Contractor dossier
173 projects on file, including joint ventures this contractor is part of.
Total projects
173
Total budget
₱17.1B
Average progress
97.4%
Completion rate
82.1%
Average risk score
51.2
Medium risk on average, out of 100
Flagged as unusual
20
11.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 170 | ₱17B | 51.3 | 20 | 97.3% |
| Region IV-A | 3 | ₱87.5M | 48.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 108 | ₱11.1B | 45.0 | 0 | 99.5% |
| Bridges | 20 | ₱1.8B | 47.7 | 0 | 99.4% |
| Flood Control and Drainage | 16 | ₱1.5B | 44.7 | 0 | 100.0% |
| GAA 2025 SSP | 11 | ₱1.1B | 95.4 | 11 | 84.3% |
| GAA 2025 OO-1 | 6 | ₱573.5M | 92.7 | 6 | 66.7% |
| Bridges, Roads | 5 | ₱633M | 50.7 | 0 | 100.0% |
| OTHER | 3 | ₱139.7M | 74.7 | 2 | 99.0% |
| GAA 2025 OO-2 | 2 | ₱143.6M | 85.8 | 1 | 92.8% |
| Buildings and Facilities | 2 | ₱53.6M | 38.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00058CONSTRUCTION OF STA. IRENE - SAN MIGUEL ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱187.3M | 98% | High risk96 | Flagged0.030 |
| 25NC0036CONSTRUCTION OF NRJ SARMIENTO, TRENTO - BISLIG BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.6M | 92% | High risk96 | Flagged0.021 |
| 25NC0015CONSTRUCTION OF ROAD, NRJ OSMEÑA-COMOTA-LYDIA ROAD, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 80% | High risk96 | Flagged0.020 |
| 25NC0005CONSTRUCTION OF HINATUAN-BUNAWAN-ROSARIO BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 97% | High risk96 | Flagged0.016 |
| 25NH0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱143.3M | 92% | High risk96 | Flagged0.025 |
| 25NH0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK LANSONES I, BARANGAY SAN AGUSTIN, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 100% | High risk96 | Flagged0.013 |
| 25N00243CONSTRUCTION OF STA. IRENE-SAN MIGUEL ROAD, (PACKAGE 4), SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱140.4M | 62% | High risk96 | Flagged0.034 |
| 25N00071CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD, BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱149.8M | 91% | High risk96 | Flagged0.034 |
| 25NH0012CONST. OF DAWIS SEAWALL, PHASE II, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 93% | High risk95 | Flagged0.025 |
| 25NH0007CONST. OF SEAWALL, BARANGAY BAGONG LUNGSOD, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 81% | High risk95 | Flagged0.028 |
| 25N00242CONSTRUCTION OF NRJ SANTIAGO - CANTILAN ROAD, PACKAGE 1, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱93.6M | 42% | High risk94 | Flagged0.031 |
| 25N00127EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR) - CALAITAN (BAYUGAN), PACKAGE 18, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.021 |
| 25N00075CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE 13, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 100% | High risk94 | Flagged0.008 |
| 25NI0055ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1397 + 428 - K1399 + 516 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱94.6M | 60% | High risk94 | Flagged0.024 |
| 25N00162STA. JOSEFA BR. (B00801MN) ALONG NRJ CUEVAS-SAMPAGUITA RD | Region XIII | Region XIII | On-Going | ₱234.1M | 82% | High risk93 | Flagged0.036 |
| 25NH0029SURIGAO-DAVAO COASTAL RD - K1284 + 805 - K1284 + 825, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱29.1M | 89% | High risk92 | Flagged0.008 |
| 25N00069TRENTO-LINGIG ROAD, TRENTO, PACKAGE 1, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱26.7M | 13% | High risk88 | Flagged0.035 |
| 25NH0011CONST. OF FLOOD MITIGATION ALONG TANDAG RIVER, BRGY. QUEZON, TANDAG CITY, SURIGAO DEL SUR, PHASE 1 | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 88% | High risk88 | Flagged0.000 |
| 25NH0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TANDAG RIVER, BARANGAY SAN AGUSTIN SUR, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.1M | 98% | High risk83 | —-0.006 |
