Contractor dossier
57 projects on file, including joint ventures this contractor is part of.
Total projects
57
Total budget
₱2.4B
Average progress
89.8%
Completion rate
64.9%
Below 70%
Average risk score
58.1
Medium risk on average, out of 100
Flagged as unusual
3
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 57 | ₱2.4B | 58.1 | 3 | 89.8% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 39 | ₱1.4B | 57.6 | 1 | 92.2% |
| Bridges | 7 | ₱353.1M | 52.4 | 0 | 96.5% |
| OTHER | 4 | ₱377.6M | 71.1 | 1 | 80.0% |
| Buildings and Facilities | 3 | ₱25.7M | 56.9 | 0 | 96.4% |
| Bridges, Roads | 2 | ₱184.4M | 61.2 | 0 | 69.0% |
| Flood Control and Drainage | 2 | ₱53.8M | 59.9 | 1 | 50.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19DF0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM,NETWORK DEVELOPMENT, CONSTRUCTION OF MISSING LINKS/NEW ROADS-GENERALAGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), AMADEO SECTION,CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 20% | High risk73 | Flagged0.054 |
| 25DF0086CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DAINE I, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱5.9M | 89% | High risk73 | —-0.038 |
| 20DF0178LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF INDANG-CABUCO-NAIC DIVERSION ROAD, TRECE MARTIRES CITY | Region IV-A | Cavite 1st DEO | Completed | ₱94.6M | 100% | High risk72 | —-0.017 |
| 18DF0092LOCAL PROGRAM -CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REMULLA AVENUE CONNECTION ROAD TO TRES CRUSES, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱137.5M | 100% | High risk71 | —-0.018 |
| 25DF0122CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY LIMBON, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | High risk71 | Flagged0.001 |
| 24DF0128ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0060 + (-318) - K0060 + 728 | Region IV-A | Cavite 1st DEO | On-Going | ₱56.2M | 0% | High risk71 | —-0.003 |
| 24DF0126ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - TERTIARY ROADSINDANG-ALFONSO VIA LUKSUHIN RD - K0060 + 084- K0061 + 097 | Region IV-A | Cavite 1st DEO | On-Going | ₱52.9M | 90% | High risk70 | —-0.032 |
| 25DF0063ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY RDSTANZA-TRECE MARTIRES CITY-INDANG RD - K0058 + 000 - K0059 + 137 | Region IV-A | Cavite 1st DEO | Completed | ₱50.3M | 100% | High risk70 | —-0.069 |
| 25DF0058ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0041 + 000 - K0042 + 338 | Region IV-A | Cavite 1st DEO | Completed | ₱55.1M | 100% | High risk70 | —-0.067 |
| 20DF0084CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, CALIBUYO ROAD LEADING TO CAVITE GATEWAY TERMINAL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | High risk68 | —-0.041 |
| 25DF0179ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - TERTIARY ROADSINDANG-ALFONSO VIA LUKSUHIN RD - K0056 + 154 - K0056 + 262, K0058 + 558 - K0058 + 735, K0058 + 746 - K0059 + 000 | Region IV-A | Cavite 1st DEO | On-Going | ₱38M | 100% | High risk67 | —-0.053 |
| 25DF0012ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0071 + 398 - K0072 + 306 | Region IV-A | Cavite 1st DEO | Completed | ₱30.4M | 100% | High risk67 | —-0.071 |
| 25DF0042ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - TERTIARY ROADSCRISANTO M. DE LOS REYES AVE - K0056 + 607 - K0057 + 506 | Region IV-A | Cavite 1st DEO | Completed | ₱32.9M | 100% | High risk67 | —-0.071 |
| 24DF0037ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAMOFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0067 + 896 - K0069 + 767 | Region IV-A | Cavite 1st DEO | On-Going | ₱16.3M | 0% | High risk67 | —-0.005 |
