Contractor dossier
216 projects on file, including joint ventures this contractor is part of.
Total projects
216
Total budget
₱10.9B
Average progress
95.0%
Completion rate
83.8%
Average risk score
53.1
Medium risk on average, out of 100
Flagged as unusual
26
12.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 197 | ₱9.7B | 51.9 | 21 | 94.6% |
| Cordillera Administrative Region | 11 | ₱883.7M | 61.8 | 2 | 99.6% |
| Region I | 7 | ₱233.6M | 73.4 | 3 | 99.9% |
| Region V | 1 | ₱4.9M | 50.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 88 | ₱5.1B | 52.2 | 3 | 95.8% |
| Bridges | 55 | ₱2.5B | 48.5 | 7 | 95.2% |
| Flood Control and Drainage | 38 | ₱1.5B | 50.6 | 0 | 100.0% |
| OTHER | 16 | ₱802.9M | 75.5 | 11 | 98.4% |
| Buildings and Facilities | 10 | ₱195.3M | 49.5 | 2 | 80.0% |
| Bridges, Roads | 4 | ₱477.3M | 60.3 | 0 | 94.1% |
| Water Provision and Storage | 3 | ₱163.8M | 49.4 | 1 | 66.7% |
| GAA 2025 SSP | 2 | ₱174.2M | 95.2 | 2 | 53.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25B00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046, K0655+062 - K | Region II | Region II | On-Going | ₱125.4M | 78% | High risk95 | Flagged0.036 |
| 25BK0044CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF MADDELA WATER SYSTEM, MADDELA, QUIRINO | Region II | Quirino DEO | On-Going | ₱48.8M | 29% | High risk95 | Flagged0.023 |
| 16BI0036REPAIR / REHABILITATION OF CUPAS RIVER FLOOD CONTROL, STO. DOMINGO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱12.8M | 100% | High risk80 | Flagged0.013 |
| 17BI0037REHABILITATION/IMPROVEMENT OF BANGAR FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BANGAR, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk78 | Flagged0.016 |
| 17BI0034REHABILITATION/IMPROVEMENT OF BUSILAC FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BUSILAC, BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.1M | 100% | High risk78 | Flagged0.018 |
| 17BI0036REHABILITATION/IMPROVEMENT OF DADAP FLOOD CONTROL (STA. 0+000-STA. 0+948) BRGY. DADAP, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.4M | 100% | High risk78 | Flagged0.017 |
| 17BI0035REHABILITATION/IMPROVEMENT OF CURIFANG FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY.CURIFANG, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.5M | 100% | High risk77 | Flagged0.017 |
| 17BI0031REHABILITATION/IMPROVEMENT OF MACATE FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. MACATE, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱42.6M | 100% | High risk77 | Flagged0.018 |
| 23AA0508IMPROVEMENT OF ROAD ALONG MANILA NORTH ROAD, BACARRA SECTION, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49.8M | 99% | High risk77 | Flagged0.021 |
| 17P00043NETWORK DEVELOPMENT - OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, NUEVA VIZCAYA - IFUGAO - MT. PROVINCE ROAD K0337+006 - K0356+344, K0356+355 - K0359+000 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱137.7M | 100% | High risk76 | —-0.000 |
| 17P00026ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) - KIANGAN-TINOC-BUGUIAS ROAD CHAINAGE 48348 - CHAINANGE 52098 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk76 | Flagged0.002 |
| 23AA0501IMPROVEMENT OF ROAD LAOAG-VINTAR ROAD, LAOAG CITY AND VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱50.7M | 100% | High risk76 | —-0.021 |
| 17BI0030REHABILITATION/IMRPOVEMENT OF STO. DOMINGO FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. STO. DOMINGO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 17BI0032REHABILITATION/IMPROVEMENT OF ALMAGUER SOUTH FLOOD CONTROL (STA. 0+000 - STA. 0+970), BRGY. ALMAGUER SOUTH, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.8M | 100% | High risk76 | Flagged0.018 |
| 17BI0029REHABILITATION/IMPROVEMENT OF INDIANA FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. INDIANA, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 23AA0502IMPROVEMENT OF ROAD ALONG TANAP ROAD, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.8M | 100% | High risk76 | Flagged0.015 |
| 23AA0507IMPROVEMENT OF ROAD, POBLACION 1 AND POBLACION 2, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.7M | 100% | High risk74 | Flagged0.014 |
| 18BI0024ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES, BONFAL EAST SECTION | Region II | Nueva Vizcaya DEO | Completed | ₱18.8M | 100% | High risk74 | —-0.028 |
| 21P00059CLUSTER: (A) ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - NUEVA VIZCAYA - IFUGAO - MT. PROVINCE BDRY ROAD, KO312+060 - KO313+677, KIANGAN, IFUGAO(B) C | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱38.2M | 100% | High risk74 | —-0.024 |
| 24B00076OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ALONG MANILA NORTH ROAD | Region II | Region II | On-Going | ₱58.1M | 74% | High risk72 | Flagged0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BB0223CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM BARANGAYS CENTRO SUR AND CENTRO NORTE, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.047 |
