Contractor dossier
352 projects on file, including joint ventures this contractor is part of.
Total projects
352
Total budget
₱12.1B
Average progress
96.5%
Completion rate
85.8%
Average risk score
48.3
Medium risk on average, out of 100
Flagged as unusual
14
4.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 306 | ₱9.9B | 48.7 | 12 | 96.5% |
| Region VI | 23 | ₱1.3B | 48.8 | 2 | 93.8% |
| Region IV-A | 23 | ₱798.5M | 42.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 142 | ₱4.7B | 49.2 | 3 | 98.4% |
| Buildings and Facilities | 83 | ₱1.2B | 36.7 | 3 | 94.9% |
| Flood Control and Drainage | 75 | ₱4.5B | 51.7 | 1 | 98.3% |
| Bridges | 29 | ₱601.1M | 44.3 | 1 | 90.9% |
| OTHER | 14 | ₱694.1M | 74.6 | 1 | 98.5% |
| GAA 2025 OO-1 | 3 | ₱201.1M | 94.0 | 2 | 63.4% |
| GAA 2025 SSP | 3 | ₱102.7M | 93.4 | 3 | 89.9% |
| Water Provision and Storage | 2 | ₱9.8M | 68.2 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱68.8M | 72.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GM0010OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN - BAIS RD - K0100+000 - K0101+750, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱93.3M | 61% | High risk95 | Flagged0.010 |
| 25GN0032CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CANSONSING CREEK, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱48.7M | 94% | High risk95 | Flagged0.006 |
| 25GN0055CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUCROS CREEK, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱49M | 77% | High risk95 | Flagged0.015 |
| 25GM0009OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN - BAIS RD - K0098+000 - K0098+230, K0098+483 - K0100+000, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱91.1M | 59% | High risk95 | Flagged0.009 |
| 25GN0042NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS: DON JORGE ARANETA-AYUNGON-YUNGUE-GURREA-LA CARLOTA CITY ROAD - K0042 + 069 - K0042 +081, K0042 +150 - K0042 + 546, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱16.7M | 70% | High risk92 | —-0.001 |
| 25GN0026CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ANTIPOLO, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱4.9M | 99% | High risk90 | Flagged0.004 |
| 24G00047CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF HIMOGA- AN RIVER, SAGAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱181.8M | 90% | High risk80 | Flagged0.026 |
| 24G00121CONSTRUCTION OF MULTIPURPOSE BUILDING, NEGROS OCCIDENTAL CONVENTION CENTER, SILAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱247.4M | 16% | High risk79 | Flagged0.035 |
| 25GN0034CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱94.3M | 45% | High risk78 | Flagged0.004 |
| 23GN0048ROAD WIDENING - TERTIARY ROADS - JCT. PONTEVEDRA - LA CASTELLANA ROAD - K0045+(-995) - K0046+000, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱66.8M | 100% | High risk76 | —-0.031 |
| 23GN0024ROAD WIDENING - JCT. PONTEVEDRA - LA CASTELLANA RD - K0055+500 - K0057+500, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱66.9M | 100% | High risk76 | —-0.031 |
| 18GL0065ACCESS ROAD LEADING TO BINADLAN FALLS, BARANGAY BIA-AO | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱80M | 100% | High risk76 | —-0.028 |
| 17DP0019NETWORK DEVELOPMENT - IMPROVEMENT / WIDENING OF NATIONAL ROADS ALONG CALAUAN - NAGCARLAN BDRY ROAD K0078 + 184 - K0078 + 700, K0084 + 186 - K0087 + 397 | Region IV-A | Laguna 3rd DEO | Completed | ₱115.8M | 100% | High risk75 | —-0.016 |
| 24GM0005OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF SIDEWALK - KABANKALAN-BAIS RD- K0089+(-805) - K0090+170, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱33.9M | 89% | High risk74 | —-0.004 |
| 17RA0050REHABILITATION/RECONSTRUCTION/UPGRADINGOF BACOLODCIRCUMFERENTIAL RD.K0003+ (-543) TOK0003+ (-071),BRGY. VILLAMONTE, BACOLODCITY | Negros Island Region | Bacolod City DEO | Completed | ₱23.3M | 100% | High risk74 | —-0.034 |
| 18GL0056ALIMANGO BR. 1 (B00356NR) ALONG BACOLOD SOUTH ROAD | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱30.4M | 100% | High risk74 | —-0.034 |
