173 projects on file, including joint ventures this contractor is part of.
Total projects
173
Total budget
₱17.1B
Average progress
97.4%
Completion rate
82.1%
Average risk score
51.2
Medium risk on average, out of 100
Flagged as unusual
20
11.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 170 | ₱17B | 51.3 | 20 | 97.3% |
| Region IV-A | 3 | ₱87.5M | 48.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 108 | ₱11.1B | 45.0 | 0 | 99.5% |
| Bridges | 20 | ₱1.8B | 47.7 | 0 | 99.4% |
| Flood Control and Drainage | 16 | ₱1.5B | 44.7 | 0 | 100.0% |
| GAA 2025 SSP | 11 | ₱1.1B | 95.4 | 11 | 84.3% |
| GAA 2025 OO-1 | 6 | ₱573.5M | 92.7 | 6 | 66.7% |
| Bridges, Roads | 5 | ₱633M | 50.7 | 0 | 100.0% |
| OTHER | 3 | ₱139.7M | 74.7 | 2 | 99.0% |
| GAA 2025 OO-2 | 2 | ₱143.6M | 85.8 | 1 | 92.8% |
| Buildings and Facilities | 2 | ₱53.6M | 38.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00058CONSTRUCTION OF STA. IRENE - SAN MIGUEL ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱187.3M | 98% | High risk96 | Flagged0.030 |
| 25NC0036CONSTRUCTION OF NRJ SARMIENTO, TRENTO - BISLIG BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.6M | 92% | High risk96 | Flagged0.021 |
| 25NC0015CONSTRUCTION OF ROAD, NRJ OSMEÑA-COMOTA-LYDIA ROAD, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 80% | High risk96 | Flagged0.020 |
| 25NC0005CONSTRUCTION OF HINATUAN-BUNAWAN-ROSARIO BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 97% | High risk96 | Flagged0.016 |
| 25NH0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱143.3M | 92% | High risk96 | Flagged0.025 |
| 25NH0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK LANSONES I, BARANGAY SAN AGUSTIN, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 100% | High risk96 | Flagged0.013 |
| 25N00243CONSTRUCTION OF STA. IRENE-SAN MIGUEL ROAD, (PACKAGE 4), SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱140.4M | 62% | High risk96 | Flagged0.034 |
| 25N00071CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD, BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱149.8M | 91% | High risk96 | Flagged0.034 |
| 25NH0012CONST. OF DAWIS SEAWALL, PHASE II, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 93% | High risk95 | Flagged0.025 |
| 25NH0007CONST. OF SEAWALL, BARANGAY BAGONG LUNGSOD, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 81% | High risk95 | Flagged0.028 |
| 25N00242CONSTRUCTION OF NRJ SANTIAGO - CANTILAN ROAD, PACKAGE 1, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱93.6M | 42% | High risk94 | Flagged0.031 |
| 25N00127EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR) - CALAITAN (BAYUGAN), PACKAGE 18, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.021 |
| 25N00075CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE 13, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 100% | High risk94 | Flagged0.008 |
| 25NI0055ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1397 + 428 - K1399 + 516 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱94.6M | 60% | High risk94 | Flagged0.024 |
| 25N00162STA. JOSEFA BR. (B00801MN) ALONG NRJ CUEVAS-SAMPAGUITA RD | Region XIII | Region XIII | On-Going | ₱234.1M | 82% | High risk93 | Flagged0.036 |
| 25NH0029SURIGAO-DAVAO COASTAL RD - K1284 + 805 - K1284 + 825, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱29.1M | 89% | High risk92 | Flagged0.008 |
| 25N00069TRENTO-LINGIG ROAD, TRENTO, PACKAGE 1, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱26.7M | 13% | High risk88 | Flagged0.035 |
| 25NH0011CONST. OF FLOOD MITIGATION ALONG TANDAG RIVER, BRGY. QUEZON, TANDAG CITY, SURIGAO DEL SUR, PHASE 1 | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 88% | High risk88 | Flagged0.000 |
| 25NH0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TANDAG RIVER, BARANGAY SAN AGUSTIN SUR, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.1M | 98% | High risk83 | —-0.006 |
| 21NI0061CONSTRUCTION OF BISLIG CITY COASTAL PROTECTION ALONG SURIGAO-DAVAO COASTAL RD, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱76.5M | 100% | High risk76 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00162STA. JOSEFA BR. (B00801MN) ALONG NRJ CUEVAS-SAMPAGUITA RD | Region XIII | Region XIII | On-Going | ₱234.1M | 82% | High risk93 | Flagged0.036 |