| 24DF0084ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMCONST/ UPGRADING/ REHAB OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS TANZA-TRECE MARTIRES CITY-INDANG RD - K0052 + (-385) -K0052+562 | Region IV-A | Cavite 1st DEO | On-Going | ₱26.4M | 50% | High risk67 | —-0.019 |
| 24DF0122ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0053 + 802 - K0053 + 963, K0057 + 573 - K0058 + 000 | Region IV-A | Cavite 1st DEO | On-Going | ₱19.2M | 100% | High risk67 | —-0.039 |
| 25DF0108ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0064 + 669 - K0065 + 313 | Region IV-A | Cavite 1st DEO | On-Going | ₱16.8M | 100% | High risk67 | —-0.051 |
| 25DF0040ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSJUANITO R. REMULLA, SR. RD - K0043 + 093 - K0043 + 434 | Region IV-A | Cavite 1st DEO | On-Going | ₱17M | 100% | High risk67 | —-0.052 |
| 24DF0048ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0038 + 770 - K0039 + 606 | Region IV-A | Cavite 1st DEO | Completed | ₱16.5M | 100% | High risk67 | —-0.070 |
| 25DF0009ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0046 + 189 - K0046 + 761 | Region IV-A | Cavite 1st DEO | Completed | ₱22.2M | 100% | High risk67 | —-0.070 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19DF0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM,NETWORK DEVELOPMENT, CONSTRUCTION OF MISSING LINKS/NEW ROADS-GENERALAGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), AMADEO SECTION,CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 20% | High risk73 | Flagged0.054 |
| 22DF0362OPENING AND CONCRETING OF BRGY. KAYQUIT I TO BRGY. KAYQUIT III FMR, BRGY. KAYQUIT I AND KAYQUIT III, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | Terminated | ₱15.8M | 100% | High risk65 | Flagged0.011 |
| 25DF0122CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY LIMBON, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | High risk71 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 19DF0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM,NETWORK DEVELOPMENT, CONSTRUCTION OF MISSING LINKS/NEW ROADS-GENERALAGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), AMADEO SECTION,CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱96.5M | 20% | High risk73 | Flagged0.054 |
| 2 | 25DF0086CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DAINE I, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱5.9M | 89% | High risk73 | —-0.038 |
| 3 | 20DF0178LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF INDANG-CABUCO-NAIC DIVERSION ROAD, TRECE MARTIRES CITY | Region IV-A | Cavite 1st DEO | Completed | ₱94.6M | 100% | High risk72 | —-0.017 |
| 4 | 18DF0092LOCAL PROGRAM -CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REMULLA AVENUE CONNECTION ROAD TO TRES CRUSES, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱137.5M | 100% | High risk71 | —-0.018 |
| 5 | 25DF0122CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIESCONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY LIMBON, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 0% | High risk71 | Flagged0.001 |
| 6 | 24DF0128ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0060 + (-318) - K0060 + 728 | Region IV-A | Cavite 1st DEO | On-Going | ₱56.2M | 0% | High risk71 | —-0.003 |
| 7 | 24DF0126ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - TERTIARY ROADSINDANG-ALFONSO VIA LUKSUHIN RD - K0060 + 084- K0061 + 097 | Region IV-A | Cavite 1st DEO | On-Going | ₱52.9M | 90% | High risk70 | —-0.032 |
| 8 | 25DF0063ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY RDSTANZA-TRECE MARTIRES CITY-INDANG RD - K0058 + 000 - K0059 + 137 | Region IV-A | Cavite 1st DEO | Completed | ₱50.3M | 100% | High risk70 | —-0.069 |
| 9 | 25DF0058ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0041 + 000 - K0042 + 338 | Region IV-A | Cavite 1st DEO | Completed | ₱55.1M | 100% | High risk70 | —-0.067 |
