Contractor dossier
29 projects on file, including joint ventures this contractor is part of.
Total projects
29
Total budget
₱449.1M
Average progress
75.3%
Completion rate
44.8%
Below 70%
Average risk score
60.6
High risk on average, out of 100
Flagged as unusual
8
27.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 29 | ₱449.1M | 60.6 | 8 | 75.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 6 | ₱58.7M | 50.3 | 2 | 54.1% |
| Flood Control and Drainage | 6 | ₱125M | 46.6 | 0 | 98.5% |
| OTHER | 4 | ₱54.5M | 74.8 | 1 | 97.5% |
| GAA 2025 OO-2 | 3 | ₱88.1M | 87.8 | 0 | 78.3% |
| Roads | 3 | ₱66.1M | 42.0 | 0 | 88.4% |
| GAA 2025 SSP | 2 | ₱19.5M | 95.2 | 2 | 55.4% |
| GAA 2025 OO-1 | 2 | ₱18.2M | 89.2 | 2 | 28.6% |
| Water Provision and Storage | 2 | ₱8.6M | 35.5 | 1 | 55.0% |
| Bridges | 1 | ₱10.3M | 48.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BA0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURE PROTECTING INFRASTRUCTURE/ FACILITIES: CONSTRUCTION OF SEAWALL, BRGY. SAVIDUG, SABTANG, BATANES | Region II | Batanes DEO | On-Going | ₱9.9M | 41% | High risk95 | Flagged0.030 |
| 25BA0044CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES; CONSTRUCTION OF BRIDGE (WITH RETAINING WALL), MABINI STREET, BRGY. SAN ANTONIO, BASCO, BATANES | Region II | Batanes DEO | On-Going | ₱9.6M | 70% | High risk95 | Flagged0.021 |
| 25BA0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: CONSTRUCTION OF NEW BRIDGES: VUYUAN BRIDGE ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD | Region II | Batanes DEO | On-Going | ₱10.8M | 14% | High risk90 | Flagged0.020 |
| 25BA0015ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS- FLOOD MANAGEMENT PROGRAM:CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF GUARDWALL ALONG AIRPORT-MAUYEN PORT ROAD, ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 81% | High risk90 | —-0.003 |
| 25BA0003ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS- TERTIARY ROADS:SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA- NAKANMUAN ROAD -K0005+871.20-K0006+022.00 | Region II | Batanes DEO | On-Going | ₱7.4M | 43% | High risk88 | Flagged0.010 |
| 25BA0040OO2: PROTECT LIVES AND PROPERTIES AGAINST: MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DICHOD SECTION, BARANGAY KAYUGANAN, UYUGAN, BATANES | Region II | Batanes DEO | On-Going | ₱19.6M | 81% | High risk87 | —-0.004 |
| 25BA0017ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION OF SHORE PROTECTION STRUCTURE ALONG SAN VICENTE - SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, BARANGAY SUMNANGA, SABTANG, BATANES | Region II | Batanes DEO | On-Going | ₱19.6M | 73% | High risk87 | —-0.001 |
| 24BA0022MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI - PURPOSE BUILDING (BATANES STATE COLLEGE - AMPHITHEATRE) PHASE III, BRGY. SAN ANTONIO, BASCO, BATANES | Region II | Batanes DEO | On-Going | ₱10.9M | 90% | High risk76 | Flagged0.014 |
| 23BA0017ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION OF GUARDWALL ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, SABTANG, BATANES- K0018+000-K0018+029 | Region II | Batanes DEO | Completed | ₱9.8M | 100% | High risk75 | —-0.021 |
| 24BA0016ORGANIZATIONAL OUTCOME 1: NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - BASCO-MAHATAO-IVANA-UYUGAN-IMNAJBU RD - K0006+222 - K0006+350, K0016+115-K0016+305 | Region II | Batanes DEO | Completed | ₱9.8M | 100% | High risk74 | —-0.013 |
| 23BA0031FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVERS BASINS AND PRINCIPAL RIVERS; CONSTRUCTION OF GUARDWALL (ALONG BASCO- MAHATAO- IVANA-UYUGAN- IMNAJBU ROAD), BASCO, BATANES | Region II | Batanes DEO | Completed | ₱24.1M | 100% | High risk74 | —-0.019 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BA0063CONSTRUCTION OF 1 - STOREY 3- CLASSROOM SCHOOL BUILDING IN ITBAYAT NATIONAL AGRICULTURAL HIGH SCHOOL (INAHS) PHASE II, ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱14.9M | 0% | Medium risk50 | Flagged0.035 |
