Contractor dossier
191 projects on file, including joint ventures this contractor is part of.
Total projects
191
Total budget
₱4B
Average progress
94.4%
Completion rate
70.7%
Average risk score
49.1
Medium risk on average, out of 100
Flagged as unusual
6
3.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 187 | ₱3.9B | 49.1 | 6 | 94.3% |
| Region IV-B | 2 | ₱60.3M | 62.3 | 0 | 95.0% |
| Region III | 2 | ₱9.9M | 34.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 66 | ₱2B | 48.4 | 1 | 95.9% |
| Buildings and Facilities | 63 | ₱443.3M | 42.4 | 0 | 94.9% |
| Water Provision and Storage | 29 | ₱176.6M | 45.0 | 0 | 97.0% |
| Flood Control and Drainage | 12 | ₱563.3M | 51.7 | 0 | 100.0% |
| Bridges | 7 | ₱190.7M | 47.0 | 0 | 87.6% |
| GAA 2025 SSP | 5 | ₱31.6M | 94.5 | 3 | 71.9% |
| GAA 2025 OO-1 | 4 | ₱328.4M | 95.1 | 1 | 68.4% |
| OTHER | 4 | ₱161.4M | 77.2 | 1 | 93.1% |
| GAA 2025 OO-2 | 1 | ₱43.2M | 88.0 | 0 | 90.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DM0118ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0341 + 000 - K0343 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 89% | High risk96 | —-0.004 |
| 25DM0129ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -TERTIARY ROADS - MSR JCT-LOPEZ-CATANAUAN RD - K0250 + 820 - K0253 + 400 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 90% | High risk96 | —-0.005 |
| 25DM0130ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0250 + (-795) - K0253 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 37% | High risk96 | Flagged0.011 |
| 25DJ0125CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL TRADING CENTER) IN DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 50% | High risk95 | Flagged0.008 |
| 25DJ0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BULAKIN, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | —-0.009 |
| 25DJ0110CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY KINABUHAYAN, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 82% | High risk95 | —-0.001 |
| 25DJ0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) -ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATIPUNSO, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.8M | 70% | High risk95 | Flagged0.005 |
| 25DJ0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BUKAL, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 58% | High risk94 | Flagged0.007 |
| 25DJ0116OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, QUEZON ECO-TOURISM RD - K0147 + (-033) - K0147 + 250, K0147 + 620 - K0147 + 970, K0148 + 428 - K0148 + 451 | Region IV-A | Quezon 2nd DEO | On-Going | ₱47.5M | 58% | High risk93 | —-0.004 |
| 25EA0048FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF BAGTINGON FLOOD CONTROL STRUCTURE, BARANGAY BAGTINGON, BUENAVISTA, MARINDUQUE | Region IV-B | Marinduque DEO | On-Going | ₱43.2M | 90% | High risk88 | —-0.015 |
| 24DJ0182CONCRETING OF BRGY. SAMPALOC BOGON FMR, BRGY. SAMPALOC BOGON, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.9M | 99% | High risk86 | Flagged0.034 |
| 24DJ0046OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF MISSING LINKS/NEW ROADS, QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD (PACKAGE 13), QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 99% | High risk76 | —-0.001 |
| 24DJ0174CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BRIDGE AND APPROACHES, B | Region IV-A | Quezon 2nd DEO | On-Going | ₱49M | 79% | High risk75 | —-0.003 |
| 25DC0026CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY AMBULONG, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 85% | High risk75 | —-0.040 |
| 24DJ0093CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BRGY. TAMISIAN, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱5.9M | 95% | High risk72 | —-0.009 |
| 20DM0042NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 2, QUEZON, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.062 |
| 25DJ0092CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF SOLAR POWER WATER SUPPLY SYSTEM, BARANGAY IBABANG TALIM, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 100% | High risk68 | —-0.024 |
| 25DJ0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION (REHABILITATION) OF ROAD, VILLA ROSARIO SUBD, BARANGAY | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 100% | High risk68 | —-0.050 |
| 25DJ0112OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, SARIAYA BYPASS RD (S06105LZ) - CHAINAGE 6959 - CHAINAGE 7191 | Region IV-A | Quezon 2nd DEO | On-Going | ₱8.5M | 29% | High risk65 | —-0.028 |
| 22DJ0125OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG LAGNAS RIVER (UPSTREAM-PACKAGE 2), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DJ0182CONCRETING OF BRGY. SAMPALOC BOGON FMR, BRGY. SAMPALOC BOGON, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.9M | 99% | High risk86 | Flagged0.034 |
| 24DJ0202CONCRETING OF BRGY. MAGSAYSAY FMR, BRGY. MAGSAYSAY, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.9M | 99% | High risk61 | Flagged0.011 |
| 25DM0130ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ABUYON-BUENAVISTA RD - K0250 + (-795) - K0253 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 37% | High risk96 | Flagged0.011 |
