Contractor dossier
173 projects on file, including joint ventures this contractor is part of.
Total projects
173
Total budget
₱17.1B
Average progress
97.4%
Completion rate
82.1%
Average risk score
51.2
Medium risk on average, out of 100
Flagged as unusual
20
11.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 170 | ₱17B | 51.3 | 20 | 97.3% |
| Region IV-A | 3 | ₱87.5M | 48.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 108 | ₱11.1B | 45.0 | 0 | 99.5% |
| Bridges | 20 | ₱1.8B | 47.7 | 0 | 99.4% |
| Flood Control and Drainage | 16 | ₱1.5B | 44.7 | 0 | 100.0% |
| GAA 2025 SSP | 11 | ₱1.1B | 95.4 | 11 | 84.3% |
| GAA 2025 OO-1 | 6 | ₱573.5M | 92.7 | 6 | 66.7% |
| Bridges, Roads | 5 | ₱633M | 50.7 | 0 | 100.0% |
| OTHER | 3 | ₱139.7M | 74.7 | 2 | 99.0% |
| GAA 2025 OO-2 | 2 | ₱143.6M | 85.8 | 1 | 92.8% |
| Buildings and Facilities | 2 | ₱53.6M | 38.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00058CONSTRUCTION OF STA. IRENE - SAN MIGUEL ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱187.3M | 98% | High risk96 | Flagged0.030 |
| 25NC0036CONSTRUCTION OF NRJ SARMIENTO, TRENTO - BISLIG BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.6M | 92% | High risk96 | Flagged0.021 |
| 25NC0015CONSTRUCTION OF ROAD, NRJ OSMEÑA-COMOTA-LYDIA ROAD, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 80% | High risk96 | Flagged0.020 |
| 25NC0005CONSTRUCTION OF HINATUAN-BUNAWAN-ROSARIO BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 97% | High risk96 | Flagged0.016 |
| 25NH0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱143.3M | 92% | High risk96 | Flagged0.025 |
| 25NH0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK LANSONES I, BARANGAY SAN AGUSTIN, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 100% | High risk96 | Flagged0.013 |
| 25N00243CONSTRUCTION OF STA. IRENE-SAN MIGUEL ROAD, (PACKAGE 4), SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱140.4M | 62% | High risk96 | Flagged0.034 |
| 25N00071CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD, BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱149.8M | 91% | High risk96 | Flagged0.034 |
| 25NH0012CONST. OF DAWIS SEAWALL, PHASE II, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 93% | High risk95 | Flagged0.025 |
| 25NH0007CONST. OF SEAWALL, BARANGAY BAGONG LUNGSOD, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 81% | High risk95 | Flagged0.028 |
| 25N00242CONSTRUCTION OF NRJ SANTIAGO - CANTILAN ROAD, PACKAGE 1, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱93.6M | 42% | High risk94 | Flagged0.031 |
| 25N00127EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR) - CALAITAN (BAYUGAN), PACKAGE 18, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.021 |
| 25N00075CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE 13, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 100% | High risk94 | Flagged0.008 |
| 25NI0055ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1397 + 428 - K1399 + 516 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱94.6M | 60% | High risk94 | Flagged0.024 |
| 25N00162STA. JOSEFA BR. (B00801MN) ALONG NRJ CUEVAS-SAMPAGUITA RD | Region XIII | Region XIII | On-Going | ₱234.1M | 82% | High risk93 | Flagged0.036 |
| 25NH0029SURIGAO-DAVAO COASTAL RD - K1284 + 805 - K1284 + 825, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱29.1M | 89% | High risk92 | Flagged0.008 |
| 25N00069TRENTO-LINGIG ROAD, TRENTO, PACKAGE 1, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱26.7M | 13% | High risk88 | Flagged0.035 |
| 25NH0011CONST. OF FLOOD MITIGATION ALONG TANDAG RIVER, BRGY. QUEZON, TANDAG CITY, SURIGAO DEL SUR, PHASE 1 | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 88% | High risk88 | Flagged0.000 |
| 25NH0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TANDAG RIVER, BARANGAY SAN AGUSTIN SUR, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.1M | 98% | High risk83 | —-0.006 |
