Contractor dossier
3 projects on file, including joint ventures this contractor is part of.
Total projects
3
Total budget
₱131M
Average progress
95.1%
Completion rate
66.7%
Below 70%
Average risk score
47.2
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 3 | ₱131M | 47.2 | 0 | 95.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 2 | ₱124.5M | 54.9 | 0 | 92.7% |
| Buildings and Facilities | 1 | ₱6.6M | 31.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CP0037FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG MAASIM RIVER, PUROK 1, BRGY. CASALAT, SAN ILDEFONSO, BULACAN (SEGMENT B) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 85% | High risk81 | —-0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CP0037FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG MAASIM RIVER, PUROK 1, BRGY. CASALAT, SAN ILDEFONSO, BULACAN (SEGMENT B) | Region III | Bulacan 3rd DEO | On-Going | ₱95.1M | 85% | High risk81 | —-0.022 |
| 2 | 25CG0051BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), MALINO ES, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱6.6M | 100% | Medium risk32 | —-0.105 |
| 3 | 25CH0024CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SANTA MONICA, SASMUAN, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱29.4M | 100% | Low risk29 | —-0.091 |