Contractor dossier
91 projects on file, including joint ventures this contractor is part of.
Total projects
91
Total budget
₱3B
Average progress
94.2%
Completion rate
81.3%
Average risk score
45.2
Medium risk on average, out of 100
Flagged as unusual
8
8.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 50 | ₱1.1B | 42.5 | 4 | 95.5% |
| Region XI | 7 | ₱499.4M | 57.5 | 1 | 88.4% |
| Region IV-A | 7 | ₱138M | 46.7 | 0 | 100.0% |
| Region III | 7 | ₱374.6M | 35.2 | 1 | 99.4% |
| Region II | 4 | ₱175.6M | 79.6 | 2 | 83.3% |
| Region I | 4 | ₱256.3M | 47.6 | 0 | 84.5% |
| Region X | 3 | ₱183.5M | 50.4 | 0 | 85.0% |
| Region IX | 2 | ₱58.6M | 53.2 | 0 | 97.5% |
| Region VI | 2 | ₱49.2M | 46.5 | 0 | 100.0% |
| National Capital Region | 2 | ₱5.5M | 11.0 | 0 | 100.0% |
| Region V | 1 | ₱46.9M | 57.6 | 0 | 100.0% |
| Region XIII | 1 | ₱80.1M | 45.1 | 0 | 55.1% |
| Region XII | 1 | ₱48.2M | 29.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 33 | ₱1.3B | 41.3 | 0 | 93.2% |
| Flood Control and Drainage | 18 | ₱655.1M | 43.0 | 1 | 99.8% |
| Bridges | 16 | ₱474.3M | 40.5 | 0 | 100.0% |
| Buildings and Facilities | 10 | ₱229M | 34.1 | 0 | 100.0% |
| OTHER | 6 | ₱188.2M | 72.5 | 3 | 80.8% |
| GAA 2025 OO-1 | 3 | ₱65.6M | 91.1 | 2 | 57.0% |
| GAA 2025 SSP | 2 | ₱18.6M | 93.2 | 2 | 70.1% |
| Water Provision and Storage | 2 | ₱10.6M | 25.2 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱49M | 44.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EB0059CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY TALAOTAO, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱11.9M | 77% | High risk93 | Flagged0.016 |
| 25EB0034CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 6, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱6.7M | 63% | High risk93 | Flagged0.022 |
| 25BA0028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/ NEW ROADS: SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, SUMNANGA, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 49% | High risk92 | Flagged0.012 |
| 25EB0003REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - JCT. TLLR-BINACAS RD (S00012LB) - K0006+340- K0006+610 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱8.1M | 22% | High risk91 | Flagged0.015 |
| 25EB0005REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TAGBAC-LUBANG-LOOC RD (S00004LB) - K0005+118- K0005+317 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱8.6M | 100% | High risk91 | —-0.000 |
| 24BA0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SUMNANGA, SABTANG, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱48.9M | 84% | High risk78 | Flagged0.017 |
| 24LI0114REHABILITATION (COMPLETION) OF MULTI-PURPOSE BUILDING (RHU BUILDING), PHASE III, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.5M | 30% | High risk76 | Flagged0.037 |
| 25EB0030CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUYANG BAGA CAVE, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱9.6M | 70% | High risk74 | Flagged0.003 |
| 23BA0040ORGANIZATION OUTCOME 1: ENSURE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS; SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SABTANG, BATANES - PACKAGE 2 | Region II | Batanes DEO | Completed | ₱39.8M | 100% | High risk74 | —-0.010 |
| 23BA0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS ; SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SABTANG, BATANES - PACKAGE 1, SABTANG, BATANES | Region II | Batanes DEO | Completed | ₱37.9M | 100% | High risk74 | —-0.010 |