| 25N00069TRENTO-LINGIG ROAD, TRENTO, PACKAGE 1, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱26.7M | 13% | High risk88 | Flagged0.035 |
| 25N00243CONSTRUCTION OF STA. IRENE-SAN MIGUEL ROAD, (PACKAGE 4), SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱140.4M | 62% | High risk96 | Flagged0.034 |
| 25N00071CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD, BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱149.8M | 91% | High risk96 | Flagged0.034 |
| 25N00242CONSTRUCTION OF NRJ SANTIAGO - CANTILAN ROAD, PACKAGE 1, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱93.6M | 42% | High risk94 | Flagged0.031 |
| 25N00058CONSTRUCTION OF STA. IRENE - SAN MIGUEL ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱187.3M | 98% | High risk96 | Flagged0.030 |
| 25NH0007CONST. OF SEAWALL, BARANGAY BAGONG LUNGSOD, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 81% | High risk95 | Flagged0.028 |
| 25NH0012CONST. OF DAWIS SEAWALL, PHASE II, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 93% | High risk95 | Flagged0.025 |
| 25NH0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱143.3M | 92% | High risk96 | Flagged0.025 |
| 25NI0055ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1397 + 428 - K1399 + 516 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱94.6M | 60% | High risk94 | Flagged0.024 |
| 25N00127EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR) - CALAITAN (BAYUGAN), PACKAGE 18, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.021 |
| 25NC0036CONSTRUCTION OF NRJ SARMIENTO, TRENTO - BISLIG BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.6M | 92% | High risk96 | Flagged0.021 |
| 25NC0015CONSTRUCTION OF ROAD, NRJ OSMEÑA-COMOTA-LYDIA ROAD, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 80% | High risk96 | Flagged0.020 |
| 25NC0005CONSTRUCTION OF HINATUAN-BUNAWAN-ROSARIO BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 97% | High risk96 | Flagged0.016 |
| 25NH0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK LANSONES I, BARANGAY SAN AGUSTIN, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 100% | High risk96 | Flagged0.013 |
| 24NH0024CONSTRUCTION OF TAGO RIVER IRRIGATION SYSTEM NEW DAVAO - SITIO ROAD, SAN MIGUEL, SURIGAO DEL SUR (KATUBIGAN - KALSADA TUNGO SA PATUBIGAN), SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱46.5M | 97% | High risk74 | Flagged0.010 |
| 25N00075CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE 13, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 100% | High risk94 | Flagged0.008 |
| 25NH0029SURIGAO-DAVAO COASTAL RD - K1284 + 805 - K1284 + 825, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱29.1M | 89% | High risk92 | Flagged0.008 |
| 24NH0013HABUYO BR. (B00646MN) ALONG SURIGAO-DAVAO COASTAL RD, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱16.7M | 100% | High risk74 | Flagged0.006 |
| 25NH0011CONST. OF FLOOD MITIGATION ALONG TANDAG RIVER, BRGY. QUEZON, TANDAG CITY, SURIGAO DEL SUR, PHASE 1 | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 88% | High risk88 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 19N00137WIDENING OF PERMANENT BRIDGES - TANDAG BR. (B00695MN) ALONG SURIGAO - DAVAO COASTAL RD (PHASE III), TANDAG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱125.4M | 100% | Medium risk50 | —-0.029 |
| 52 | 18N00036ROAD WIDENING, SURIGAO - DAVAO COASTAL RD- K1412+142 - K1414+000, K1431+365 - K1434+664, TAGBINA - HINATUAN, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱161.2M | 100% | Medium risk50 | —-0.057 |
| 53 | 18N00034WIDENING OF PERMANT BRIDGES, TANDAG BR. (B00695MN) ALONG SURIGAO - DAVAO COASTAL RD INCL. ROW (PHASE II), TANDAG SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱93.9M | 100% | Medium risk50 | —-0.031 |
| 54 | 23N00020BISLIG BR. (B00765MN) ALONG SURIGAO-DAVAO COASTAL RD | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk50 | —-0.021 |