| 10 | 20DF0084CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, CALIBUYO ROAD LEADING TO CAVITE GATEWAY TERMINAL, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | High risk68 | —-0.041 |
| 11 | 25DF0179ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - TERTIARY ROADSINDANG-ALFONSO VIA LUKSUHIN RD - K0056 + 154 - K0056 + 262, K0058 + 558 - K0058 + 735, K0058 + 746 - K0059 + 000 | Region IV-A | Cavite 1st DEO | On-Going | ₱38M | 100% | High risk67 | —-0.053 |
| 12 | 25DF0012ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0071 + 398 - K0072 + 306 | Region IV-A | Cavite 1st DEO | Completed | ₱30.4M | 100% | High risk67 | —-0.071 |
| 13 | 25DF0042ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - TERTIARY ROADSCRISANTO M. DE LOS REYES AVE - K0056 + 607 - K0057 + 506 | Region IV-A | Cavite 1st DEO | Completed | ₱32.9M | 100% | High risk67 | —-0.071 |
| 14 | 24DF0037ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAMOFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0067 + 896 - K0069 + 767 | Region IV-A | Cavite 1st DEO | On-Going | ₱16.3M | 0% | High risk67 | —-0.005 |
| 15 | 24DF0084ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMCONST/ UPGRADING/ REHAB OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS TANZA-TRECE MARTIRES CITY-INDANG RD - K0052 + (-385) -K0052+562 | Region IV-A | Cavite 1st DEO | On-Going | ₱26.4M | 50% | High risk67 | —-0.019 |
| 16 | 24DF0122ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0053 + 802 - K0053 + 963, K0057 + 573 - K0058 + 000 | Region IV-A | Cavite 1st DEO | On-Going | ₱19.2M | 100% | High risk67 | —-0.039 |
| 17 | 25DF0108ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0064 + 669 - K0065 + 313 | Region IV-A | Cavite 1st DEO | On-Going | ₱16.8M | 100% | High risk67 | —-0.051 |
| 18 | 25DF0040ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSJUANITO R. REMULLA, SR. RD - K0043 + 093 - K0043 + 434 | Region IV-A | Cavite 1st DEO | On-Going | ₱17M | 100% | High risk67 | —-0.052 |
| 19 | 24DF0048ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0038 + 770 - K0039 + 606 | Region IV-A | Cavite 1st DEO | Completed | ₱16.5M | 100% | High risk67 | —-0.070 |
| 20 | 25DF0009ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - PRIMARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0046 + 189 - K0046 + 761 | Region IV-A | Cavite 1st DEO | Completed | ₱22.2M | 100% | High risk67 | —-0.070 |
| 21 | 25DF0033ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSTANZA-TRECE MARTIRES CITY-INDANG RD - K0055 + 756 - K0056 + 828 | Region IV-A | Cavite 1st DEO | Completed | ₱27.3M | 100% | High risk67 | —-0.070 |
| 22 | 24DF0035ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - SECONDARY ROADS NOVELETA-NAIC-TAGAYTAY RD - K0072 + 306 - K0072 + 709 | Region IV-A | Cavite 1st DEO | Completed | ₱13.4M | 100% | High risk67 | —-0.070 |
| 23 | 23D00043CONSTRUCTION OF MISSING LINKS / NEW ROADSGENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD(EAST - WEST ROAD), INDANG - WEST SECTION, CAVITE | Region IV-A | Region IV-A | On-Going | ₱96.5M | 70% | High risk66 | —-0.022 |
| 24 | 22DF0362OPENING AND CONCRETING OF BRGY. KAYQUIT I TO BRGY. KAYQUIT III FMR, BRGY. KAYQUIT I AND KAYQUIT III, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | Terminated | ₱15.8M | 100% | High risk65 | Flagged0.011 |
| 25 | 21DF0085LOCAL PROGRAMCONST. / REPAIR / REHAB. / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTSLOCAL ROADS AND BRIDGESLOCAL BRIDGECONSTRUCTION OF SAHUD ULAN BRIDGE ALONG SAHUD ULAN-TRES CRUSES-TMC ROAD, BARANGAY TRES CRUSES SECTION, TANZA, | Region IV-A | Cavite 1st DEO | Completed | ₱93.6M | 100% | High risk64 | —-0.054 |