Opening the dossier…
Opening the dossier…
Contractor dossier
99 projects on file, including joint ventures this contractor is part of.
Total projects
99
Total budget
₱4.1B
Average progress
99.0%
Completion rate
91.9%
Average risk score
31.7
Medium risk on average, out of 100
Flagged as unusual
3
3.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 99 | ₱4.1B | 31.7 | 3 | 99.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 33 | ₱2.2B | 36.4 | 0 | 100.0% |
| Roads | 32 | ₱1.3B | 29.5 | 0 | 99.0% |
| Buildings and Facilities | 27 | ₱286.1M | 15.3 | 0 | 100.0% |
| OTHER | 3 | ₱58.1M | 76.5 | 1 | 89.6% |
| GAA 2025 OO-2 | 2 | ₱201.1M | 90.2 | 1 | 85.2% |
| GAA 2025 SSP | 1 | ₱96M | 94.2 | 1 | 93.8% |
| GAA 2025 OO-1 | 1 | ₱11.4M | 75.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25M00018CONSTRUCTION OF LADOL FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI | Region XII | Region XII | On-Going | ₱96M | 94% | High risk94 | Flagged0.029 |
| 25M00186CONSTRUCTION OF CONCRETE REVETMENT, (UPSTREAM OF SOUTH POLOMOLOK BR.) PHASE II, STA 0+000 - STA 0+380 (RIGHT BANK); STA 0+000 - STA 0+220 (LEFT BANK), POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱93.6M | 100% | High risk91 | —-0.008 |
| 25M00177CONSTRUCTION OF CONCRETE REVETMENT, LOWER KLINAN-MABUHAY (SILWAY RIVER BASIN) PHASE II, STA. 0+000 - STA. 0+610, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱107.6M | 70% | High risk89 | Flagged0.006 |
| 25MB0135CONSTRUCTION OF SCHOOL BUILDING, PALKAN ELEMENTARY SCHOOL, BRGY. PALKAN, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.9M | 69% | High risk86 | Flagged0.052 |
| 25MB0003CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MAKAR - KIAMBA RD - K1663 + 998 - K1664 + 219 | Region XII | South Cotabato 1st DEO | Completed | ₱11.4M | 100% | High risk76 | —-0.026 |
| 24M00217REPLACEMENT OF BRIDGE - SALDUA BRIDGE IN POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | Completed | ₱48.2M | 100% | High risk75 | —-0.030 |
| 23MB0083CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, CITY HEIGHTS, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | High risk68 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MB0135CONSTRUCTION OF SCHOOL BUILDING, PALKAN ELEMENTARY SCHOOL, BRGY. PALKAN, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | On-Going | ₱4.9M | 69% | High risk86 | Flagged0.052 |
| 25M00018CONSTRUCTION OF LADOL FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI | Region XII | Region XII | On-Going | ₱96M | 94% | High risk94 | Flagged0.029 |
| 25M00177CONSTRUCTION OF CONCRETE REVETMENT, LOWER KLINAN-MABUHAY (SILWAY RIVER BASIN) PHASE II, STA. 0+000 - STA. 0+610, POLOMOLOK, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱107.6M | 70% | High risk89 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 19MB0024CONSTRUCTION/REHABILITAION OF FLOOD MITIGATION FACILITIES AT MAKAR BRIDGE-I, ALONG MAKAR RIVER STA. 0+000 - STA.0+444 (LEFTSIDE RIVER BANK, UPSTREAM), GENERAL SANTOS CITY SOUTH COTABATO 1ST LD | Region XII | South Cotabato 1st DEO | Completed | ₱49M | 100% | Low risk27 | —-0.067 |
| 52 | 21ME0038CONSTRUCTION OF DATAL TAMPAL FLOOD CONTROL ALONG BUAYAN-MALUNGON RIVER BASIN; MALUNGON, SARANGANNI PROVINCE | Region XII | Sarangani DEO | Completed | ₱49M | 100% | Low risk27 | —-0.070 |
| 53 | 20ME0061REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1754+871-K1756+000; KIAMBA, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱18.8M | 100% | Low risk27 | —-0.085 |
| 54 | 20MB0019CONSTRUCTION OF FLOOD CONTROL/CONCRETE REVETMENT ALONG SILWAY RIVER P.I. 16, BRGY. CITY HEIGHTS, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱39.2M | 100% | Low risk26 | —-0.068 |
