Contractor dossier
40 projects on file, including joint ventures this contractor is part of.
Total projects
40
Total budget
₱1.5B
Average progress
92.4%
Completion rate
77.5%
Average risk score
57.7
Medium risk on average, out of 100
Flagged as unusual
8
20.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 31 | ₱1B | 57.6 | 4 | 93.9% |
| Region I | 9 | ₱482.1M | 58.4 | 4 | 87.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 21 | ₱802.6M | 47.5 | 1 | 95.0% |
| GAA 2025 SSP | 4 | ₱43.1M | 94.1 | 4 | 81.1% |
| OTHER | 4 | ₱340.6M | 78.3 | 2 | 79.1% |
| Buildings and Facilities | 4 | ₱112.7M | 49.6 | 0 | 100.0% |
| Flood Control and Drainage | 3 | ₱116.8M | 48.3 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱15.3M | 83.7 | 0 | 100.0% |
| Bridges | 2 | ₱91.2M | 55.4 | 1 | 80.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AF0123CONSTRUCTION OF SCHOOL BUILDING SAN LUIS NATIONAL HIGH SCHOOL, BRGY. SAN LUIS, PUGO, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱14.4M | 88% | High risk95 | Flagged0.015 |
| 25PD0080BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY SANTO ROSARIO, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱14.3M | 78% | High risk94 | Flagged0.015 |
| 25PD0069BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION (COMPLETION) OF BARANGAY MULTI-PURPOSE BUILDING AT SALUD MITRA BARANGAY, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱9.6M | 69% | High risk94 | Flagged0.016 |
| 25PD0070BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT LEONILA HILL, BARANGAY WEST BAYAN PARK, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱4.9M | 90% | High risk94 | Flagged0.012 |
| 24PL0122CONSTRUCTION OF 3STY9CL, MALAGNAT NATIONAL HIGH SCHOOL, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱34.3M | 81% | High risk88 | Flagged0.054 |
| 25PD0025REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS-QUEZON HILL RD # 1 K0308+470-K0308+680 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱8.7M | 100% | High risk86 | —-0.029 |
| 25PD0026REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS: GIBRALTAR RD., K0252+536-K0252+626 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱6.6M | 100% | High risk82 | —-0.028 |
| 24A00041CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BAUANG - SAN FERNANDO - SAN JUAN BY-PASS ROAD (BAUANG SECTION), PACKAGE 3, LA UNION | Region I | Region I | On-Going | ₱270.2M | 36% | High risk80 | Flagged0.054 |
| 18PE0027RECONSTRUCTION FROM PAVED TO CONCRETE - P.A. CADRE ROAD - (00402LZ) CHAIN. 0-CHAIN. 234, (S00405LZ) CHAIN. 0-CHAIN. 465, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱15.3M | 100% | High risk73 | —-0.027 |
| 17PI0019ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4), SECONDARY ROADS, MT. PROVINCE-ILOCOS SUR VIA T | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱20.8M | 100% | High risk72 | —-0.027 |
| 23AF0067CONCRETING OF BGRY. PALINA FMR, BRGY. PALINA, PUIGO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱12.4M | 100% | High risk72 | Flagged0.005 |
| 17PF0020CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS - TO DECLARED TOURISM DESTINATIONS: MANGKINGAO - AM-AM VIA MASCA SAYAPOT ROAD LEADING TO AM-AM OBSERVATORY ROCK, BURIAL CAVE, CADA FARM AND KENNY | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱75.9M | 100% | High risk63 | —-0.038 |
| 17PE0023REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG BAGUIO-BONTOC ROAD, K0257+050 -K0257+104, K0257+288 - K0257+932, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱19.5M | 100% | High risk60 | —-0.050 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00041CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BAUANG - SAN FERNANDO - SAN JUAN BY-PASS ROAD (BAUANG SECTION), PACKAGE 3, LA UNION | Region I | Region I | On-Going | ₱270.2M | 36% | High risk80 | Flagged0.054 |
| 24PL0122CONSTRUCTION OF 3STY9CL, MALAGNAT NATIONAL HIGH SCHOOL, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱34.3M | 81% | High risk88 | Flagged0.054 |
| 25PD0069BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION (COMPLETION) OF BARANGAY MULTI-PURPOSE BUILDING AT SALUD MITRA BARANGAY, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱9.6M | 69% | High risk94 | Flagged0.016 |
| 25AF0123CONSTRUCTION OF SCHOOL BUILDING SAN LUIS NATIONAL HIGH SCHOOL, BRGY. SAN LUIS, PUGO, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱14.4M | 88% | High risk95 | Flagged0.015 |
| 25PD0080BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY SANTO ROSARIO, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱14.3M | 78% | High risk94 | Flagged0.015 |
| 25PD0070BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT LEONILA HILL, BARANGAY WEST BAYAN PARK, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱4.9M | 90% | High risk94 | Flagged0.012 |
| 25AF0057BASIC INFRASTRUCTURE PROGRAM (BIP) - CONST. OF BAUANG BRIDGE, BAUANG, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱14M | 62% | Medium risk58 | Flagged0.008 |
| 23AF0067CONCRETING OF BGRY. PALINA FMR, BRGY. PALINA, PUIGO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱12.4M | 100% | High risk72 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25AF0123CONSTRUCTION OF SCHOOL BUILDING SAN LUIS NATIONAL HIGH SCHOOL, BRGY. SAN LUIS, PUGO, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱14.4M | 88% | High risk95 | Flagged0.015 |
