Contractor dossier
216 projects on file, including joint ventures this contractor is part of.
Total projects
216
Total budget
₱10.9B
Average progress
95.0%
Completion rate
83.8%
Average risk score
53.1
Medium risk on average, out of 100
Flagged as unusual
26
12.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 197 | ₱9.7B | 51.9 | 21 | 94.6% |
| Cordillera Administrative Region | 11 | ₱883.7M | 61.8 | 2 | 99.6% |
| Region I | 7 | ₱233.6M | 73.4 | 3 | 99.9% |
| Region V | 1 | ₱4.9M | 50.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 88 | ₱5.1B | 52.2 | 3 | 95.8% |
| Bridges | 55 | ₱2.5B | 48.5 | 7 | 95.2% |
| Flood Control and Drainage | 38 | ₱1.5B | 50.6 | 0 | 100.0% |
| OTHER | 16 | ₱802.9M | 75.5 | 11 | 98.4% |
| Buildings and Facilities | 10 | ₱195.3M | 49.5 | 2 | 80.0% |
| Bridges, Roads | 4 | ₱477.3M | 60.3 | 0 | 94.1% |
| Water Provision and Storage | 3 | ₱163.8M | 49.4 | 1 | 66.7% |
| GAA 2025 SSP | 2 | ₱174.2M | 95.2 | 2 | 53.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25B00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046, K0655+062 - K | Region II | Region II | On-Going | ₱125.4M | 78% | High risk95 | Flagged0.036 |
| 25BK0044CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF MADDELA WATER SYSTEM, MADDELA, QUIRINO | Region II | Quirino DEO | On-Going | ₱48.8M | 29% | High risk95 | Flagged0.023 |
| 16BI0036REPAIR / REHABILITATION OF CUPAS RIVER FLOOD CONTROL, STO. DOMINGO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱12.8M | 100% | High risk80 | Flagged0.013 |
| 17BI0037REHABILITATION/IMPROVEMENT OF BANGAR FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BANGAR, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk78 | Flagged0.016 |
| 17BI0034REHABILITATION/IMPROVEMENT OF BUSILAC FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BUSILAC, BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.1M | 100% | High risk78 | Flagged0.018 |
| 17BI0036REHABILITATION/IMPROVEMENT OF DADAP FLOOD CONTROL (STA. 0+000-STA. 0+948) BRGY. DADAP, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.4M | 100% | High risk78 | Flagged0.017 |
| 17BI0035REHABILITATION/IMPROVEMENT OF CURIFANG FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY.CURIFANG, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.5M | 100% | High risk77 | Flagged0.017 |
| 17BI0031REHABILITATION/IMPROVEMENT OF MACATE FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. MACATE, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱42.6M | 100% | High risk77 | Flagged0.018 |
| 23AA0508IMPROVEMENT OF ROAD ALONG MANILA NORTH ROAD, BACARRA SECTION, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49.8M | 99% | High risk77 | Flagged0.021 |
| 17P00043NETWORK DEVELOPMENT - OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, NUEVA VIZCAYA - IFUGAO - MT. PROVINCE ROAD K0337+006 - K0356+344, K0356+355 - K0359+000 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱137.7M | 100% | High risk76 | —-0.000 |
| 17P00026ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) - KIANGAN-TINOC-BUGUIAS ROAD CHAINAGE 48348 - CHAINANGE 52098 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk76 | Flagged0.002 |
| 23AA0501IMPROVEMENT OF ROAD LAOAG-VINTAR ROAD, LAOAG CITY AND VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱50.7M | 100% | High risk76 | —-0.021 |
| 17BI0030REHABILITATION/IMRPOVEMENT OF STO. DOMINGO FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. STO. DOMINGO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 17BI0032REHABILITATION/IMPROVEMENT OF ALMAGUER SOUTH FLOOD CONTROL (STA. 0+000 - STA. 0+970), BRGY. ALMAGUER SOUTH, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.8M | 100% | High risk76 | Flagged0.018 |
| 17BI0029REHABILITATION/IMPROVEMENT OF INDIANA FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. INDIANA, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 23AA0502IMPROVEMENT OF ROAD ALONG TANAP ROAD, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.8M | 100% | High risk76 | Flagged0.015 |
| 23AA0507IMPROVEMENT OF ROAD, POBLACION 1 AND POBLACION 2, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.7M | 100% | High risk74 | Flagged0.014 |
| 18BI0024ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES, BONFAL EAST SECTION | Region II | Nueva Vizcaya DEO | Completed | ₱18.8M | 100% | High risk74 | —-0.028 |
| 21P00059CLUSTER: (A) ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - NUEVA VIZCAYA - IFUGAO - MT. PROVINCE BDRY ROAD, KO312+060 - KO313+677, KIANGAN, IFUGAO(B) C | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱38.2M | 100% | High risk74 | —-0.024 |
| 24B00076OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ALONG MANILA NORTH ROAD | Region II | Region II | On-Going | ₱58.1M | 74% | High risk72 | Flagged0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BB0223CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM BARANGAYS CENTRO SUR AND CENTRO NORTE, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.047 |
| 20B00025ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF SAN LORENZO RUIZ BRIDGE (B01235LZ) (PARALLEL BRIDGE) ALONG DAANG MAHARLIKA (LZ) | Region II | Region II | On-Going | ₱384.8M | 94% | High risk64 | Flagged0.039 |