| 20B00025ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF SAN LORENZO RUIZ BRIDGE (B01235LZ) (PARALLEL BRIDGE) ALONG DAANG MAHARLIKA (LZ) | Region II | Region II | On-Going | ₱384.8M | 94% | High risk64 | Flagged0.039 |
| 25B00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046, K0655+062 - K | Region II | Region II | On-Going | ₱125.4M | 78% | High risk95 | Flagged0.036 |
| 24B00112OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAN LORENZO RUIZ BRIDGE (B01235LZ) ALONG DAANG MAHARLIKA (LZ), PHASE I | Region II | Region II | On-Going | ₱108.4M | 88% | High risk65 | Flagged0.034 |
| 24B00113OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - BATU BR. (B01227LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱87.1M | 88% | Medium risk55 | Flagged0.031 |
| 25BK0044CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF MADDELA WATER SYSTEM, MADDELA, QUIRINO | Region II | Quirino DEO | On-Going | ₱48.8M | 29% | High risk95 | Flagged0.023 |
| 23AA0508IMPROVEMENT OF ROAD ALONG MANILA NORTH ROAD, BACARRA SECTION, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49.8M | 99% | High risk77 | Flagged0.021 |
| 24B00076OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ALONG MANILA NORTH ROAD | Region II | Region II | On-Going | ₱58.1M | 74% | High risk72 | Flagged0.020 |
| 24B00143DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/UPGRADING/REPAIR AND EQUIPPING OF RURAL HEALTH UNITS - VILLAVERDE RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱6M | 0% | Medium risk42 | Flagged0.019 |
| 24B00154DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ UPGRADING/ REPAIR AND EQUIPPING OF RHUS - BAYOMBONG RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱5.8M | 0% | Medium risk42 | Flagged0.019 |
| 17BI0031REHABILITATION/IMPROVEMENT OF MACATE FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. MACATE, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱42.6M | 100% | High risk77 | Flagged0.018 |
| 17BI0032REHABILITATION/IMPROVEMENT OF ALMAGUER SOUTH FLOOD CONTROL (STA. 0+000 - STA. 0+970), BRGY. ALMAGUER SOUTH, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.8M | 100% | High risk76 | Flagged0.018 |
| 17BI0030REHABILITATION/IMRPOVEMENT OF STO. DOMINGO FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. STO. DOMINGO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 17BI0029REHABILITATION/IMPROVEMENT OF INDIANA FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. INDIANA, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 17BI0034REHABILITATION/IMPROVEMENT OF BUSILAC FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BUSILAC, BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.1M | 100% | High risk78 | Flagged0.018 |
| 17BI0035REHABILITATION/IMPROVEMENT OF CURIFANG FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY.CURIFANG, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.5M | 100% | High risk77 | Flagged0.017 |
| 17BI0036REHABILITATION/IMPROVEMENT OF DADAP FLOOD CONTROL (STA. 0+000-STA. 0+948) BRGY. DADAP, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.4M | 100% | High risk78 | Flagged0.017 |
| 17BI0037REHABILITATION/IMPROVEMENT OF BANGAR FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BANGAR, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk78 | Flagged0.016 |
| 23AA0502IMPROVEMENT OF ROAD ALONG TANAP ROAD, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.8M | 100% | High risk76 | Flagged0.015 |
| 23AA0507IMPROVEMENT OF ROAD, POBLACION 1 AND POBLACION 2, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.7M | 100% | High risk74 | Flagged0.014 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 20BJ0026BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - PRIMARY ROADS BALILING BRIDGE (B01217LZ) ALONG DAANG MAHARLIKA (LZ) BALILING SANTA FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱45.1M | 100% | Medium risk46 | —-0.046 |
| 152 | 20BJ0031BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES: MAG-ASAWANG KAHOY BRIDGE (B01219LZ) ALONG DAANG MAHARLIKA, BALITE, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱10.1M | 100% | Medium risk46 | —-0.049 |
| 153 | 19BG0045OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - WIDENING OF PERMANENT BRIDGES - MACALAOAT BR. (B01191LZ) ALONG SANTIAGO-TUGUEGARAO RD., BRIDGE PROPER: K0360+861 (STA. 0+154) - K060+889.60 (STA. 0+182.60); APP A. K0360+707 (STA. 0+000) - K036 | Region II | Isabela 3rd DEO | Completed | ₱27.9M | 100% | Medium risk46 | —-0.049 |
| 154 | 18BJ0018BRIDGE-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BITNONG BR.1 (B01255LZ), ALONG ARITAO-QUIRINO ROAD BRGY. BITNONG, DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱5.6M | 100% | Medium risk45 | —-0.046 |
