Contractor dossier
116 projects on file, including joint ventures this contractor is part of.
Total projects
116
Total budget
₱2.3B
Average progress
94.5%
Completion rate
71.6%
Average risk score
45.3
Medium risk on average, out of 100
Flagged as unusual
15
12.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 91 | ₱2B | 43.7 | 10 | 93.3% |
| Cordillera Administrative Region | 25 | ₱295.1M | 51.2 | 5 | 98.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 44 | ₱710.3M | 41.8 | 1 | 99.0% |
| Buildings and Facilities | 39 | ₱349.6M | 33.5 | 0 | 97.2% |
| OTHER | 11 | ₱213M | 76.4 | 8 | 88.2% |
| Flood Control and Drainage | 9 | ₱495.8M | 47.6 | 0 | 97.1% |
| GAA 2025 SSP | 3 | ₱150.1M | 95.0 | 3 | 37.1% |
| Bridges | 3 | ₱78.2M | 48.9 | 0 | 72.2% |
| Water Provision and Storage | 3 | ₱7M | 27.4 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱192.6M | 92.4 | 2 | 79.8% |
| GAA 2025 OO-1 | 1 | ₱57.1M | 94.1 | 1 | 80.5% |
| Bridges, Roads | 1 | ₱17.1M | 51.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BC0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN AGUSTIN, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | On-Going | ₱17.8M | 8% | High risk95 | Flagged0.039 |
| 25B00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046, K0655+062 - K | Region II | Region II | On-Going | ₱125.4M | 78% | High risk95 | Flagged0.036 |
| 25BC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CALOG SUR, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | On-Going | ₱6.9M | 26% | High risk94 | Flagged0.031 |
| 25PC0028OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0681+473 - K0682+529 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱57.1M | 81% | High risk94 | Flagged0.003 |
| 25BC0058ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF CAGAYAN RIVER REVETMENT 5 AL | Region II | Cagayan 2nd DEO | On-Going | ₱96.3M | 67% | High risk93 | Flagged0.008 |
| 25BC0059ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF ABULUG RIVER REVETMENT 9 ALO | Region II | Cagayan 2nd DEO | On-Going | ₱96.3M | 92% | High risk92 | Flagged0.001 |
| 24B00160DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS - LGU HOSPITALS - NORTHWESTERN CAGAYAN GENERAL HOSPITAL | Region II | Region II | On-Going | ₱37M | 62% | High risk83 | Flagged0.059 |
| 25PC0030CSSP-CONS/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL-IT)-DOÑA LORETA-LYDIA RD IN SUPPORT OF FURNITURE,HANDICRAFT,LOOMWEAVING,BLACKSMITHING,PINEAPPLE, BANANA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.7M | 96% | High risk80 | Flagged0.002 |
| 25PC0005CSSP-CONS/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)- PUDTOL-BAGUTONG RD IN SUPPORT OF FURNITURE HANDICRAFTS, LOOM WEAVING, BANANA, PINEAPPLE, | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱14.7M | 97% | High risk80 | Flagged0.002 |
| 24PC0086CSSP-BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION/COMPLETION OF SANTA MARCELA LEGISLATIVE BUILDING, BARANGAY SAN CARLOS, SANTA MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱4.9M | 100% | High risk79 | Flagged0.003 |
| 24BD0026OO1-CONST./ UPGRADING/ REHAB. OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS-SANTIAGO-TUG. RD (JCT KALINGA-TUGUEGARAO SECT)-K0441+000 - K0441+420, K0441+420 - K0441+740, K0441+740 - K0442+200, K0442+452 - K0443+112, K0443+626 - K0443+846 | Region II | Cagayan 3rd DEO | On-Going | ₱41.1M | 91% | High risk79 | Flagged0.009 |
| 24BC0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GOVERNMENT CENTER), LIBERTAD, ABULUG, CAGAYAN (PHASE 1) | Region II | Cagayan 2nd DEO | On-Going | ₱49.5M | 50% | High risk76 | Flagged0.024 |
| 25BC0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) -JCT.MANILA NORTH ROAD LEADING TO COCO | Region II | Cagayan 2nd DEO | On-Going | ₱14.6M | 81% | High risk76 | Flagged0.006 |