| 17RD0085RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BALANGAY BRIDGE (B00223NR), BACOLOD SOUTH ROAD, (KA | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱13.8M | 100% | High risk74 | —-0.031 |
| 17RA0004RETROFITTING STRENGTHENING OF MAGSUNGAY BRIDGE 1 (B00320NR) ALONG BACOLOD SOUTH ROAD,BRGY SINGCANG, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱13.3M | 100% | High risk73 | —-0.037 |
| 17RA0049REHABILITATION/RECONSTRUCTION/UPGRADINGOF STO.NINO-BANAGO RD.(NORTH) K0001+ (-422) TOK0001+ (-100), K0001+030 TOK0001+102, K0001+740 TOK0002+000, BRGY. BANAGO,BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱17.7M | 100% | High risk73 | —-0.035 |
| 20GN0070IMPROVEMENTS OF MPRA (MUNICIPAL PARKS AND RECREATION AREA), BRGY. 1, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱9.6M | 100% | High risk73 | —-0.034 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00121CONSTRUCTION OF MULTIPURPOSE BUILDING, NEGROS OCCIDENTAL CONVENTION CENTER, SILAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱247.4M | 16% | High risk79 | Flagged0.035 |
| 25RD0091CONSTRUCTION OF SCHOOL BUILDING, RSB ELEMENTARY SCHOOL, BARANGAY RSB, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱5.6M | 0% | Medium risk45 | Flagged0.030 |
| 25RD0090CONSTRUCTION OF SCHOOL BUILDING, LA GRANJA FARM SCHOOL, BARANGAY LA GRANJA, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱8.3M | 0% | Medium risk44 | Flagged0.030 |
| 24G00047CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF HIMOGA- AN RIVER, SAGAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱181.8M | 90% | High risk80 | Flagged0.026 |
| 23GL0120CONSTRUCTION OF ROAD AT BRGY. MANGHANOY, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱9.7M | 100% | High risk61 | Flagged0.024 |
| 24GN0080CONCRETING OF BRGY. LA GRANJA FMR, BRGY. LA GRANJA, LA CARLOTA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱14.8M | 100% | High risk66 | Flagged0.020 |
| 24GL0134CONSTRUCTION OF FARM-TO-MILL BRIDGE, BOX CULVERT, SITIO BONTON, BRGY. CARABALAN, HIMAMAYLAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱14.9M | 100% | High risk65 | Flagged0.017 |
| 25GN0055CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUCROS CREEK, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱49M | 77% | High risk95 | Flagged0.015 |
| 25GM0010OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN - BAIS RD - K0100+000 - K0101+750, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱93.3M | 61% | High risk95 | Flagged0.010 |
| 25GM0009OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN - BAIS RD - K0098+000 - K0098+230, K0098+483 - K0100+000, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱91.1M | 59% | High risk95 | Flagged0.009 |
| 23HK0099ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, AYUQUITAN (SAN JOSE) BR. (B00078NR) ALONG DUMAGUETE NORTH ROAD (DUMAGUETE-JCT BAIS-KABANKALAN), SAN JOSE, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱28.5M | 0% | Medium risk46 | Flagged0.007 |
| 25GN0032CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CANSONSING CREEK, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱48.7M | 94% | High risk95 | Flagged0.006 |
| 25GN0026CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ANTIPOLO, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱4.9M | 99% | High risk90 | Flagged0.004 |
| 25GN0034CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱94.3M | 45% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 326 | 21GK0047CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) DAGA ELEMENTARY SCHOOL, BARANGAY DAGA, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱3M | 100% | Low risk21 | —-0.085 |
| 327 | 18GJ0018CONCRETING/REHABILITATION OF ROAD, CPU GATE 6, BRGY. LOPEZ JAENA, JARO, ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱1.9M | 100% | Low risk21 | —-0.086 |
| 328 | 19GJ0148CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM), TIU CHO TEG - ANA ROS (TCT-AR) FOUNDATION INTEGRATED SCHOOL, BRGY. LANIT, JARO, ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱2.4M | 100% | Low risk21 | —-0.083 |
