85 projects on file, including joint ventures this contractor is part of.
Total projects
85
Total budget
₱15.5B
Average progress
82.3%
Completion rate
65.9%
Below 70%
Average risk score
59.9
Medium risk on average, out of 100
Flagged as unusual
22
25.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 19 | ₱1.6B | 54.6 | 3 | 72.4% |
| Region I | 13 | ₱2.6B | 62.5 | 4 | 80.0% |
| Region II | 8 | ₱1.8B | 64.2 | 4 | 99.2% |
| Region IV-B | 8 | ₱1.4B | 59.4 | 0 | 98.4% |
| Region VII | 7 | ₱1.4B | 62.8 | 5 | 52.1% |
| Region VIII | 7 | ₱649.1M | 56.0 | 0 | 100.0% |
| Region III | 7 | ₱1.3B | 51.3 | 1 | 88.7% |
| Region VI | 5 | ₱454.8M | 60.0 | 1 | 100.0% |
| Region IV-A | 4 | ₱708M | 67.6 | 0 | 50.0% |
| Central Office | 3 | ₱1B | 73.2 | 2 | 85.5% |
| Region XI | 3 | ₱2.2B | 69.5 | 2 | 85.0% |
| Region X | 1 | ₱306.4M | 61.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 36 | ₱6.3B | 58.5 | 6 | 84.1% |
| Bridges | 26 | ₱5B | 62.0 | 11 | 85.3% |
| Flood Control and Drainage | 14 | ₱2.1B | 62.1 | 3 | 69.0% |
| Bridges, Roads | 4 | ₱549.7M | 63.4 | 1 | 75.0% |
| Buildings and Facilities | 3 | ₱44.8M | 34.0 | 0 | 100.0% |
| OTHER | 2 | ₱1.5B | 72.6 | 1 | 92.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22L00017CONSTRUCTION OF FLYOVER ALONG DAVAO CITY DIVERSION ROAD (JCT. MAGTUOD/MAA SECTION), DAVAO CITY | Region XI | Region XI | On-Going | ₱1.4B | 84% | High risk80 | Flagged0.061 |
| 24A00001WIDENING OF PERMANENT BRIDGES, BACARRA BR. (B00526LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱294.7M | 28% | High risk74 | Flagged0.041 |
| 20Z00020METRO CEBU FLOOD CONTROL PROJECT-FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, TIPOLO RIVER, GUIZO, MANTUYONG AND TIPOLO, MANDAUE CITY, CEBU | Central Office | Flood Control Management Cluster | Completed | ₱162.8M | 100% | High risk74 | —-0.052 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 22A00294REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0576 + 900 - K0576 + 940, K0577 + 400 - K0577 + 440 | Region I | Region I | On-Going | ₱187.2M | 34% | High risk70 | Flagged0.021 |
| 22A00295REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0578 + 800 - K0578 + 840, K0578 + 880 - K0578 + 960 | Region I | Region I | On-Going | ₱191.6M | 37% | High risk70 | Flagged0.019 |
| 22A00298REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0585 + 500 - K0585 + 550, K0579 + 070 - K0579 + 140 | Region I | Region I | On-Going | ₱188.7M | 44% | High risk70 | Flagged0.016 |
| 19D00025FY 2019 DPWH INFRASTRUCTURE PROGRAMLOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES, CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REPLACEMENT OF LAVIDES BRIDGE AND APPROACHES, ATIMONAN | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk68 | —-0.036 |
| 21B00060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS JCT. CAGAYAN VALLEY ROAD-SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), CAGAY | Region II | Region II | Completed | ₱202.9M | 100% | High risk68 | —-0.005 |
| 19D00007FY 2019 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BATANGAS CITY- SAN PASCUAL -BAUAN ROAD, (SECTION 1), PACKAGE B, BATANGAS | Region IV-A | Region IV-A | Completed | ₱140.6M | 100% | High risk67 | —-0.067 |
| 25D00031CONSTRUCTION OF FLOOD CONTROL ALONG LOBO RIVER (DOWNSTREAM), PHASE II, BARANGAY LAGADLARIN, LOBO, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱187.2M | 0% | High risk67 | —-0.000 |
| 25D00030CONSTRUCTION OF FLOOD CONTROL ALONG LOBO RIVER (DOWNSTREAM), PHASE I, BARANGAY LAGADLARIN, LOBO, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱187.2M | 0% | High risk67 | —-0.000 |
| 19O00026CONSTRUCTION OF BRIDGE ALONG PARANAQUE RIVER ADJACENT TO PARANAQUE INTEGRATED TERMINAL EXCHANGE (PARANAQUE ITX) DON GALO, PARANAQUE CITY | National Capital Region | National Capital Region | Completed | ₱143M | 100% | High risk67 | —-0.032 |