| 55 | 20MB0094ROAD CONCRETING AT PUROK 5 FROM R. BUENAFE RESIDENCE TO BARANGAY BUAYAN BOUNDARY, BRGY. LIGAYA, GENERAL SANOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱19.6M | 100% | Low risk26 | —-0.085 |
| 56 | 22MB0085CONSTRUCTION OF ROAD WITH DRAINAGE FROM FIL-AM AVENUE TO SATELITE PUBLIC MARKET, BRGY. FATIMA, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱7.8M | 100% | Low risk26 | —-0.084 |
| 57 | 22ME0002CONSTRUCTION OF ROAD, SITIO SIGUEL TO SITIO LAMLANGIL, BRGY. TINOTO, MAASIM, SARANGANI, PROVINCE | Region XII | Sarangani DEO | Completed | ₱43.2M | 100% | Low risk26 | —-0.082 |
| 58 | 22ME0037CONST. OF FLOOD CONTROL ALONG SAUB RIVER, BRGY. MALALAG, MAITUM, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱48M | 100% | Low risk26 | —-0.071 |
| 59 | 22ME0033CONST. OF FLOOD CONTROL ALONG KALAONG RIVER (UPSTREAM), MAITUM, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱49M | 100% | Low risk25 | —-0.068 |
| 60 | 19MB0127ROAD CONCRETING AT PUROK 2 TO PUROK 7, BRGY. BATOMELONG, GEN. SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.084 |
| 61 | 23MB0029CONSTRUCTION OF ROAD, BARANGAY SILWAY 7, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.082 |
| 62 | 19MB0020CONSTRUCTION OF FLOOD CONTROL/CONCRETE REVETMENT ALONG SILWAY RIVER, P.I. 16, BRGY. CITY HEIGHTS, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱29.4M | 100% | Low risk25 | —-0.068 |
| 63 | 20MB0021CONSTRUCTION OF FLOOD CONTROL/CONCRETE REVETMENT ALONG UPPER MAKAR RIVER, BRGY. FATIMA, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱38.6M | 100% | Low risk25 | —-0.069 |
| 64 | 21MB0022CONSTRUCTION OF FLOOD CONTROL/CONCRETE REVETMENT ALONG TINAGACAN-BUAYAN RIVER (PHASE 2), BARANGAY TINAGACAN, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱45.4M | 100% | Low risk25 | —-0.067 |
| 65 | 25MB0038CONSTRUCTION OF ROAD, PUROK 5 AND PUROK 7 OF BARANGAY POLO, POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.085 |
| 66 | 24MB0007CONSTRUCTION OF ROAD, BARANGAY CANNERY SITE, MUNICIPALITY OF POLOMOLOK | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.084 |
| 67 | 21MB0023CONSTRUCTION OF CONCRETE REVETMENT, P.I. SILWAY RIVER, BARANGAY APOPONG, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱22.6M | 100% | Low risk25 | —-0.069 |
| 68 | 25MB0077CONSTRUCTION OF ROAD, SITIO ACFAON TO TINAGO ROAD, BARANGAY BUNAO, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.087 |
| 69 | 24MB0009CONSTRUCTION OF ROAD, PUROK NORCOS, BARANGAY POBLACION, MUNICIPALITY OF POLOMOLOK, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.085 |
| 70 | 18ME0001REHAB./RECONST./UPGRADING OD DAMMAGED PAVED ROADS, INCLUDING DRAINAGE ALONG SSKCR, K1681+282-K1682+050, MAASIM, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱21.1M | 100% | Low risk25 | —-0.083 |
| 71 | 19MB0022CONSTRUCTION OF CONCRETE REVETMENT STRUCTURE FOR FLOOD MITIGATION FROM SILWAY BRIDGE TO SINAWAL RIVER JUNCTION, BRGY. LABANGAL, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱29.4M | 100% | Low risk24 | —-0.068 |
| 72 | 19MB0113FLOOD CONTROL/DRAINAGE SYSTEM, BRGY. BULA, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱19.8M | 100% | Low risk24 | —-0.068 |
| 73 | 23MB0151CONSTRUCTION OF HEALTH EMERGENCY RESPONSE OPERATIONS CENTER, BRGY. LAGAO, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱49.5M | 100% | Low risk23 | —-0.071 |
| 74 | 24MB0087CONCRETING OF SITIO BASAK, BRGY. POLONULING FMR, BRGY. POLONULING, TUPI, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱14.9M | 100% | Low risk22 | —-0.033 |
| 75 | 22MB0020CONSTRUCTION OF CONNECTING TAXIWAY, TAMBLER, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱38.8M | 100% | Low risk21 | —-0.075 |