| 155 | 18BJ0016BRIDGE-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, LOBO BR. (B01249LZ), ALONG NUEVA VIZCAYA-BENGUET ROAD BRGY. KIRANG, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱6.6M | 100% | Medium risk45 | —-0.046 |
| 156 | 20BJ0033BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, GABUT BR. (B01224LZ) ALONG DAANG MAHARLIKA (LZ), GABUT, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱5.4M | 100% | Medium risk45 | —-0.048 |
| 157 | 19BJ0034BRIDGE-REPLACEMENT OF PERMANENT WEAK BRIDGES-MACABENGA BRIDGE (B02129LZ) ALONG JCT. NATL ROAD-BITNONG-BELANCE-N. VIZCAYA BDRY RD. DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱6.6M | 100% | Medium risk45 | —-0.049 |
| 158 | 19BG0046OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE - WIDENING OF PERMANENT BRIDGES - DIAMANTINA BR. (B01190LZ) ALONG SANTIAGO-TUGUEGARAO ROAD., BRIDGE PROPER: K0356+070 (STA. 0+044) - K0356+088 (STA. 0+062); APP A K0356+026 (STA. 0+000) - K0356+0 | Region II | Isabela 3rd DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.050 |
| 159 | 19BJ0040BRIDGE RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES YANGIRAN BRIDGE ALONG DAANG MAHARLIKA (LZ) SANTA FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱17.8M | 100% | Medium risk45 | —-0.048 |
| 160 | 22BJ0022WIDENING OF PERMANENT BRIDGES- PRIMARY ROADS STA. FE BRIDGE (B04449LZ) ALONG DAANG MAHARLIKA (LZ) STA. FE NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱25.5M | 100% | Medium risk45 | —-0.047 |
| 161 | 18BJ0017BRIDGE-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BATU BR. (B02767LZ), ALONG PANTABANGAN-CANILI-BASAL- BALER ROAD, BRGY. LUBLUB, ALFONSO CASTAÑEDA, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱14.1M | 100% | Medium risk45 | —-0.051 |
| 162 | 18B00047OO 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONST'N OF BY-PASS ROAD AND DIVERSION ROAD-BAMBANG BY-PASS ROAD, INCLUDING ROW, NUEVA VIZCAYA, STA. 0+000-STA. 0+500, PROVINCE OF NUEVA VIZCAYA | Region II | Region II | Completed | ₱32.4M | 100% | Medium risk44 | —-0.082 |
| 163 | 18BI0031ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - DAANG MAHARLIKA (LZ), K0249+954-K0251+797 AND K0288+000- K0288+359BAMBANG & BAG | Region II | Nueva Vizcaya DEO | Completed | ₱31M | 100% | Medium risk44 | —-0.084 |
| 164 | 22BG0003OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. VILL | Region II | Isabela 3rd DEO | Completed | ₱34.3M | 100% | Medium risk44 | —-0.065 |
| 165 | 25B00072OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS MAHARLIKA HIGHWAY - K0287+500 - K0288+000, K0291+000 - K0291+789 | Region II | Region II | On-Going | ₱41.7M | 94% | Medium risk44 | —-0.055 |
| 166 | 18BJ0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS JCT. WANGAL-LEADING TO CAPISAAN CAVE KASIBU, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱41.4M | 100% | Medium risk44 | —-0.084 |
| 167 | 18BJ0029ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE TERTIARY ROADS JCT. NATIONAL ROAD BITNONG-BELANCE-NUEVA VIZCAYA BOUNDARY ROADK0259+360-K0259+400.70, K0261+412-K0261+443.40, K0261+950 | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱33M | 100% | Medium risk44 | —-0.084 |
| 168 | 19BI0016002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF MAGAT RIVER CONTROL, MAGSAYSAY S | Region II | Nueva Vizcaya DEO | Completed | ₱40.5M | 100% | Medium risk44 | —-0.067 |
| 169 | 19BI0001ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF MATUNO RIVER CONTROL, MANAMTAM SECTION, PHASE II , ST | Region II | Nueva Vizcaya DEO | Completed | ₱40.4M | 100% | Medium risk44 | —-0.068 |
| 170 | 21BI0049LOCAL PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-REPAIR/REHABILITATION/IMPROVEMENT OF FLOOD CONTROL AND DRAINAGE STRUCTURE ALONG MAGAT RIVER, MACATE SECTION, BRGY. MACATE, BAMBANG NUEVA VIZC | Region II | Nueva Vizcaya DEO | Completed | ₱29.7M | 100% | Medium risk44 | —-0.068 |
| 171 | 18BI0117ORGANIZATIONAL OUTCOME 2: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF STA. FE RIVER CONTROL (CAGAYAN RIVER BASIN) ALIAGA SECTION (PHASE 2), BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱28.4M | 100% | Medium risk44 | —-0.069 |
| 172 | 19BI0002ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER FLOOD CONTROL STRUCTURE, ALMAGUER SOUTH PHA | Region II | Nueva Vizcaya DEO | Completed | ₱41.4M | 100% | Medium risk44 | —-0.069 |
| 173 | 19BJ0041FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES, CALITLITAN SECTION, CALITLITAN, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱5.9M | 100% | Medium risk44 | —-0.068 |
| 174 | 19BJ0004FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONSTRUCTION OF GABUT FLOOD CONTROL STRUCTURES, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱39.5M | 100% | Medium risk44 | —-0.069 |
| 175 | 20BJ0008FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES MANGAYANG SECTION, MANGAYANG, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱42.8M | 100% | Medium risk44 | —-0.069 |