| 55 | 22N00147CABADBARAN - PUTING BATO - LANUZA ROAD, PACKAGE 6, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk49 | —-0.039 |
| 56 | 17N00019COMPLETION OF THE EAST - WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR)-CALAITAN (BAYUGAN), PACKAGE 1, SURIGAO DEL SUR 1ST LD, REGION XIII, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk49 | —-0.024 |
| 57 | 22N00179CABADBARAN - PUTING BATO - LANUZA ROAD, PACKAGE 7, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk49 | —-0.039 |
| 58 | 23N00045CANTILAN-MADRID BYPASS ROAD (SDCR ALTERNATE ROUTE), SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱97.5M | 89% | Medium risk49 | —-0.001 |
| 59 | 21N00099CABADBARAN- PUTING BATO- LANUZA ROAD, PACKAGE 5, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱49.8M | 100% | Medium risk49 | —-0.047 |
| 60 | 22N00101CARAC-AN PARALLEL BR. ALONG SURIGAO- DAVAO COASTAL RD, MADRID, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk49 | —-0.035 |
| 61 | 18N00007CONSTRUCTION OF MISSING LINKS, COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR) - CALAITAN (BAYUGAN), (PACKAGE 2-3), SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk49 | —-0.068 |
| 62 | 20N00027TANDAG BR. (B00695MN) ALONG SURIGAO- DAVAO COASTAL RD (PHASE IV), TANDAG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk49 | —-0.029 |
| 63 | 19NH0030LANUZA BYPASS ROAD(SDCR ALTERNATE ROUTE), SURIGAO DEL SUR, LANUZA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱96.5M | 100% | Medium risk48 | —-0.044 |
| 64 | 17NH0028CONCRETING (EXISTING GRAVEL ROAD), BRGY. CABANGAHAN - BRGY. LOBO ROAD, CANTILAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.051 |
| 65 | 17N00066COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR) - CALAITAN (BAYUGAN), PACKAGE 2, SURIGAO DEL SUR 1ST LD, REGION XIII, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk48 | —-0.034 |
| 66 | 24N00098BISLIG PARALLEL BR. ALONG SURIGAO-DAVAO COASTAL RD | Region XIII | Region XIII | Completed | ₱121.4M | 100% | Medium risk48 | —-0.026 |
| 67 | 16N00037COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON-SAN MIGUEL PROPER (SURIGAO DEL SUR-CALAITAN BAYUGAN, MAHAYAG-SAGBAYAN SECTION), SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱48.1M | 100% | Medium risk48 | —-0.048 |
| 68 | 25N00166BISLIG PARALLEL BR. ALONG SURIGAO-DAVAO COASTAL RD | Region XIII | Region XIII | Completed | ₱93.6M | 100% | Medium risk48 | —-0.029 |
| 69 | 18DQ0041LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS ANDBRIDGES - LOCAL BRIDGES - WIDENING OF SANTA MARIA BRIDGE INCLUDINGAPPROACHES ALONG FRANCISCO BARZAGA ROAD, DASMARINAS CA | Region IV-A | Region IV-A | Terminated | ₱25.7M | 100% | Medium risk48 | —-0.011 |
| 70 | 22N00112CONSTRUCTION OF REVETMENT ALONG TELAJE RIVER, BRGY. DAGOCDOC, STA. 0+000.00- STA. 0+058.7, STA. 0+071.6 - STA. 0+460.20, STA. 0+460.20-STA. 0+496.00, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk48 | —-0.045 |
| 71 | 17N00089COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR)-CALAITAN (BAYUGAN), PACKAGE 3, SURIGAO DEL SUR 1ST LD, REGION XIII, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱96.5M | 100% | Medium risk48 | —-0.042 |
| 72 | 23N00143CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DOYOS RIVER, BRGY. DOYOS, CARRASCAL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱106.1M | 100% | Medium risk47 | —-0.055 |
| 73 | 17N00111COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON-SAN MIGUEL PROPER (SURIGAO DEL SUR-CALAITAN BAYUGAN, MAHAYAG-SAGBAYAN SECTION), SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱48.2M | 100% | Medium risk47 | —-0.048 |
| 74 | 18DQ0040LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENTOF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS ANDBRIDGES - LOCAL BRIDGES - WIDENING OF SAN LUIS BRIDGE AND FATIMABRIDGE INCLUDING APPROACHES ALONG FRANCISCO BARZAGA ROA | Region IV-A | Region IV-A | Terminated | ₱13M | 100% | Medium risk47 | —-0.012 |
| 75 | 19N00009CONSTRUCTION OF BYPASS/DIVERSION ROADS, TAGONGON-STA. MARIA-STA. JUANA-MAPUTI-DREAMLAND-BINGCONGAN-SAN ROQUE, PACKAGE B, BISLIG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk47 | —-0.061 |