| 25BC0033CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BASIGUIAN ROAD LEADING TO MANILA NORT | Region II | Cagayan 2nd DEO | On-Going | ₱13.3M | 93% | High risk74 | Flagged0.005 |
| 25BC0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - PACAC-DALAYAP-SAN JUAN_TUBEL CONNECTI | Region II | Cagayan 2nd DEO | Completed | ₱6.8M | 100% | High risk72 | —-0.028 |
| 25BC0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT)-SAN JULIAN-TAYAK BARANGAY ROAD LEADING | Region II | Cagayan 2nd DEO | Completed | ₱11.8M | 100% | High risk71 | —-0.024 |
| 22BC0070CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)-SAN JULIAN-TAYAK BARANGAY ROAD LEADING TO MANILA NORTH ROAD (MNR) CONNECTING TO AGRI BUSINESS INDUSTRY-AQUATIC RESOURCES, VEGETABLES, RICE AND NIPA BY | Region II | Cagayan 2nd DEO | Completed | ₱9.6M | 100% | High risk70 | —-0.024 |
| 24BC0094CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GOVERNMENT CENTER PACKAGE 4), LIBERTAD, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | On-Going | ₱99M | 90% | High risk60 | —-0.025 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24B00160DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS - LGU HOSPITALS - NORTHWESTERN CAGAYAN GENERAL HOSPITAL | Region II | Region II | On-Going | ₱37M | 62% | High risk83 | Flagged0.059 |
| 25BC0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN AGUSTIN, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | On-Going | ₱17.8M | 8% | High risk95 | Flagged0.039 |
| 25B00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046, K0655+062 - K | Region II | Region II | On-Going | ₱125.4M | 78% | High risk95 | Flagged0.036 |
| 25BC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CALOG SUR, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | On-Going | ₱6.9M | 26% | High risk94 | Flagged0.031 |
| 24BC0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (GOVERNMENT CENTER), LIBERTAD, ABULUG, CAGAYAN (PHASE 1) | Region II | Cagayan 2nd DEO | On-Going | ₱49.5M | 50% | High risk76 | Flagged0.024 |
| 24BD0026OO1-CONST./ UPGRADING/ REHAB. OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS-SANTIAGO-TUG. RD (JCT KALINGA-TUGUEGARAO SECT)-K0441+000 - K0441+420, K0441+420 - K0441+740, K0441+740 - K0442+200, K0442+452 - K0443+112, K0443+626 - K0443+846 | Region II | Cagayan 3rd DEO | On-Going | ₱41.1M | 91% | High risk79 | Flagged0.009 |
| 24PC0082CONCRETING OF SITIO MAWANAN-STA. ROSA-SITIO SINIGPIT, BRGY. SANTA FILOMENA FMR, BRGY. SANTA FILOMENA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱14.9M | 100% | Medium risk53 | Flagged0.009 |
| 25BC0058ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF CAGAYAN RIVER REVETMENT 5 AL | Region II | Cagayan 2nd DEO | On-Going | ₱96.3M | 67% | High risk93 | Flagged0.008 |
| 25BC0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) -JCT.MANILA NORTH ROAD LEADING TO COCO | Region II | Cagayan 2nd DEO | On-Going | ₱14.6M | 81% | High risk76 | Flagged0.006 |
| 25BC0033CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - BASIGUIAN ROAD LEADING TO MANILA NORT | Region II | Cagayan 2nd DEO | On-Going | ₱13.3M | 93% | High risk74 | Flagged0.005 |
| 25PC0028OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0681+473 - K0682+529 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱57.1M | 81% | High risk94 | Flagged0.003 |
| 24PC0086CSSP-BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION/COMPLETION OF SANTA MARCELA LEGISLATIVE BUILDING, BARANGAY SAN CARLOS, SANTA MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱4.9M | 100% | High risk79 | Flagged0.003 |