| 24L00237CONSTRUCTION OF ROAD, SATURNINO R. SILVA ROAD, CARMEN, DAVAO DEL NORTE PHASE 2 | Region XI | Region XI | On-Going | ₱96.1M | 94% | High risk62 | —-0.039 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LI0114REHABILITATION (COMPLETION) OF MULTI-PURPOSE BUILDING (RHU BUILDING), PHASE III, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.5M | 30% | High risk76 | Flagged0.037 |
| 25EB0034CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 6, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱6.7M | 63% | High risk93 | Flagged0.022 |
| 24BA0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SUMNANGA, SABTANG, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱48.9M | 84% | High risk78 | Flagged0.017 |
| 25EB0059CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY TALAOTAO, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱11.9M | 77% | High risk93 | Flagged0.016 |
| 25EB0003REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - JCT. TLLR-BINACAS RD (S00012LB) - K0006+340- K0006+610 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱8.1M | 22% | High risk91 | Flagged0.015 |
| 25BA0028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/ NEW ROADS: SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, SUMNANGA, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 49% | High risk92 | Flagged0.012 |
| 24CI0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAPANGBATO RIVER (LEFT DIKE), BARANGAYS SAPANGBATO AND MARGOT, ANGELES CITY | Region III | Pampanga 3rd DEO | On-Going | ₱48.2M | 96% | Medium risk45 | Flagged0.010 |
| 25EB0030CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUYANG BAGA CAVE, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱9.6M | 70% | High risk74 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25EB0059CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY TALAOTAO, LOOC, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱11.9M | 77% | High risk93 | Flagged0.016 |
| 2 | 25EB0034CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 6, PALUAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱6.7M | 63% | High risk93 | Flagged0.022 |
| 3 | 25BA0028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/ NEW ROADS: SAN VICENTE- SAVIDUG- CHAVAYAN- SUMNANGA- NAKANMUAN ROAD, SUMNANGA, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 49% | High risk92 | Flagged0.012 |
| 4 | 25EB0003REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - JCT. TLLR-BINACAS RD (S00012LB) - K0006+340- K0006+610 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱8.1M | 22% | High risk91 | Flagged0.015 |
| 5 | 25EB0005REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TAGBAC-LUBANG-LOOC RD (S00004LB) - K0005+118- K0005+317 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱8.6M | 100% | High risk91 | —-0.000 |
| 6 | 24BA0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SUMNANGA, SABTANG, PACKAGE 2, BATANES | Region II | Batanes DEO | On-Going | ₱48.9M | 84% | High risk78 | Flagged0.017 |
| 7 | 24LI0114REHABILITATION (COMPLETION) OF MULTI-PURPOSE BUILDING (RHU BUILDING), PHASE III, MONKAYO, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱49.5M | 30% | High risk76 | Flagged0.037 |
| 8 | 25EB0030CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO LUYANG BAGA CAVE, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱9.6M | 70% | High risk74 | Flagged0.003 |
| 9 | 23BA0040ORGANIZATION OUTCOME 1: ENSURE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS; SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SABTANG, BATANES - PACKAGE 2 | Region II | Batanes DEO | Completed | ₱39.8M | 100% | High risk74 | —-0.010 |