| 2 | 25PD0080BASIC INFRASTRUCTURE PROGRAM (BIP) CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY SANTO ROSARIO, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱14.3M | 78% | High risk94 | Flagged0.015 |
| 3 | 25PD0069BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION (COMPLETION) OF BARANGAY MULTI-PURPOSE BUILDING AT SALUD MITRA BARANGAY, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱9.6M | 69% | High risk94 | Flagged0.016 |
| 4 | 25PD0070BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT LEONILA HILL, BARANGAY WEST BAYAN PARK, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | On-Going | ₱4.9M | 90% | High risk94 | Flagged0.012 |
| 5 | 24PL0122CONSTRUCTION OF 3STY9CL, MALAGNAT NATIONAL HIGH SCHOOL, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | On-Going | ₱34.3M | 81% | High risk88 | Flagged0.054 |
| 6 | 25PD0025REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS-QUEZON HILL RD # 1 K0308+470-K0308+680 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱8.7M | 100% | High risk86 | —-0.029 |
| 7 | 25PD0026REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS: GIBRALTAR RD., K0252+536-K0252+626 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱6.6M | 100% | High risk82 | —-0.028 |
| 8 | 24A00041CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BAUANG - SAN FERNANDO - SAN JUAN BY-PASS ROAD (BAUANG SECTION), PACKAGE 3, LA UNION | Region I | Region I | On-Going | ₱270.2M | 36% | High risk80 | Flagged0.054 |
| 9 | 18PE0027RECONSTRUCTION FROM PAVED TO CONCRETE - P.A. CADRE ROAD - (00402LZ) CHAIN. 0-CHAIN. 234, (S00405LZ) CHAIN. 0-CHAIN. 465, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱15.3M | 100% | High risk73 | —-0.027 |
| 10 | 17PI0019ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4), SECONDARY ROADS, MT. PROVINCE-ILOCOS SUR VIA T | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱20.8M | 100% | High risk72 | —-0.027 |
| 11 | 23AF0067CONCRETING OF BGRY. PALINA FMR, BRGY. PALINA, PUIGO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱12.4M | 100% | High risk72 | Flagged0.005 |
| 12 | 17PF0020CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS - TO DECLARED TOURISM DESTINATIONS: MANGKINGAO - AM-AM VIA MASCA SAYAPOT ROAD LEADING TO AM-AM OBSERVATORY ROCK, BURIAL CAVE, CADA FARM AND KENNY | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱75.9M | 100% | High risk63 | —-0.038 |
| 13 | 17PE0023REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE ALONG BAGUIO-BONTOC ROAD, K0257+050 -K0257+104, K0257+288 - K0257+932, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱19.5M | 100% | High risk60 | —-0.050 |
| 14 | 25AF0057BASIC INFRASTRUCTURE PROGRAM (BIP) - CONST. OF BAUANG BRIDGE, BAUANG, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱14M | 62% | Medium risk58 | Flagged0.008 |
| 15 | 22P00029ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, POBLACION JCT. - BATUANG - CARANTES JCT. - BALATOC JCT | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱151.5M | 94% | Medium risk58 | —-0.009 |
| 16 | 18PF0035ASSET PRESERVATION PREVENTIVE MAINTENANCE ALONG SECONDARY ROAD - BAGUIO-BONTOC ROAD, K0296+933 - K0297+600, K0297+900 - K0298+400, K0298+907 - K0299+126, K0299+750 - K0299+820, K0302+121 - K0302+487, K0302+660 - K0303+073, K0303+180 - K0303+210, K0304+6 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱94.3M | 100% | Medium risk58 | —-0.069 |
| 17 | 22PE0161REPLACEMENT OF PINES PARK BRIDGE FROM TEMPORARY TO PERMANENT - PINES PARK VEHICULAR BRIDGE, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.035 |
| 18 | 22PD0009NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY: QUIRINO H-WAY (BAGUIO-BAUANG)-K0304+884-K0305+286 | Cordillera Administrative Region | Baguio City DEO | Completed | ₱67.6M | 100% | Medium risk51 | —-0.078 |
| 19 | 22PE0015RECONSTRUCTION TO CONCRETE PAVEMENT ALONG SHILAN-BECKEL RD (S000385LZ) - K0262+056-K0262+284.5, K0262+355.5-K0262+780, K0264+925-K0265+943, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱63.7M | 100% | Medium risk51 | —-0.080 |
| 20 | 22PE0013CONSTRUCTION OF REGIONAL CRIME LABORATORY OFFICE (RCLO-COR) BUILDING, CAMP MAJOR BADO DANGWA, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱39.2M | 100% | Medium risk50 | —-0.075 |
| 21 | 18P00047PROPOSED EVACUATION CENTER, POBLACION, BAUKO, MT. PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱34.2M | 100% | Medium risk50 | —-0.071 |
| 22 | 19PL0058CONTINUATION OF CAPEGAN FLOOD CONTROL ALONG SALTAN RIVER, BRGY. JUNCTION, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱19.6M | 100% | Medium risk50 | —-0.060 |
| 23 | 22PE0124CONSTRUCTION OF REGIONAL HIGHWAY PATROL UNIT - CORDILLERA (RHPU-COR) BUILDING, LONGLONG ROAD, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱29.4M | 100% | Medium risk50 | —-0.075 |
| 24 | 24PD0059BASIC INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SALUD MITRA, BAGUIO CITY | Cordillera Administrative Region | Baguio City DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.080 |
| 25 | 24A00258CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ARINGAY RIVER BASIN, BARANGAY HALOG WEST, TUBAO, LA UNION | Region I | Region I | Completed | ₱48.2M | 100% | Medium risk48 | —-0.068 |