ILOILO CITY | Region VI | Region VI | Completed | ₱38.6M | 100% | Medium risk50 | —-0.079 |
| 108 | 25GE0040CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVENTION CENTER AND ARENA), JORDAN, GUIMARAS (PHASE 3) | Region VI | Guimaras DEO | On-Going | ₱40M | 2% | Medium risk50 | —-0.013 |
| 109 | 24GE0026CONSTRUCTION OF OTHER BUILDING - CONSTRUCTION OF DPWH GUIMARAS DISTRICT ENGINEERING OFFICE EXTENSION BUILDING, SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱39.1M | 100% | Medium risk50 | —-0.041 |
| 110 | 23GG0222CONSTRUCTION OF MULTI - PURPOSE FACILITY (PUBLIC MARKET), BRGY. POBLACION ILAYA, SAN ENRIQUE, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱39.6M | 100% | Medium risk50 | —-0.072 |
| 111 | 20GP0051CONCRETING OF ROAD, BARANGAY DURAN TO BRGY. MALUDLUD, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.076 |
| 112 | 19GE0081CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD-ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0091+055-K0099+891 | Region VI | Guimaras DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.083 |
| 113 | 20G00109CONSTRUCTION OF PERMANENT EVACUATION CENTER/ MULTI-PURPOSE COVERED COURT (STANDARD) | Region VI | Region VI | Completed | ₱38.1M | 100% | Medium risk49 | —-0.076 |
| 114 | 25GE0024PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0000+(-114) - K0006+799, (S00029GR) K0000+(-449) - K0000+(-020) | Region VI | Guimaras DEO | On-Going | ₱49.7M | 89% | Medium risk49 | —-0.051 |
| 115 | 20GE0055CONSTRUCTION OF CONCRETE ROAD-SITIO CALOG/BUBOG, CABANO TO SITIO BANTAYAN, AGUILAR ROAD LEADING TO SAN LORENZO WIND FARM, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱50.4M | 100% | Medium risk49 | —-0.082 |
| 116 | 21G00165CONSTRUCTION OF EVACUATION CENTER, BRGY.CUBAY, LA CARLOTA CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱34.7M | 80% | Medium risk49 | —-0.014 |
| 117 | 21G00167CONSTRUCTION OF EVACUATION CENTER, BRGY. SO-OC, AREVALO, ILOILO CITY | Region VI | Region VI | On-Going | ₱34.4M | 93% | Medium risk49 | —-0.018 |
| 118 | 21G00166CONSTRUCTION OF EVACUATION CENTER, LEON, ILOILO | Region VI | Region VI | Completed | ₱34.7M | 100% | Medium risk49 | —-0.080 |
| 119 | 23GE0022CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (PHASE II) OF MULTI-PURPOSE BUILDING, BARANGAY SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱34.3M | 100% | Medium risk49 | —-0.080 |
| 120 | 19G00090CONSTRUCTION OF PERMANENT EVACUATION CENTER/ MULTI-PURPOSE COVERED COURT (STANDARD) | Region VI | Region VI | On-Going | ₱34.5M | 96% | Medium risk49 | —-0.009 |
| 121 | 19G00080CONSTRUCTION OF PERMANENT EVACUATION CENTER/MULTI-PURPOSE COVERED COURT | Region VI | Region VI | Completed | ₱34.6M | 100% | Medium risk49 | —-0.075 |
| 122 | 18G00098PROPOSED THREE (3) STOREY WITH ROOFDECK DISTRICT OFFICE MAIN BUILDING NATIONAL BUREAU OF INVESTIGATION-PHASE 1 | Region VI | Region VI | Completed | ₱49.4M | 100% | Medium risk49 | —-0.015 |
| 123 | 18GF0123CONSTRUCTION OF MULTI- PURPOSE BUILDING (CLASSROOM), UP VISAYAS ILOILO HIGH SCHOOL, MIAGAO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱25.1M | 100% | Medium risk48 | —-0.075 |
| 124 | 21GE0098CONSTRUCTION OF CONCRETE ROAD - SITIO CALOG/BUBOG, CABANO TO SITIO BANTAYAN, AGUILAR ROAD LEADING TO SAN LORENZO WIND FARM, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱40.7M | 100% | Medium risk47 | —-0.071 |
| 125 | 18GF0119CONSTRUCTION OF 4-STOREY 16-CLASSROOM (ICT & SCIENCE LAB. SCHOOL BUILDING) AT DON FELIX SERRA NATIONAL HIGH SCHOOL, SAN JOAQUIN, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱42.1M | 100% | Medium risk47 | —-0.016 |