| 25DJ0125CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL TRADING CENTER) IN DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 50% | High risk95 | Flagged0.008 |
| 25DJ0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BUKAL, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 58% | High risk94 | Flagged0.007 |
| 25DJ0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) -ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATIPUNSO, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱9.8M | 70% | High risk95 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 25DJ0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LOOB, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 97% | Medium risk49 | —-0.070 |
| 52 | 22DJ0064OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL, BRGY. COTTA, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 53 | 24DJ0027CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY MANGGALANG TULO-TULO, SARIAYA, QUEZON PROVINCE | Region IV-A | Quezon 2nd DEO | Completed | ₱7.4M | 100% | Medium risk49 | —-0.106 |
| 54 | 25DJ0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PULO, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 93% | Medium risk49 | —-0.066 |
| 55 | 21DJ0115LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDING AND OTHER STRUCTURE, MULTI-PURPOSE/ FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (CANDELARIA MUNICIPAL BUILDING), BRGY. MALABANBAN SUR, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱9.8M | 100% | Medium risk49 | —-0.107 |
| 56 | 24DJ0050CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY CASTANAS, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱7.4M | 100% | Medium risk49 | —-0.106 |
| 57 | 24DJ0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ANTIPOLO, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 99% | Medium risk49 | —-0.065 |
| 58 | 24DJ0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY MANGGALANG BANTILAN, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 85% | Medium risk49 | —-0.053 |
| 59 | 24DJ0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY MANGGALANG 1, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱7.4M | 100% | Medium risk49 | —-0.106 |
| 60 | 21DJ0100LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDING AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES, NATIONAL GOVERNMENT COMPLEX, BRGY. MAYAO PARADA, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱11.8M | 100% | Medium risk49 | —-0.105 |
| 61 | 24DJ0183CONCRETING OF BRGY. MATIPUNSO FMR, BRGY. MATIPUNSO, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱14.8M | 100% | Medium risk48 | —-0.015 |
| 62 | 24DJ0205CONCRETING OF BRGY. STA. LUCIA FMR, BRGY. STA. LUCIA, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱14.8M | 82% | Medium risk48 | —-0.012 |
| 63 | 25DJ0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY CORAZON, SAN ANTONIO, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.9M | 100% | Medium risk48 | —-0.042 |
| 64 | 22DJ0158CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BULAKIN 2, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.104 |
| 65 | 24DJ0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, SITIO PAJO, BARANGAY SALINAS, LUCENA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.070 |
| 66 | 23DJ0164CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. LUSACAN, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.9M | 0% | Medium risk48 | —-0.022 |
| 67 | 24DJ0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM LEVEL II, BARANGAY MALIGAYA, DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.9M | 100% | Medium risk48 | —-0.032 |
| 68 | 25DJ0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY CABATANG, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.9M | 75% | Medium risk48 | —-0.034 |
| 69 | 25DJ0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY LAGALAG, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.9M | 92% | Medium risk48 | —-0.039 |
| 70 | 20DM0052NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - SAN FRANCISCO-SAN ANDRES-SAN NARCISO ROAD, PACKAGE 5, QUEZON, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.057 |
| 71 | 25DJ0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF SOLAR POWER WATER SUPPLY SYSTEM, BARANGAY BUENAVISTA WEST, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 49% | Medium risk48 | —-0.027 |
| 72 | 25DJ0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY BEHIA, TIAONG, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱6.4M | 100% | Medium risk48 | —-0.044 |
| 73 | 25DJ0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY POBLACION 4, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.9M | 98% | Medium risk48 | —-0.041 |
| 74 | 19DJ0043CONSTRUCTION OF MULTI-PURPOSE BUILDING (FOOD PROCESSING CENTER) BRGY. MASALUKOT 4, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.106 |
| 75 | 25DJ0089CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY SAN ISIDRO, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱7.4M | 100% | Medium risk48 | —-0.045 |