| 17B00038MFO 1: NAT'L ROAD NETWORK SERVICES: CONST'N AND MAINTENANCE OF BRIDGES ALONG NAT'L ROADS NEW CONST'N OF PERMANENT BRIDGES-TERTIARY, TALLANG BRIDGE 1 AND APPROACHES ALONG BAYBAYOG-BAGGAO-DALIN-STA. MARGARITA ROAD, BAGGAO, CAGAYAN | Region II | Region II | Completed | ₱182.1M | 100% | High risk67 | Flagged0.019 |
| 23I00023NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN CITY BYPASS ROAD EXTENSION, (CONSTRUCTION OF BRIDGE), BRGY. TIGBAO, TACLOBAN CITY | Region VIII | Region VIII | Completed | ₱207.1M | 100% | High risk67 | —-0.020 |
| 24O00003RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - QUEZON BR. (B03195LZ) ALONG QUEZON BLVD EXTN | National Capital Region | National Capital Region | On-Going | ₱149.6M | 4% | High risk67 | Flagged0.011 |
| 19O00033PASIG RIVER ESPLANADE FROM AYALA BRIDGE TO JONES BRIDGE ALONG PASIG RIVER, MANILA | National Capital Region | National Capital Region | Completed | ₱193M | 100% | High risk67 | —-0.012 |
| 23O00001NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: ALABANG-ZAPOTE DIVERSION ROAD, LAS PIÑAS CITY (RE-ADVERTISEMENT) | National Capital Region | National Capital Region | On-Going | ₱167.3M | 0% | High risk67 | Flagged0.007 |
| 18O00007REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, M,ARCOS BRIDGE (B01752LZ) ALONG MARCOS HIGHWAY, MARIKINA CITY | National Capital Region | National Capital Region | Completed | ₱151M | 100% | High risk66 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20O00077CONSTRUCTION OF BRIDGE ACROSS PARANAQUE RIVER ADJACENT TO THE PARANAQUE INTEGRATED TERMINAL EXCHANGE (PITX), DON GALO, PARANAQUE CITY | National Capital Region | National Capital Region | On-Going | ₱18.9M | 0% | Medium risk49 | Flagged0.066 |
| 22L00017CONSTRUCTION OF FLYOVER ALONG DAVAO CITY DIVERSION ROAD (JCT. MAGTUOD/MAA SECTION), DAVAO CITY | Region XI | Region XI | On-Going | ₱1.4B | 84% | High risk80 | Flagged0.061 |
| 24A00001WIDENING OF PERMANENT BRIDGES, BACARRA BR. (B00526LZ) ALONG MANILA NORTH ROAD | Region I | Region I | On-Going | ₱294.7M | 28% | High risk74 | Flagged0.041 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 22L00172CONSTRUCTION OF DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO - BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT), BARANGAY TALOMO PROPER AND BARANGAY CATALUNAN PEQUEÑO, DAVAO CITY | Region XI | Region XI | On-Going | ₱570.3M | 71% | High risk64 | Flagged0.039 |
| 20B00025ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF SAN LORENZO RUIZ BRIDGE (B01235LZ) (PARALLEL BRIDGE) ALONG DAANG MAHARLIKA (LZ) | Region II | Region II | On-Going | ₱384.8M | 94% | High risk64 | Flagged0.039 |
| 21Z00009SAN MIGUEL BRIDGE (BO4187LZ) ALONG SAN SIMON-BALIWAG ROAD IN SAN SIMON, PAMPANGA, UNDER BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1, PROVINCE OF PAMPANGA | Central Office | Bridges Management Cluster | On-Going | ₱316.5M | 64% | High risk73 | Flagged0.028 |
| 22A00294REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0576 + 900 - K0576 + 940, K0577 + 400 - K0577 + 440 | Region I | Region I | On-Going | ₱187.2M | 34% | High risk70 | Flagged0.021 |
| 22A00295REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0578 + 800 - K0578 + 840, K0578 + 880 - K0578 + 960 | Region I | Region I | On-Going | ₱191.6M | 37% | High risk70 | Flagged0.019 |
| 20G00094IMPROVEMENT OF BRIDGE, CABIA-AN RIVER, BRGY, CABIA-AN | Region VI | Region VI | Completed | ₱72.1M | 100% | Medium risk54 | Flagged0.019 |
| 17B00038MFO 1: NAT'L ROAD NETWORK SERVICES: CONST'N AND MAINTENANCE OF BRIDGES ALONG NAT'L ROADS NEW CONST'N OF PERMANENT BRIDGES-TERTIARY, TALLANG BRIDGE 1 AND APPROACHES ALONG BAYBAYOG-BAGGAO-DALIN-STA. MARGARITA ROAD, BAGGAO, CAGAYAN | Region II | Region II | Completed | ₱182.1M | 100% | High risk67 | Flagged0.019 |
| 22A00298REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MANILA NORTH RD - K0585 + 500 - K0585 + 550, K0579 + 070 - K0579 + 140 | Region I | Region I | On-Going | ₱188.7M | 44% | High risk70 | Flagged0.016 |