| 10 | 23BA0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS ; SAN VICENTE-SAVIDUG-CHAVAYAN-SUMNANGA-NAKANMUAN ROAD, SABTANG, BATANES - PACKAGE 1, SABTANG, BATANES | Region II | Batanes DEO | Completed | ₱37.9M | 100% | High risk74 | —-0.010 |
| 11 | 24L00237CONSTRUCTION OF ROAD, SATURNINO R. SILVA ROAD, CARMEN, DAVAO DEL NORTE PHASE 2 | Region XI | Region XI | On-Going | ₱96.1M | 94% | High risk62 | —-0.039 |
| 12 | 23LC0065CONSTRUCTION OF TWO-STOREY MULTI-PURPOSE BUILDING (CITY HEALTH OFFICE), CITY HALL GROUNDS, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.061 |
| 13 | 25EB0126CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM, OCCIDENTAL MINDORO: A. TILAGO MINORITY SCHOOL, STA.CRUZ, B. SANOG-LAKOL ELEMENTARY SCHOOL, STA.CRUZ, C. KABANABAHAN ELEMENTARY SCHOOL, STA.CRUZ, D. OCCIDENTAL MINDORO NATIONAL HIGH SCHOOL - TALABAAN EXTE | Region IV-B | Mindoro Occidental DEO | Completed | ₱2.5M | 100% | Medium risk58 | —-0.020 |
| 14 | 20FL0006PREVENTIVE MAINT. - TERTIARY ROADS - JCT. ABUYOG-GUBAT-ARIMAN RD - K0599+000-K0600+879 AND PREVENTIV | Region V | Sorsogon 2nd DEO | Completed | ₱46.9M | 100% | Medium risk58 | —-0.097 |
| 15 | 23A00135CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BAUANG-SAN FERNANDO-SAN JUAN BYPASS ROAD, (SAN FERNANDO-SAN JUAN SECTION), PACKAGE 1, LA UNION | Region I | Region I | On-Going | ₱158.3M | 38% | Medium risk56 | —-0.002 |
| 16 | 23L00052CONSTRUCTION OF FLOOD CONTROL STRUCTURE OUTFALL TO DIGOS - MAKAR ROAD, SULOP, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱90.2M | 100% | Medium risk55 | —-0.064 |
| 17 | 22JD0055CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SICAYAB-BUCANA-DAPITAN PORT DIVERSION ROAD,ZN | Region IX | Zamboanga del Norte 1st DEO | On-Going | ₱45.3M | 95% | Medium risk55 | —-0.026 |
| 18 | 23E00207ASSET PRESERVATION PROGRAM- REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS- MINDORO WEST COASAL ROAD, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱101.2M | 100% | Medium risk53 | —-0.080 |
| 19 | 22JE0034SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) CONSTRUCTION OF ALANG- ALANG- LOWER TIPARAK- TUNGAWAN BY- PASS ROAD, ZAMBOANGA DEL SUR, TAMBULIG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱13.3M | 100% | Medium risk52 | —-0.084 |
| 20 | 23L00033CONSTRUCTION OF CONCRETE ROAD - JCT. TAGUM - PANABO CIRCUMFERENTIAL ROAD - MALITBOG - KASILAK TO JCT. CONSOLACION, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱50.6M | 94% | Medium risk52 | —-0.039 |
| 21 | 23K00014CONST. OF MISSING LINKS/NEW ROADS ,ILIGAN CITY - CAGAYAN DE ORO CITY ALTERNATE ROUTE (DIGKILAAN - BULUA SECTION), PACKAGE 8, LANAO DEL NORTE | Region X | Region X | Completed | ₱75.3M | 100% | Medium risk51 | —-0.084 |
| 22 | 25K00154CONST. OF MISSING LINKS/NEW ROADS ILIGAN CITY - CAGAYAN DE ORO CITY ALTERNATE ROAD (DIGKILAAN-BULUA SECTION), PACKAGE 11, ILIGAN CITY | Region X | Region X | On-Going | ₱61.4M | 55% | Medium risk51 | —-0.046 |
| 23 | 19EB0010RETROFITTING/STRENGTHENING OF BRIDGE - BUSWANGA BR. (B0014MR) ALONG JCT. MWCR (LABANGAN)-MURTHA JCT. IRIRON RD., SAN JOSE, OCC. MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱74.9M | 100% | Medium risk50 | —-0.047 |
| 24 | 23LC0066CONSTRUCTION OF TWO-STOREY MULTI-PURPOSE BUILDING (SOCIAL SERVICE OFFICE), CITY HALL GROUNDS, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.073 |
| 25 | 19EB0012WIDENING OF BRIDGE-POLA BR. (B00105MR) ALONG MINDORO WEST COASTAL RD, SAN JOSE, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱73.8M | 100% | Medium risk50 | —-0.023 |