Contractor dossier
252 projects on file, including joint ventures this contractor is part of.
Total projects
252
Total budget
₱6.1B
Average progress
90.6%
Completion rate
81.0%
Average risk score
47.5
Medium risk on average, out of 100
Flagged as unusual
15
6.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 210 | ₱4.4B | 46.0 | 9 | 92.4% |
| Region III | 29 | ₱1.5B | 55.2 | 1 | 89.0% |
| Region IV-A | 12 | ₱237.4M | 54.8 | 4 | 62.1% |
| Region V | 1 | ₱18.7M | 48.1 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 96 | ₱1.5B | 42.9 | 1 | 94.1% |
| Flood Control and Drainage | 81 | ₱3.3B | 48.6 | 1 | 94.5% |
| Buildings and Facilities | 44 | ₱510.9M | 44.8 | 1 | 85.6% |
| OTHER | 15 | ₱345.4M | 53.3 | 3 | 89.1% |
| GAA 2025 SSP | 8 | ₱180.4M | 87.8 | 7 | 58.0% |
| Bridges | 6 | ₱108.8M | 45.5 | 1 | 86.5% |
| GAA 2025 OO-2 | 2 | ₱161.2M | 88.5 | 1 | 31.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DN0053CONSTRUCTION OF ROAD AT BLK. 21-23, 25-28, 30-32, PUROK 5, LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱42.8M | 44% | High risk94 | Flagged0.008 |
| 25OD0110CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARUGO ROAD, BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.2M | 36% | High risk92 | Flagged0.020 |
| 25OB0100CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, NICANOR IBUNA ELEMENTARY SCHOOL, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.8M | 85% | High risk92 | Flagged0.004 |
| 25OD0154CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.1M | 71% | High risk92 | Flagged0.011 |
| 25OD0085REHABILITATION OF MULTI-PURPOSE BUILDING, CALOOCAN NORTH ELEMENTARY SCHOOL, BARANGAY 178, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱4.9M | 22% | High risk90 | Flagged0.023 |
| 25OD0228CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG DALIAH ST., FRANVILLE 5, BRGY. 177, CALOOCAN CITY (PHASE 2) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱18.9M | 100% | High risk89 | —-0.029 |
| 25OD0312CONSTRUCTION OF FLOOD CONTROL WALL ALONG BARANGAY 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱69.1M | 17% | High risk89 | Flagged0.000 |
| 25OC0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱92.2M | 46% | High risk88 | —-0.003 |
| 25OD0281CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 187, ZONE 16, DISTRICT 3, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱4.8M | 26% | High risk85 | Flagged0.020 |
| 24D00277CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - CARMONA SUPER HEALTH CENTER, CAVITE | Region IV-A | Region IV-A | On-Going | ₱11.7M | 46% | High risk83 | Flagged0.050 |
| 24CC0046CO9NSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY CATULINAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |
| 23CC0570CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL PROJECT AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER SAN JUAN SECTION BALAGTAS, BULACAN STA. 012+850 TO STA. 013+000 | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | High risk76 | —-0.005 |
| 24CC0274CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY CAMBAOG (SITIO TEODORO TO PUROK 4), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.061 |
| 24CC0190CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY FRANCES (PUROK 4 TO PUROK 5), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 25CC0065CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY PIEL (PUROK 6), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 91% | High risk76 | —-0.030 |
| 25CC0064CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY PIEL (PUROK 6), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 94% | High risk76 | —-0.031 |
| 25CK0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE II), LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱72.4M | 86% | High risk75 | —-0.028 |
| 24CC0119CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CAINGIN, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱19.3M | 81% | High risk74 | —-0.028 |
| 24CD0279CONSTRUCTION OF SANTA MARIA-PANDI BYPASS ROAD (PHASE III), SANTA MARIA SECTION, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱48.9M | 50% | High risk73 | —-0.023 |
| 25CC0114CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SILING BATA, PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱12.5M | 100% | High risk72 | —-0.046 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24D00277CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - CARMONA SUPER HEALTH CENTER, CAVITE | Region IV-A | Region IV-A | On-Going | ₱11.7M | 46% | High risk83 | Flagged0.050 |
| 21DF0219CONCRETING OF BRGY. DIANE 2 TO BRGY. DAINE 1 FMR, BRGY. DIANE 2 AND DIANE 1, INDANG, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱11.6M | 0% | Medium risk43 | Flagged0.040 |
| 25OD0085REHABILITATION OF MULTI-PURPOSE BUILDING, CALOOCAN NORTH ELEMENTARY SCHOOL, BARANGAY 178, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱4.9M | 22% | High risk90 | Flagged0.023 |
| 25OD0281CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 187, ZONE 16, DISTRICT 3, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱4.8M | 26% | High risk85 | Flagged0.020 |
| 25OD0110CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARUGO ROAD, BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.2M | 36% | High risk92 | Flagged0.020 |
| 24D00283CONSTRUCTION OF NEW SUPER HEALTH CENTERS / RHU BARAS SUPER HEALTH CENTER, RIZAL | Region IV-A | Region IV-A | On-Going | ₱11.7M | 10% | Medium risk44 | Flagged0.017 |
| 24CK0194CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG PARUA RIVER, BARANGAY SAN VICENTE SECTION, PHASE 1, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱48.2M | 74% | Medium risk44 | Flagged0.014 |
| 17FN0078CONSTRUCTION OF BRIDGE, BARANGAY PALASPAS, DEL GALLEGO, CAMARINES SUR | Region V | Camarines Sur 1st DEO | Completed | ₱18.7M | 100% | Medium risk48 | Flagged0.011 |