| 19B00042OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: PINARIPAD BRIDGE (B01214LZ) ALONG CDMA (DALEMDEM-PINARIPAD-PALACIAN) BY-PASS ROAD, AGLIPAY, QUIRINO | Region II | Region II | Completed | ₱350M | 100% | High risk64 | Flagged0.013 |
| 24O00003RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - QUEZON BR. (B03195LZ) ALONG QUEZON BLVD EXTN | National Capital Region | National Capital Region | On-Going | ₱149.6M | 4% | High risk67 | Flagged0.011 |
| 25H00006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, BARANGAY POBLACION, SIERRA BULLONES, BOHOL | Region VII | Region VII | On-Going | ₱192.7M | 21% | High risk64 | Flagged0.009 |
| 25H00008OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, BARANGAY SALVADOR, SIERRA BULLONES,BOHOL | Region VII | Region VII | On-Going | ₱192.7M | 21% | High risk64 | Flagged0.009 |
| 25H00007OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, BARANGAY BUGSOC, SIERRA BULLONES, BOHOL | Region VII | Region VII | On-Going | ₱192.7M | 23% | High risk64 | Flagged0.008 |
| 23O00001NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: ALABANG-ZAPOTE DIVERSION ROAD, LAS PIÑAS CITY (RE-ADVERTISEMENT) | National Capital Region | National Capital Region | On-Going | ₱167.3M | 0% | High risk67 | Flagged0.007 |
| 22H00035ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - SECONDARY ROADS, LOAY INTERIOR ROAD - K0182 + 450 - K0182 + 700, BOHO | Region VII | Region VII | On-Going | ₱144.7M | 33% | High risk62 | Flagged0.002 |
| 22B00008OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BYPASS AND DIVERSION ROADS - ALICIA BYPASS ROAD, ISABELA | Region II | Region II | Completed | ₱240M | 100% | High risk64 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 21C00067ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, NUEVA ECIJA-AURORA ROAD, PROVINCE OF AURORA | Region III | Region III | Completed | ₱144.8M | 100% | Medium risk50 | —-0.075 |
| 77 | 20O00077CONSTRUCTION OF BRIDGE ACROSS PARANAQUE RIVER ADJACENT TO THE PARANAQUE INTEGRATED TERMINAL EXCHANGE (PITX), DON GALO, PARANAQUE CITY | National Capital Region | National Capital Region | On-Going | ₱18.9M | 0% | Medium risk49 | Flagged0.066 |
| 78 | 20ID0014ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-PALO-CARIGARA-ORMOC RD.-K0969+ 503 -K0970+(024.80),K0970+114-K0970 + 198 | Region VIII | Leyte 2nd DEO | Completed | ₱37.9M | 100% | Medium risk49 | —-0.095 |
| 79 | 25O00006RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - EDSA/ORTIGAS INTERCHANGE (B03316LZ) ALONG EDSA/ORTIGAS INTERCHANGE | National Capital Region | National Capital Region | On-Going | ₱19.1M | 79% | Medium risk49 | —-0.009 |
| 80 | 19IG0063CONSTRUCTION OF BY-PASSES/DIVERSION ROADS ALONG BRGY. KILIM-SITIO TIPAY ROAD JUNCTION ORMOC-BAYBAY-SOUTHERN LEYTE BOUNDARY ROAD TO BUENAVISTA JUNCTION TO JUNCTION TACLOBAN-BAYBAY-SOUTH ROAD, PACKAGE 1, BAYBAY CITY, LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.095 |
| 81 | 20E00069LIP- CONSTRUCTION OF CORON-CULION INTER-ISLAND BRIDGES-TRAVERSE BRGY. BINTUAN IN CORON TO BRGY. JARDIN IN CULION, PALAWAN | Region IV-B | Region IV-B | Terminated | ₱51.9M | 100% | Medium risk47 | —-0.021 |
| 82 | 25O00007RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - EDSA/ORTIGAS INTERCHANGE (B03317LZ) ALONG EDSA/ORTIGAS INTERCHANGE, PHASE 2 | National Capital Region | National Capital Region | On-Going | ₱19.1M | 86% | Medium risk47 | —-0.033 |
| 83 | 18OB0492IMPROVEMENT OF SAN MIGUEL ST. AND VICINITY (DRAINAGE AND CONCRETING) BRGY. PLAINVIEW, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.090 |
| 84 | 19OB0075REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BAGONG SILANG, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.102 |
| 85 | 19OB0074REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING (POLICE AND FIRE STATION), BRGY. PAG-ASA, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.102 |