3 projects on file, including joint ventures this contractor is part of.
Total projects
3
Total budget
₱12.5M
Average progress
56.7%
Completion rate
0.0%
Below 70%
Average risk score
65.4
High risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 3 | ₱12.5M | 65.4 | 0 | 56.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 1 | ₱4.7M | 77.7 | 0 | 100.0% |
| Flood Control and Drainage | 1 | ₱4.7M | 77.3 | 0 | 2.4% |
| Buildings and Facilities | 1 | ₱3M | 41.2 | 0 | 67.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0268CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY SULBEC, PASUQUIN, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk78 | —-0.051 |
| 25AA0536SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF CANAL LINING, BARANGAY 29 STO. TOMAS, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 2% | High risk77 | —-0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25AA0268CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY SULBEC, PASUQUIN, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 100% | High risk78 | —-0.051 |
| 2 | 25AA0536SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF CANAL LINING, BARANGAY 29 STO. TOMAS, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 2% | High risk77 | —-0.001 |
| 3 | 24AA0382BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: CONSTRUCTION (COMPLETION) OF MULTI PURPOSE BUILDING, BARANGAY MANGATO WEST, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱3M | 68% | Medium risk41 | —-0.026 |