Opening the dossier…
Opening the dossier…
Contractor dossier
99 projects on file, including joint ventures this contractor is part of.
Total projects
99
Total budget
₱4.1B
Average progress
99.0%
Completion rate
91.9%
Average risk score
31.7
Medium risk on average, out of 100
Flagged as unusual
3
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 99 | ₱4.1B | 31.7 | 3 | 99.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 33 | ₱2.2B | 36.4 | 0 | 100.0% |
| Roads | 32 | ₱1.3B | 29.5 | 0 | 99.0% |
| Buildings and Facilities | 27 | ₱286.1M | 15.3 | 0 | 100.0% |
| OTHER | 3 | ₱58.1M | 76.5 | 1 | 89.6% |
| GAA 2025 OO-2 | 2 | ₱201.1M | 90.2 | 1 | 85.2% |
| GAA 2025 SSP | 1 | ₱96M | 94.2 | 1 | 93.8% |
| GAA 2025 OO-1 | 1 | ₱11.4M | 75.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25M00018CONSTRUCTION OF LADOL FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI | Region XII | Region XII | On-Going | ₱96M | 94% | High risk94 | Flagged0.029 |
| 25M00186CONSTRUCTION OF CONCRETE REVETMENT, (UPSTREAM OF SOUTH POLOMOLOK BR.) PHASE II, STA 0+000 - STA 0+380 (RIGHT BANK); STA 0+000 - STA 0+220 (LEFT BANK), POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 100% | High risk91 | —-0.008 |
| 25M00177CONSTRUCTION OF CONCRETE REVETMENT, LOWER KLINAN-MABUHAY (SILWAY RIVER BASIN) PHASE II, STA. 0+000 - STA. 0+610, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱107.6M | 70% | High risk89 | Flagged0.006 |
| 25MB0135CONSTRUCTION OF SCHOOL BUILDING, PALKAN ELEMENTARY SCHOOL, BRGY. PALKAN, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.9M | 69% | High risk86 | Flagged0.052 |
| 25MB0003CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MAKAR - KIAMBA RD - K1663 + 998 - K1664 + 219 | Region XII | South Cotabato 1st DEO | Completed | ₱11.4M | 100% | High risk76 | —-0.026 |
| 24M00217REPLACEMENT OF BRIDGE - SALDUA BRIDGE IN POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | Completed | ₱48.2M | 100% | High risk75 | —-0.030 |
| 23MB0083CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, CITY HEIGHTS, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | High risk68 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MB0135CONSTRUCTION OF SCHOOL BUILDING, PALKAN ELEMENTARY SCHOOL, BRGY. PALKAN, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.9M | 69% | High risk86 | Flagged0.052 |
| 25M00018CONSTRUCTION OF LADOL FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI | Region XII | Region XII | On-Going | ₱96M | 94% | High risk94 | Flagged0.029 |
| 25M00177CONSTRUCTION OF CONCRETE REVETMENT, LOWER KLINAN-MABUHAY (SILWAY RIVER BASIN) PHASE II, STA. 0+000 - STA. 0+610, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱107.6M | 70% | High risk89 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25M00018CONSTRUCTION OF LADOL FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI | Region XII | Region XII | On-Going | ₱96M | 94% | High risk94 | Flagged0.029 |
| 2 | 25M00186CONSTRUCTION OF CONCRETE REVETMENT, (UPSTREAM OF SOUTH POLOMOLOK BR.) PHASE II, STA 0+000 - STA 0+380 (RIGHT BANK); STA 0+000 - STA 0+220 (LEFT BANK), POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 100% | High risk91 | —-0.008 |
| 3 | 25M00177CONSTRUCTION OF CONCRETE REVETMENT, LOWER KLINAN-MABUHAY (SILWAY RIVER BASIN) PHASE II, STA. 0+000 - STA. 0+610, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱107.6M | 70% | High risk89 | Flagged0.006 |
| 4 | 25MB0135CONSTRUCTION OF SCHOOL BUILDING, PALKAN ELEMENTARY SCHOOL, BRGY. PALKAN, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.9M | 69% | High risk86 | Flagged0.052 |
| 5 | 25MB0003CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MAKAR - KIAMBA RD - K1663 + 998 - K1664 + 219 | Region XII | South Cotabato 1st DEO | Completed | ₱11.4M | 100% | High risk76 | —-0.026 |
| 6 | 24M00217REPLACEMENT OF BRIDGE - SALDUA BRIDGE IN POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | Completed | ₱48.2M | 100% | High risk75 | —-0.030 |
| 7 | 23MB0083CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, CITY HEIGHTS, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | High risk68 | —-0.027 |