| 25PC0030CSSP-CONS/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL-IT)-DOÑA LORETA-LYDIA RD IN SUPPORT OF FURNITURE,HANDICRAFT,LOOMWEAVING,BLACKSMITHING,PINEAPPLE, BANANA | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱9.7M | 96% | High risk80 | Flagged0.002 |
| 25PC0005CSSP-CONS/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRASTRUCTURE PROGRAM-ROLL-IT)- PUDTOL-BAGUTONG RD IN SUPPORT OF FURNITURE HANDICRAFTS, LOOM WEAVING, BANANA, PINEAPPLE, | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱14.7M | 97% | High risk80 | Flagged0.002 |
| 25BC0059ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF ABULUG RIVER REVETMENT 9 ALO | Region II | Cagayan 2nd DEO | On-Going | ₱96.3M | 92% | High risk92 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 19BC0315LOCAL INFRASTRUCTURE PROGRAM-CONCRETING OF ROAD, BRGY. DAGUPAN, ALLACAPAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱1.9M | 100% | Low risk21 | —-0.079 |
| 102 | 19BC0310LOCAL INFRASTRUCTURE PROGRAM-FLOOD CONTROL AND DRAINAGE-RIPRAPPING OF SLOPE PROTECTION, BULO ELLEMENTARY SCHOOL, BRGY. BULO, ALLACAPAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱982.5K | 100% | Low risk18 | —-0.065 |
| 103 | 19BC0201LOCAL INFRASTRUCTURE PROGRAM-CONCRETING OF ROAD, BRGY. BUROT, ALLACAPAN, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.080 |
| 104 | 22BC0100BASIC INFRASTRUCTURE PROGRAM: MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING AT BRGY. PINAS, CLAVERIA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱1.9M | 100% | Low risk14 | —-0.077 |
| 105 | 19BC0087LIP-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. APAYAO, PIAT, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱734.7K | 100% | Low risk13 | —-0.082 |
| 106 | 19BC0086LIP-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. ABARRIONGAN RUAR, STO. NIÑO, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱735K | 100% | Low risk13 | —-0.083 |
| 107 | 19BC0088CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. BALAGAN, STO. NIÑO, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱650.5K | 100% | Low risk13 | —-0.084 |
| 108 | 19BC0245LOCAL INFRA PROGRAM-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. MINANGA SUR, LASAM, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱738.7K | 100% | Low risk13 | —-0.075 |
| 109 | 20BC0105CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT NAMUCCAYAN INTEGRATED SCHOOL, NAMUCCAYAN, STO. NIÑO, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱485.3K | 100% | Low risk13 | —-0.084 |
| 110 | 20BC0104CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BRGY. NAMUCCAYAN, STO. NIÑO, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱485.1K | 100% | Low risk13 | —-0.085 |
| 111 | 19BC0224LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. CATALIGANAN, LASAM, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱736.1K | 100% | Low risk13 | —-0.083 |
| 112 | 19BC0207LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING, ALANNAY, LASAM, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱736.6K | 100% | Low risk13 | —-0.083 |
| 113 | 19BC0288LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, BIDDUANG, PAMPLONA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱979.7K | 100% | Low risk12 | —-0.077 |
| 114 | 19BC0296LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, ALLASITAN ELEMENTARY SCHOOL, ALLASITAN, PAMPLONA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱735K | 100% | Low risk12 | —-0.076 |
| 115 | 19BC0308LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, CALOG SUR ELMENTARY SCHOOL, BRGY. CALOG SUR, ABULUG, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱982.8K | 100% | Low risk12 | —-0.081 |
| 116 | 19BC0093LIP-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CENTRO 6, CLAVERIA, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱1M | 100% | Low risk12 | —-0.078 |