| 21NI0061CONSTRUCTION OF BISLIG CITY COASTAL PROTECTION ALONG SURIGAO-DAVAO COASTAL RD, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱76.5M | 100% | High risk76 | —-0.015 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00162STA. JOSEFA BR. (B00801MN) ALONG NRJ CUEVAS-SAMPAGUITA RD | Region XIII | Region XIII | On-Going | ₱234.1M | 82% | High risk93 | Flagged0.036 |
| 25N00069TRENTO-LINGIG ROAD, TRENTO, PACKAGE 1, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱26.7M | 13% | High risk88 | Flagged0.035 |
| 25N00243CONSTRUCTION OF STA. IRENE-SAN MIGUEL ROAD, (PACKAGE 4), SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱140.4M | 62% | High risk96 | Flagged0.034 |
| 25N00071CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD, BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱149.8M | 91% | High risk96 | Flagged0.034 |
| 25N00242CONSTRUCTION OF NRJ SANTIAGO - CANTILAN ROAD, PACKAGE 1, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱93.6M | 42% | High risk94 | Flagged0.031 |
| 25N00058CONSTRUCTION OF STA. IRENE - SAN MIGUEL ROAD, AGUSAN DEL SUR | Region XIII | Region XIII | On-Going | ₱187.3M | 98% | High risk96 | Flagged0.030 |
| 25NH0007CONST. OF SEAWALL, BARANGAY BAGONG LUNGSOD, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 81% | High risk95 | Flagged0.028 |
| 25NH0012CONST. OF DAWIS SEAWALL, PHASE II, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 93% | High risk95 | Flagged0.025 |
| 25NH0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱143.3M | 92% | High risk96 | Flagged0.025 |
| 25NI0055ROAD WIDENING - SECONDARY ROADS - SURIGAO-DAVAO COASTAL RD - K1397 + 428 - K1399 + 516 | Region XIII | Surigao del Sur 2nd DEO | On-Going | ₱94.6M | 60% | High risk94 | Flagged0.024 |
| 25N00127EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAN MIGUEL PROPER (SURIGAO DEL SUR) - CALAITAN (BAYUGAN), PACKAGE 18, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 56% | High risk94 | Flagged0.021 |
| 25NC0036CONSTRUCTION OF NRJ SARMIENTO, TRENTO - BISLIG BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.6M | 92% | High risk96 | Flagged0.021 |
| 25NC0015CONSTRUCTION OF ROAD, NRJ OSMEÑA-COMOTA-LYDIA ROAD, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 80% | High risk96 | Flagged0.020 |
| 25NC0005CONSTRUCTION OF HINATUAN-BUNAWAN-ROSARIO BYPASS ROAD, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱47.5M | 97% | High risk96 | Flagged0.016 |
| 25NH0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK LANSONES I, BARANGAY SAN AGUSTIN, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱48.5M | 100% | High risk96 | Flagged0.013 |
| 24NH0024CONSTRUCTION OF TAGO RIVER IRRIGATION SYSTEM NEW DAVAO - SITIO ROAD, SAN MIGUEL, SURIGAO DEL SUR (KATUBIGAN - KALSADA TUNGO SA PATUBIGAN), SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱46.5M | 97% | High risk74 | Flagged0.010 |
| 25N00075CABADBARAN-PUTING BATO-LANUZA ROAD, PACKAGE 13, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱94.6M | 100% | High risk94 | Flagged0.008 |
| 25NH0029SURIGAO-DAVAO COASTAL RD - K1284 + 805 - K1284 + 825, CORTES, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱29.1M | 89% | High risk92 | Flagged0.008 |
| 24NH0013HABUYO BR. (B00646MN) ALONG SURIGAO-DAVAO COASTAL RD, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱16.7M | 100% | High risk74 | Flagged0.006 |
| 25NH0011CONST. OF FLOOD MITIGATION ALONG TANDAG RIVER, BRGY. QUEZON, TANDAG CITY, SURIGAO DEL SUR, PHASE 1 | Region XIII | Surigao del Sur 1st DEO | On-Going | ₱95.5M | 88% | High risk88 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 24NH0033NASIPIT BR. (B00647MN) ALONG SURIGAO - DAVAO COASTAL RD | Region XIII | Surigao del Sur 1st DEO | Completed | ₱32.3M | 100% | Medium risk41 | —-0.046 |
| 152 | 23NI0036CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱86.8M | 100% | Medium risk41 | —-0.070 |
| 153 | 22NH0090ROAD FROM BARANGAY KINABIGTASAN TO BARANGAY LINDOY IN SUPPORT TO LUMBER INDUSTRY, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱56.3M | 100% | Medium risk41 | —-0.074 |