| 25BA0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURE PROTECTING INFRASTRUCTURE/ FACILITIES: CONSTRUCTION OF SEAWALL, BRGY. SAVIDUG, SABTANG, BATANES | Region II | Batanes DEO | On-Going | ₱9.9M | 41% | High risk95 | Flagged0.030 |
| 23BA0055CONSTRUCTION OF CLASSROOMS - ITBAYAT NATIONAL AGRICULTURAL HIGH SCHOOL (INAHS), ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱13.9M | 69% | Medium risk49 | Flagged0.022 |
| 25BA0044CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES; CONSTRUCTION OF BRIDGE (WITH RETAINING WALL), MABINI STREET, BRGY. SAN ANTONIO, BASCO, BATANES | Region II | Batanes DEO | On-Going | ₱9.6M | 70% | High risk95 | Flagged0.021 |
| 25BA0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: CONSTRUCTION OF NEW BRIDGES: VUYUAN BRIDGE ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD | Region II | Batanes DEO | On-Going | ₱10.8M | 14% | High risk90 | Flagged0.020 |
| 24BA0022MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI - PURPOSE BUILDING (BATANES STATE COLLEGE - AMPHITHEATRE) PHASE III, BRGY. SAN ANTONIO, BASCO, BATANES | Region II | Batanes DEO | On-Going | ₱10.9M | 90% | High risk76 | Flagged0.014 |
| 25BA0003ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS- TERTIARY ROADS:SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA- NAKANMUAN ROAD -K0005+871.20-K0006+022.00 | Region II | Batanes DEO | On-Going | ₱7.4M | 43% | High risk88 | Flagged0.010 |
| 25BA0030BIP- PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF WATER SUPPLY SYSTEM (LEVEL I), BARANGAY RADIWAN, IVANA, BATANES | Region II | Batanes DEO | On-Going | ₱5.8M | 10% | Medium risk47 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25BA0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURE PROTECTING INFRASTRUCTURE/ FACILITIES: CONSTRUCTION OF SEAWALL, BRGY. SAVIDUG, SABTANG, BATANES | Region II | Batanes DEO | On-Going | ₱9.9M | 41% | High risk95 | Flagged0.030 |
| 2 | 25BA0044CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES; CONSTRUCTION OF BRIDGE (WITH RETAINING WALL), MABINI STREET, BRGY. SAN ANTONIO, BASCO, BATANES | Region II | Batanes DEO | On-Going | ₱9.6M | 70% | High risk95 | Flagged0.021 |
| 3 | 25BA0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: CONSTRUCTION OF NEW BRIDGES: VUYUAN BRIDGE ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD | Region II | Batanes DEO | On-Going | ₱10.8M | 14% | High risk90 | Flagged0.020 |
| 4 | 25BA0015ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS- FLOOD MANAGEMENT PROGRAM:CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF GUARDWALL ALONG AIRPORT-MAUYEN PORT ROAD, ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 81% | High risk90 | —-0.003 |
| 5 | 25BA0003ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS- TERTIARY ROADS:SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA- NAKANMUAN ROAD -K0005+871.20-K0006+022.00 | Region II | Batanes DEO | On-Going | ₱7.4M | 43% | High risk88 | Flagged0.010 |
| 6 | 25BA0040OO2: PROTECT LIVES AND PROPERTIES AGAINST: MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DICHOD SECTION, BARANGAY KAYUGANAN, UYUGAN, BATANES | Region II | Batanes DEO | On-Going | ₱19.6M | 81% | High risk87 | —-0.004 |
| 7 | 25BA0017ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION OF SHORE PROTECTION STRUCTURE ALONG SAN VICENTE - SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, BARANGAY SUMNANGA, SABTANG, BATANES | Region II | Batanes DEO | On-Going | ₱19.6M | 73% | High risk87 | —-0.001 |
| 8 | 24BA0022MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI - PURPOSE BUILDING (BATANES STATE COLLEGE - AMPHITHEATRE) PHASE III, BRGY. SAN ANTONIO, BASCO, BATANES | Region II | Batanes DEO | On-Going | ₱10.9M | 90% | High risk76 | Flagged0.014 |
