Contractor dossier
15 projects on file, including joint ventures this contractor is part of.
Total projects
15
Total budget
₱213.9M
Average progress
92.7%
Completion rate
80.0%
Average risk score
45.0
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 15 | ₱213.9M | 45.0 | 0 | 92.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 9 | ₱108.9M | 43.1 | 0 | 88.9% |
| Flood Control and Drainage | 3 | ₱69.9M | 45.5 | 0 | 100.0% |
| OTHER | 1 | ₱11.6M | 57.3 | 0 | 89.9% |
| Bridges | 1 | ₱9.4M | 46.7 | 0 | 100.0% |
| Roads | 1 | ₱14.1M | 45.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24OB0165CONSTRUCTION OF BRIDGE ALONG PALINGON RIVER, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱11.6M | 90% | Medium risk57 | —-0.005 |
| 2 | 24OB0390CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (JUSTICE HALL EXTENSION), BRGY. CENTRAL BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱22.8M | 0% | Medium risk49 | —-0.021 |
| 3 | 24OB0459REHABILITATION MARIKINA POLYTECHNIC COLLEGE INCLUDING FACILITIES PHASE II, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19.5M | 100% | Medium risk49 | —-0.102 |
| 4 | 24OB0318REHABILITATION OF METRO MANILA 1ST DISTRICT ENGINEERING OFFICE BUILDING, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19.2M | 100% | Medium risk48 | —-0.103 |
| 5 | 25OB0377COMPLETION OF MULTI PURPOSE BUILDING, MARIETTA ROMEO VILLAGE, BRGY STA. LUCIA, PASIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.7M | 100% | Medium risk48 | —-0.070 |
| 6 | 23OB0378CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (PATEROS SPORTS COMPLEX), BRGY. SAN PEDRO, PATEROS | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.3M | 100% | Medium risk48 | —-0.102 |
| 7 | 24OB0487CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), ROCKYSIDE, BRGY. BAGUMBAYAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱12.7M | 100% | Medium risk48 | —-0.102 |
| 8 | 24OB0485COMPLETION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), KATWIRAN, BRGY. IBAYO-TIPAS, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.103 |
| 9 | 25OB0216RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - BARANGKA VIADUCT (FLYOVER) (B01720LZ) ALONG A BONIFACIO AVE | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.4M | 100% | Medium risk47 | —-0.066 |
| 10 | 23OB0342CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM AT QUIRINO ST., BARANGAY SOUTH SIGNAL, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.1M | 100% | Medium risk46 | —-0.098 |
| 11 | 23OB0346CONSTRUCTION OF DRAINAGE SYSTEM AT STO NIÑO AVE FROM COR. MRT AVE. TO LIBIS STREET ZONE 5, BARANGAY CENTRAL SIGNAL, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14M | 100% | Medium risk46 | —-0.088 |
| 12 | 25OB0174CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ALFREDO STREET, BARANGAY LOWER BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱14.1M | 100% | Medium risk46 | —-0.089 |
| 13 | 23OB0036CONSTRUCTION OF BOX CULVERT RAINBOW STREET, BARANGAY CONCEPCION DOS, MARIKINA CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱41.9M | 100% | Medium risk45 | —-0.085 |
| 14 | 24OB0411CONSTRUCTION OF MULTI-PURPOSE BUILDING (COMPLETION), BRGY. SAN MIGUEL, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.100 |
| 15 | 24OB0378COMPLETION OF MULTIPURPOSE BUILDING, BRGY. SUMILANG, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.098 |