| 154 | 21NI0056CONSTRUCTION OF SAN ROQUE, BISLIG TO BUNAWAN BY-PASS ROAD, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱77.2M | 100% | Medium risk41 | —-0.071 |
| 155 | 21NI0059CONSTRUCTION OF LINGIG, SURIGAO DEL SUR TO TRENTO, AGUSAN DEL SUR BYPASS ROAD (UNION -BOGAC -RAJAH CABUNGSUAN -NAPANPANAN -SITIO LUNA), SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱77.2M | 100% | Medium risk41 | —-0.069 |
| 156 | 23NI0055CONSTRUCTION OF LINGIG, SURIGAO DEL SUR TO TRENTO, AGUSAN DEL SUR BY-PASS ROAD (UNION-BOGAK-RAJAH CABUNGSO-AN-NAPANPANAN-SITIO LUNA), LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱77.2M | 100% | Medium risk41 | —-0.070 |
| 157 | 21NH0034CONSTRUCTION OF SEAWALL, PUROK DANAO, BARANGAY AROROGAN, MARIHATAG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱59.8M | 100% | Medium risk41 | —-0.055 |
| 158 | 23N00151BISLIG CITY - SAN ISIDRO - SAN ANTONIO - SAN JOSE, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱91.7M | 100% | Medium risk40 | —-0.068 |
| 159 | 23NH0041CONSTRUCTION OF BONGTUD SEAWALL, TANDAG SEAWALL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱57.9M | 100% | Medium risk40 | —-0.059 |
| 160 | 21NC0056CONSTRUCTION OF TRENTO-LINGIG BYPASS ROAD, TRENTO, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | Completed | ₱48.2M | 100% | Medium risk40 | —-0.074 |
| 161 | 23N00138CABADBARAN - PUTING BATO - LANUZA ROAD, PACKAGE 9, LANUZA, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱39.6M | 100% | Medium risk39 | —-0.080 |
| 162 | 25NI0025CONSTRUCTION OF BISLIG - TRENTO BYPASS ROAD, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱46.8M | 100% | Medium risk39 | —-0.074 |
| 163 | 18NI0015CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-NRJ - CUMAWAS - TINUY-AN FALLS ROAD, BORBOANAN, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱49M | 100% | Medium risk39 | —-0.075 |
| 164 | 19N00118CONSTRUCTION OF MISSING LINKS/ NEW ROADS-EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ AGUSAN DEL NORTE TO BUKIDNON SAN MIGUEL PROPER (SURIGAO DEL SUR)- CALAITAN (BAYUGAN), PACKAGE 6, SAN MIGUEL, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱38.6M | 100% | Medium risk39 | —-0.082 |
| 165 | 23NH0045CONSTRUCTION OF DIKE ALONG TAGO RIVER BASIN, BRGY. ANAHAO, TAGO, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱49M | 100% | Medium risk39 | —-0.061 |
| 166 | 23N00087BUTUAN CITY-PIANING-TANDAG ROAD, PACKAGE 8, TANDAG CITY, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱39.6M | 100% | Medium risk39 | —-0.079 |
| 167 | 24NI0053CONSTRUCTION OF BAROBO - SAN FRANCISCO BYPASS ROAD, BAROBO , SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱38.2M | 100% | Medium risk38 | —-0.078 |
| 168 | 25N00128BUTUAN CITY-PIANING-TANDAG ROAD, PACKAGE 12, SURIGAO DEL SUR | Region XIII | Region XIII | On-Going | ₱18.7M | 79% | Medium risk38 | —-0.045 |
| 169 | 20NI0042CONSTRUCTION OF JCT. HIGHWAY MALIXI-MANAMBIA-SORIANO-JCT. BAHI BY - PASS ROAD, TAGBINA, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱14.3M | 100% | Medium risk38 | —-0.071 |
| 170 | 20NI0072CONCRETING OF TAGONGON - STA MARIA - STA JUANA - MAPUTI - DREAMLAND - BINGCONGAN - SAN ROQUE BYPASS ROAD, HINATUAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱44.1M | 100% | Medium risk37 | —-0.075 |
| 171 | 24NI0043CONSTRUCTION OF HINATUAN-BUNAWAN -ROSARIO BYPASS ROAD, HINATUAN, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱29.4M | 100% | Medium risk37 | —-0.075 |
| 172 | 25NI0031CONSTRUCTION OF ROAD, LINGIG, SURIGAO DEL SUR TO TRENTO, AGUSAN DEL SUR BYPASS ROAD(UNION-BOGAK-RAJAH CABUNGSO-AN-NAPANPANAN-SITIO LUNA), PACKAGE A, LINGIG, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱14.3M | 100% | Medium risk36 | —-0.072 |
| 173 | 25NH0042CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BAYBAY, CARRASCAL, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱4.9M | 100% | Medium risk35 | —-0.077 |