| 9 | 23BA0017ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION OF GUARDWALL ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, SABTANG, BATANES- K0018+000-K0018+029 | Region II | Batanes DEO | Completed | ₱9.8M | 100% | High risk75 | —-0.021 |
| 10 | 24BA0016ORGANIZATIONAL OUTCOME 1: NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - BASCO-MAHATAO-IVANA-UYUGAN-IMNAJBU RD - K0006+222 - K0006+350, K0016+115-K0016+305 | Region II | Batanes DEO | Completed | ₱9.8M | 100% | High risk74 | —-0.013 |
| 11 | 23BA0031FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVERS BASINS AND PRINCIPAL RIVERS; CONSTRUCTION OF GUARDWALL (ALONG BASCO- MAHATAO- IVANA-UYUGAN- IMNAJBU ROAD), BASCO, BATANES | Region II | Batanes DEO | Completed | ₱24.1M | 100% | High risk74 | —-0.019 |
| 12 | 25BA0062CSSP: BIP- MULTIPURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTI-PURPOSE BUILDING(IVANA ELEMENTARY SCHOOL COVERED COURT),PHASE I, BRGY. RADIWAN, IVANA, BATANES | Region II | Batanes DEO | On-Going | ₱8.2M | 55% | Medium risk52 | —-0.028 |
| 13 | 25BA0022CSSP: BIP- MULTIPURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION OF MULTIPURPOSE BUILDING (BARANGAY HALL) PHASE I, BARANGAY RAELE, ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱6.9M | 0% | Medium risk52 | —-0.011 |
| 14 | 24BA0015MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN ANTONIO, BASCO, BATANES | Region II | Batanes DEO | Completed | ₱9.9M | 100% | Medium risk50 | —-0.071 |
| 15 | 24BA0063CONSTRUCTION OF 1 - STOREY 3- CLASSROOM SCHOOL BUILDING IN ITBAYAT NATIONAL AGRICULTURAL HIGH SCHOOL (INAHS) PHASE II, ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱14.9M | 0% | Medium risk50 | Flagged0.035 |
| 16 | 24BA0004MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), PHASE II, BARANGAY RADIWAN, IVANA, BATANES | Region II | Batanes DEO | Completed | ₱4.9M | 100% | Medium risk49 | —-0.075 |
| 17 | 23BA0055CONSTRUCTION OF CLASSROOMS - ITBAYAT NATIONAL AGRICULTURAL HIGH SCHOOL (INAHS), ITBAYAT, BATANES | Region II | Batanes DEO | On-Going | ₱13.9M | 69% | Medium risk49 | Flagged0.022 |
| 18 | 24BA0006BRIDGE PROGRAM: CONSTRUCTION OF NEW PERMANENT BRIDGES; CONSTRUCTION OF BUTAN BRIDGE, ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD (S00003ST) K0015+410 | Region II | Batanes DEO | Completed | ₱10.3M | 100% | Medium risk48 | —-0.034 |
| 19 | 24BA0025ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SEA WALL AT IVANA SHELTER PORT, IVANA, BATANES | Region II | Batanes DEO | On-Going | ₱39.2M | 99% | Medium risk48 | —-0.027 |
| 20 | 24BA0037OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM; CONSTRUCTION OF GUARDWALL ALONG SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN RD, SABTANG, BATANES | Region II | Batanes DEO | On-Going | ₱35.3M | 92% | Medium risk47 | —-0.024 |
| 21 | 25BA0030BIP- PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF WATER SUPPLY SYSTEM (LEVEL I), BARANGAY RADIWAN, IVANA, BATANES | Region II | Batanes DEO | On-Going | ₱5.8M | 10% | Medium risk47 | Flagged0.004 |
| 22 | 24BA0011ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS;FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BARANGAY KAYUGANAN SEAWALL, UYUGAN, BATANES | Region II | Batanes DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.060 |
| 23 | 24BA0017OO2 PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS; FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF UYUGAN FLOOD CONTROL (VALUGAN SECTION) PHASE 2, UYUGAN, BATANES | Region II | Batanes DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.060 |
| 24 | 24BA0010OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS;FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF SUMNANGA SEAWALL, SABTANG, BATANES | Region II | Batanes DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.058 |
| 25 | 23BA0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: CONSTRUCTION OF NAKANMUAN SEAWALL, BARANGAY NAKANMUAN, SABTANG, BATANES | Region II | Batanes DEO | Completed | ₱21.2M | 100% | Medium risk46 | —-0.059 |