| 329 | 21GN0018CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ABUANAN, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱3.8M | 100% | Low risk21 | —-0.087 |
| 330 | 20GN0019CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BURGOS, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱2.9M | 100% | Low risk21 | —-0.085 |
| 331 | 19GN0034CONSTRUCTION OF MULTI-PURPOSE BUILDING, LOUISIANA, BRGY. MA-AO, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱2.9M | 100% | Low risk21 | —-0.086 |
| 332 | 19HJ0018CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BRGY. TIGUIB, AYUNGON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱2.9M | 100% | Low risk21 | —-0.087 |
| 333 | 21GN0034CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LACARON, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱2.9M | 100% | Low risk20 | —-0.086 |
| 334 | 20GN0003CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PACOL, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱2.9M | 100% | Low risk20 | —-0.087 |
| 335 | 19HJ0016CONSTRUCTION OF MULTI-PURPOSED BUILDING, BRGY. SAN JOSE, LA LIBERTAD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱3.8M | 100% | Low risk20 | —-0.087 |
| 336 | 21GN0017CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BURGOS, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱3.8M | 100% | Low risk20 | —-0.086 |
| 337 | 21GN0014CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TIBSOC, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱2.9M | 100% | Low risk20 | —-0.085 |
| 338 | 21GN0030CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BALIWAGAN, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱2.9M | 100% | Low risk20 | —-0.085 |
| 339 | 19GN0029CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TABAO BAYBAY, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱2.9M | 100% | Low risk20 | —-0.086 |
| 340 | 20GN0005CONSTRUCTION OF MULTI-PURPOSE BUILDING, DON SALVADOR BENEDICTO MEMORIAL SCHOOL, BRGY. BINUBUHAN, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱2.9M | 100% | Low risk20 | —-0.087 |
| 341 | 21GK0063CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DAGA, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱2M | 100% | Low risk20 | —-0.085 |
| 342 | 23GK0186CONSTRUCTION OF BRIDGE, BRGY. HAWAIIAN, SILAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Terminated | ₱93.4K | 100% | Low risk20 | —-0.035 |
| 343 | 19GJ0147REPAIR/REHAB/IMPROVEMENT OF MULTI-PURPOSE BUILDING (GYM), BRGY. BITO-ON, JARO (NEW SITE AREA), ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱1.9M | 100% | Low risk19 | —-0.083 |
| 344 | 18GO0161CONSTRUCTION OF ONE(1) UNIT REGULAR WORKSHOP AT PAGLAUM VILLAGE NATIONAL HIGH SCHOOL, BRGY. MANSILINGAN, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱4.3M | 100% | Low risk13 | —-0.048 |
| 345 | 18GO0163CONSTRUCTION OF ONE (1) UNIT REGULAR WORKSHOP AT HANDUMANAN NATIONAL HIGH SCHOOL, BRGY. HANDUMANAN, BACOLOD CITY, NEG. OCC. | Negros Island Region | Bacolod City DEO | Completed | ₱4.1M | 100% | Low risk13 | —-0.048 |
| 346 | 21GN0010CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE II, BARANGAY SAN JUAN, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱1.4M | 100% | Low risk12 | —-0.084 |
| 347 | 19GN0090REHABILITATION COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. UBAY, PULUPANDAN, NEG. OCC. | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱485K | 100% | Low risk12 | —-0.084 |
| 348 | 19GN0086REHABILITATION COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. CULO, PULUPANDAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱485K | 100% | Low risk12 | —-0.084 |
| 349 | 19GN0091REHABILITATION IMPROVEMENT OF MULTI-PURPOSE BUILDING, BRGY. ZONE 2, PULUPANDAN, NEG. OCC. | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱485K | 100% | Low risk12 | —-0.084 |
| 350 | 19GN0089REHABILITATION COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. TAPONG, PULUPANDAN, NEG. OCC. | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱485K | 100% | Low risk12 | —-0.084 |