| 21NI0061CONSTRUCTION OF BISLIG CITY COASTAL PROTECTION ALONG SURIGAO-DAVAO COASTAL RD, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱76.5M | 100% | High risk76 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00162STA. JOSEFA BR. (B00801MN) ALONG NRJ CUEVAS-SAMPAGUITA RD | Region XIII | Region XIII | On-Going | ₱234.1M | 82% | High risk93 | Flagged0.036 |
| 25N00069TRENTO-LINGIG ROAD, TRENTO, PACKAGE 1, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱26.7M | 13% | High risk88 | Flagged0.035 |
| 25N00243CONSTRUCTION OF STA. IRENE-SAN MIGUEL ROAD, (PACKAGE 4), SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱140.4M | 62% | High risk96 | Flagged0.034 |
| 25N00071CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD, BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱149.8M | 91% | High risk96 | Flagged0.034 |
| 25N00242CONSTRUCTION OF NRJ SANTIAGO - CANTILAN ROAD, PACKAGE 1, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱93.6M | 42% | High risk94 | Flagged0.031 |
| 25N00058CONSTRUCTION OF STA. IRENE - SAN MIGUEL ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱187.3M | 98% | High risk96 | Flagged0.030 |
| 25NH0007CONST. OF SEAWALL, BARANGAY BAGONG LUNGSOD, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 81% | High risk95 | Flagged0.028 |
| 25NH0012CONST. OF DAWIS SEAWALL, PHASE II, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 93% | High risk95 | Flagged0.025 |
| 25NH0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱143.3M | 92% | High risk96 | Flagged0.025 |
| 25NI0055ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1397 + 428 - K1399 + 516 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱94.6M | 60% | High risk94 | Flagged0.024 |
| 25N00127EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR) - CALAITAN (BAYUGAN), PACKAGE 18, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.021 |
| 25NC0036CONSTRUCTION OF NRJ SARMIENTO, TRENTO - BISLIG BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.6M | 92% | High risk96 | Flagged0.021 |
| 25NC0015CONSTRUCTION OF ROAD, NRJ OSMEÑA-COMOTA-LYDIA ROAD, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 80% | High risk96 | Flagged0.020 |
| 25NC0005CONSTRUCTION OF HINATUAN-BUNAWAN-ROSARIO BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 97% | High risk96 | Flagged0.016 |
| 25NH0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK LANSONES I, BARANGAY SAN AGUSTIN, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 100% | High risk96 | Flagged0.013 |
| 24NH0024CONSTRUCTION OF TAGO RIVER IRRIGATION SYSTEM NEW DAVAO - SITIO ROAD, SAN MIGUEL, SURIGAO DEL SUR (KATUBIGAN - KALSADA TUNGO SA PATUBIGAN), SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱46.5M | 97% | High risk74 | Flagged0.010 |
| 25N00075CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE 13, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 100% | High risk94 | Flagged0.008 |
| 25NH0029SURIGAO-DAVAO COASTAL RD - K1284 + 805 - K1284 + 825, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱29.1M | 89% | High risk92 | Flagged0.008 |
| 24NH0013HABUYO BR. (B00646MN) ALONG SURIGAO-DAVAO COASTAL RD, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱16.7M | 100% | High risk74 | Flagged0.006 |
| 25NH0011CONST. OF FLOOD MITIGATION ALONG TANDAG RIVER, BRGY. QUEZON, TANDAG CITY, SURIGAO DEL SUR, PHASE 1 | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 88% | High risk88 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 22N00182CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD, BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk45 | —-0.070 |
| 102 | 20N00032BUTUAN CITY- PIANING- TANDAG ROAD, PACKAGE 2, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱115.8M | 100% | Medium risk45 | —-0.071 |
| 103 | 19N00079CONSTRUCTION OF MISSING LINKS/ NEW ROADS - BUTUAN CITY - PIANING - TANDAG ROAD, PACKAGE 1, TANDAG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱115.8M | 100% | Medium risk45 | —-0.072 |