| 8 | 18MB0008CONSTRUCTION OF FLOOD CONTROL/ CONCRETE REVETMENT ALONG SILWAY RIVER, P.I. 16, BRGY. CITY HEIGHTS, GENERAL SANTOS NCITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱49M | 100% | Medium risk54 | —-0.043 |
| 9 | 24M00162CONSTRUCTION OF CONCRETE REVETMENT, DOWNSTREAM OF SINAWAL BRIDGE, SINAWAL RIVER, STA 0+000 - STA 0+630, BARANGAY LABANGAL, GENERAL SANTOS CITY | Region XII | Region XII | Completed | ₱120.6M | 100% | Medium risk52 | —-0.053 |
| 10 | 24M00123CONSTRUCTION OF CONCRETE REVETMENT, LOWER KLINAN-MABUHAY (SILWAY RIVER BASIN), POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | Completed | ₱121.5M | 100% | Medium risk52 | —-0.053 |
| 11 | 24M00219CONSTRUCTION OF RIVER BANK PROTECTION, LUSANES, STA 0+000-STA 0+745, BRGY. SULIT, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | Completed | ₱120.6M | 100% | Medium risk50 | —-0.057 |
| 12 | 17MB0022CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES AT UPPER MAKAR BRIDGE I ALONG MAKAR RIVER, STA. 0+000-STA. 0+488, GENERAL SANTOS CITY, SOUTH COTABATO 1ST LD | Region XII | South Cotabato 1st DEO | Completed | ₱41M | 100% | Medium risk48 | —-0.044 |
| 13 | 18MB0020CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SILWAY RIVER BANK PROTECTION, STA. 0+000-STA. 0+320, BRGY. LABANGAL & BRGY. DADIANGAS NORTH, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.043 |
| 14 | 24M00224CONSTRUCTION OF CONCRETE REVETMENT ALONG SILWAY RIVER, STA 0+79.47 - STA 0+650, BARANGAY APOPONG, GENERAL SANTOS CITY | Region XII | Region XII | Completed | ₱96.4M | 100% | Medium risk46 | —-0.056 |
| 15 | 24M00111CONSTRUCTION OF BADTASAN RIVER FLOOD CONTROL, STA. 0+000 - STA. 0+540.37, KIAMBA, SARANGANI | Region XII | Region XII | Completed | ₱99M | 100% | Medium risk46 | —-0.055 |
| 16 | 22MB0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LOWER KLINAN - MABUHAY (SILWAY RIVER BASIN), STA. 0+000 - STA. 0+694, BRGY. MABUHAY, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱96.5M | 100% | Medium risk46 | —-0.058 |
| 17 | 23M00045CONSTRUCTION OF DAAN SUYAN-LUN PADIDU RIVER CONTROL, PACKAGE A, STA. 0+000 - STA. 0+720.947, MALAPATAN, SARANGANI | Region XII | Region XII | Completed | ₱96.5M | 100% | Medium risk45 | —-0.055 |
| 18 | 24ME0070CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARANGAY MARIBULAN, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱96.4M | 100% | Medium risk45 | —-0.056 |
| 19 | 24ME0003CONSTRUCTION OF LATIAN FLOOD CONTROL, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱96.5M | 100% | Medium risk44 | —-0.055 |
| 20 | 23M00173CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA. 46+986 - STA. 47+141.65, STA. 48+749 - STA. 48+769.24, STA. 49+602 - STA. 49+665.28, BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION), TUPI, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱96.5M | 100% | Medium risk44 | —-0.037 |
| 21 | 24ME0080CONSTRUCTION OF LUN MASLA RIVER (UPSTREAM) FLOOD CONTROL, MALAPATAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱96.5M | 100% | Medium risk43 | —-0.052 |
| 22 | 22M00054CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, K1665+040.000-K1665+120.000, K1665+234.000-K1665+267.000, K1665+460.000-K1665+505.000, K1665+673.000-K1665+710.000, K1666+370.000-K1666+440.000, K1666+490.000-K1666+540.000 | Region XII | Region XII | Completed | ₱106.1M | 100% | Medium risk43 | —-0.070 |
| 23 | 23MB0109CONCRETING OF JCT. NHW CROSSING REPOLYO, BARANGAY LAMCALIAF - BARANGAY KINILIS ROAD, MUNICIPALITY OF POLOMOLOK | Region XII | South Cotabato 1st DEO | Completed | ₱95.5M | 100% | Medium risk42 | —-0.076 |
| 24 | 22MB0024CONSTRUCTION OF REVETMENT ALONG TINAGACAN-BUAYAN RIVER (PHASE 3), BRGY. TINAGACAN, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱91.6M | 100% | Medium risk38 | —-0.056 |
| 25 | 18MB0039COMPLETION OF DPWH SOUTH COTABATO 2ND DISTRICT ENGINEERING OFFICE BUILDING, BARANGAY LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱21.2M | 100% | Medium risk37 | —-0.049 |