| 25OD0154CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAY 171 AND BARANGAY 175, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱48.1M | 71% | High risk92 | Flagged0.011 |
| 25DN0053CONSTRUCTION OF ROAD AT BLK. 21-23, 25-28, 30-32, PUROK 5, LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱42.8M | 44% | High risk94 | Flagged0.008 |
| 25OD0309CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, UNIVERSITY OF CALOOCAN CITY (UCC) CONGRESSIONAL CAMPUS, BARANGAY 173, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱2.9M | 80% | High risk68 | Flagged0.006 |
| 25OB0100CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, NICANOR IBUNA ELEMENTARY SCHOOL, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱9.8M | 85% | High risk92 | Flagged0.004 |
| 25OD0040CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROAD LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) MALARIA ROAD TO VICTORIA WAVE SPECIAL ECONOMIC ZONE, CALOOCAN CITY, METRO MANILA | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱28.8M | 27% | Medium risk58 | Flagged0.003 |
| 24OD0224CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 144, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱29.2M | 64% | Medium risk56 | Flagged0.000 |
| 25OD0312CONSTRUCTION OF FLOOD CONTROL WALL ALONG BARANGAY 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱69.1M | 17% | High risk89 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18OD0249CONSTRUCTION OF KARUHATAN CONVENTION CENTER, BRGY. KARUHATAN, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱24.6M | 100% | Medium risk51 | —-0.095 |
| 52 | 25OA0051REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG MARALA RIVER (PHASE 1), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 54% | Medium risk50 | —-0.043 |
| 53 | 23OD0039CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY HALL, BRGY. 176 (PHASE 3), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.2M | 100% | Medium risk50 | —-0.100 |
| 54 | 23OD0170CONSTRUCTION OF COVERED COURT AT NORTH MATRIXVILLE SUBDIVISION 1, BARANGAY 177, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱14.6M | 100% | Medium risk49 | —-0.100 |
| 55 | 25OA0043REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SOUTH PINAGKABALIAN RIVER (PHASE 3), MALABON CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱47.5M | 90% | Medium risk49 | —-0.053 |
| 56 | 20OD0210CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BRGY. 132, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱14.5M | 100% | Medium risk49 | —-0.091 |
| 57 | 18OD0208REHABILITATION OF MULTIPURPOSE BUILDING, BRGY. MAPULANG LUPA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱14.3M | 100% | Medium risk49 | —-0.100 |
| 58 | 24OD0243CONSTRUCTION OF MULTI-PURPOSE BUILDING AT CAPITOL PARK HOMES I, BRGY. 179, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.7M | 100% | Medium risk49 | —-0.100 |
| 59 | 23OD0214CONSTRUCTION OF FLOOD CONTROL WALL ALONG CAMARIN CREEK (LEFT SIDE) BRGY. 178 AND 180, STA. 0+000 TO STA. 0+223, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱47.8M | 100% | Medium risk49 | —-0.086 |
| 60 | 19OD0025CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), UNIVERSITY OF CALOOCAN CITY CAMPUS, BRGY. 173, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱13.4M | 100% | Medium risk49 | —-0.089 |
| 61 | 22OD0228CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 178, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.7M | 100% | Medium risk49 | —-0.101 |
| 62 | 24OA0048CONSTRUCTION OF DRAINAGE SYSTEM ALONG M.H. DEL PILAR ST. (PHASE 1), MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.082 |
| 63 | 25OD0026CONSTRUCTION OF FLOOD CONTROL WALL ALONG NANAY NANAYAN CREEK, BARANGAY 176, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱48.1M | 100% | Medium risk49 | —-0.087 |
| 64 | 17OD0001REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY-4, MAC ARTHUR HIGHWAY, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.1M | 100% | Medium risk49 | —-0.068 |
| 65 | 25OB0107CONSTRUCTION OF MULTI-PURPOSE BUILDING, KABAYANAN ELEMENTARY SCHOOL (SPED), BARANGAY KABAYANAN, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱19.5M | 0% | Medium risk49 | —-0.032 |
| 66 | 22OA0048CONSTRUCTION OF BOX CULVERT DRAINAGE ALONG SANCIANGCO ST. (P. AQUINO ST. TO CATMON BRIDGE), MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.071 |
| 67 | 24OA0038CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MUZON RIVERWALL (PHASE 5), BRGY. MUZON, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 68 | 22OA0051CONSTRUCTION OF RIVERWALL ALONG TANZA DIKE (PHASE 2), BARANGAY TANZA 1, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.085 |
| 69 | 22OA0047CONSTRUCTION OF RIVERWALL (PHASE 2), BARANGAY DAMPALIT, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.083 |
| 70 | 24OA0016CONSTRUCTION OF RIVERWALL ALONG TANZA DIKE (PHASE 3) BARANGAY TANZA, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.088 |
| 71 | 17OB0031PREVENTIVE MAINTENANCE ALONG PPTA ROAD K0020+1042 TO K0021+598 TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱7.9M | 100% | Medium risk49 | —-0.063 |
| 72 | 17OB0022PREVENTIVE MAINTENANCE ALONG GENERAL SANTOS AVENUE, K0025+405 TO K0025+873, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱5.1M | 100% | Medium risk49 | —-0.060 |
| 73 | 23OA0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY DAMPALIT, MALABON CITY (PHASE 3) | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.084 |
| 74 | 17OD0085CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANKS OF VARIOUS CREEKS IN BRGY. 181 (PHASE 3), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱21.7M | 100% | Medium risk48 | —-0.062 |
| 75 | 17OD0084CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANKS OF VARIOUS CREEKS IN BRGY. 181 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱21.9M | 100% | Medium risk48 | —-0.062 |