| 104 | 19N00078CONSTRUCTION OF MISSING LINKS/ NEW ROADS- CABADBARAN- PUTING BATO- LANUZA ROAD PACKAGE 2, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱106.1M | 100% | Medium risk44 | —-0.074 |
| 105 | 22N00146BUTUAN CITY - PIANING - TANDAG ROAD, PACKAGE 5, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk44 | —-0.070 |
| 106 | 19N00075CONSTRUCTION OF MISSING LINKS/NEW ROADS- CABADBARAN-PUTING BATO -LANUZA ROAD, PACKAGE 1, LANUZA, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱106.1M | 100% | Medium risk44 | —-0.074 |
| 107 | 21N00144EAST- WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR)- CALAITAN (BAYUGAN), PACKAGE 9, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱106.1M | 100% | Medium risk44 | —-0.072 |
| 108 | 20N00029EAST- WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR)- CALAITAN (BAYUGAN) PACKAGE 7, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱106.1M | 100% | Medium risk44 | —-0.073 |
| 109 | 22N00122EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR)- CALAITAN (BAYUGAN), PACKAGE 12, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk44 | —-0.074 |
| 110 | 22N00149CONSTRUCTION OF STA. IRENE - SAN MIGUEL ROAD, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk44 | —-0.074 |
| 111 | 25NI0028CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱93.5M | 100% | Medium risk44 | —-0.069 |
| 112 | 23NH0076REHABILITATION/RECONSTRUCTION OF ROADS WITH SLOPE PROTECTION AT CARRASCAL ROAD SECTION ALONG SDCR, K1209+406.36-K1209+613.83 IN CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱90.5M | 100% | Medium risk44 | —-0.080 |
| 113 | 23NH0031CONSTRUCTION OF ROAD, NRJ - PANGI, BRGY. PANGI, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱66.9M | 100% | Medium risk44 | —-0.050 |
| 114 | 25NI0024CONSTRUCTION OF HINATUAN - BUNAWAN - ROSARIO BYPASS ROAD, HINATUAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱93.6M | 100% | Medium risk44 | —-0.069 |
| 115 | 24N00090BISLIG CITY-SAN ISIDRO-SAN ANTONIO-SAN JOSE, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱91.7M | 100% | Medium risk43 | —-0.050 |
| 116 | 24N00058CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE 11, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱86.8M | 100% | Medium risk43 | —-0.077 |
| 117 | 18NH0063CONST. OF DIKE ALONG CARAC-AN RIVER UNDER CARAC-AN RIVER BASIN UPSTREAM (ABUTMENT B SIDE), MADRID,SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱88.6M | 100% | Medium risk43 | —-0.047 |
| 118 | 21NH0042CONSTRUCTION OF TANDAG FLOOD CONTROL, SAN AGUSTIN SUR, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱77.2M | 100% | Medium risk43 | —-0.057 |
| 119 | 23N00058CONSTRUCTION OF TRENTO-LINGIG BY-PASS ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱102.3M | 100% | Medium risk43 | —-0.066 |
| 120 | 23N00145EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR)- CALAITAN (BAYUGAN), PACKAGE 13, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱78.2M | 100% | Medium risk43 | —-0.078 |
| 121 | 23N00146EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR)- CALAITAN (BAYUGAN), PACKAGE 14, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱78.2M | 100% | Medium risk43 | —-0.078 |
| 122 | 19N00006CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-ROSARIO-MARFIL-TAGBINA RD, (TAGBINA SECTION), TAGBINA, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱101.6M | 100% | Medium risk43 | —-0.069 |
| 123 | 25N00150CARAC-AN PARALLEL BR. ALONG SURIGAO-DAVAO COASTAL RD | Region XIII | Region XIII | Completed | ₱46.8M | 100% | Medium risk43 | —-0.047 |
| 124 | 22N00077CONSTRUCTION OF TRENTO- LINGIG BY-PASS ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱101.3M | 100% | Medium risk43 | —-0.066 |
| 125 | 23N00137CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE 8, LANUZA, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱72.4M | 100% | Medium risk43 | —-0.077 |