| 25B00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046, K0655+062 - K | Region II | Region II | On-Going | ₱125.4M | 78% | High risk95 | Flagged0.036 |
| 24B00112OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAN LORENZO RUIZ BRIDGE (B01235LZ) ALONG DAANG MAHARLIKA (LZ), PHASE I | Region II | Region II | On-Going | ₱108.4M | 88% | High risk65 | Flagged0.034 |
| 24B00113OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - BATU BR. (B01227LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱87.1M | 88% | Medium risk55 | Flagged0.031 |
| 25BK0044CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF MADDELA WATER SYSTEM, MADDELA, QUIRINO | Region II | Quirino DEO | On-Going | ₱48.8M | 29% | High risk95 | Flagged0.023 |
| 23AA0508IMPROVEMENT OF ROAD ALONG MANILA NORTH ROAD, BACARRA SECTION, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49.8M | 99% | High risk77 | Flagged0.021 |
| 24B00076OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ALONG MANILA NORTH ROAD | Region II | Region II | On-Going | ₱58.1M | 74% | High risk72 | Flagged0.020 |
| 24B00143DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/UPGRADING/REPAIR AND EQUIPPING OF RURAL HEALTH UNITS - VILLAVERDE RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱6M | 0% | Medium risk42 | Flagged0.019 |
| 24B00154DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ UPGRADING/ REPAIR AND EQUIPPING OF RHUS - BAYOMBONG RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱5.8M | 0% | Medium risk42 | Flagged0.019 |
| 17BI0031REHABILITATION/IMPROVEMENT OF MACATE FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. MACATE, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱42.6M | 100% | High risk77 | Flagged0.018 |
| 17BI0032REHABILITATION/IMPROVEMENT OF ALMAGUER SOUTH FLOOD CONTROL (STA. 0+000 - STA. 0+970), BRGY. ALMAGUER SOUTH, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.8M | 100% | High risk76 | Flagged0.018 |
| 17BI0030REHABILITATION/IMRPOVEMENT OF STO. DOMINGO FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. STO. DOMINGO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 17BI0029REHABILITATION/IMPROVEMENT OF INDIANA FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. INDIANA, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 17BI0034REHABILITATION/IMPROVEMENT OF BUSILAC FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BUSILAC, BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.1M | 100% | High risk78 | Flagged0.018 |
| 17BI0035REHABILITATION/IMPROVEMENT OF CURIFANG FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY.CURIFANG, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.5M | 100% | High risk77 | Flagged0.017 |
| 17BI0036REHABILITATION/IMPROVEMENT OF DADAP FLOOD CONTROL (STA. 0+000-STA. 0+948) BRGY. DADAP, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.4M | 100% | High risk78 | Flagged0.017 |
| 17BI0037REHABILITATION/IMPROVEMENT OF BANGAR FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BANGAR, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk78 | Flagged0.016 |
| 23AA0502IMPROVEMENT OF ROAD ALONG TANAP ROAD, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.8M | 100% | High risk76 | Flagged0.015 |
| 23AA0507IMPROVEMENT OF ROAD, POBLACION 1 AND POBLACION 2, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.7M | 100% | High risk74 | Flagged0.014 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 20BJ0021FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF APEAN RIVER FLOOD CONTROL STRUCTURES, LAMO SECTION LAMO, DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱38.1M | 100% | Medium risk44 | —-0.069 |
| 177 | 20BJ0006FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF GABUT FLOOD CONTROL STRUCTURES DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱28.5M | 100% | Medium risk44 | —-0.069 |
| 178 | 19BJ0003FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES, BONE NORTH SECTION, BONE NORTH, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.070 |
| 179 | 19BJ0011FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMCONSTRUCTION OF MARANG RIVER FLOOD CONTROL STRUCTURES, COMON SECTION, COMON, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.071 |
| 180 | 18BJ0015ASSET PRESERVATION: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS DAANG MAHARLIKA (LZ)-K0233+341-K0235+020 ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱46.2M | 100% | Medium risk44 | —-0.082 |
| 181 | 19BJ0035NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS DAANG MAHARLIKA (S00852LZ) K0225+450-K0226+860 ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱39.4M | 100% | Medium risk44 | —-0.082 |
| 182 | 22BJ0002ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE ALONG PRIMARY ROADS DAANG MAHARLIKA (LZ) K0222+459-K0225+000 ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱44.1M | 100% | Medium risk44 | —-0.079 |
| 183 | 19BJ0010FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM CONSTRUCTION OF STA. FE RIVER RIVER FLOOD CONTROL STRUCTURES, CALITLITAN SECTION CALITLITAN, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱40.1M | 100% | Medium risk44 | —-0.069 |
| 184 | 20BJ0019ROAD WIDENING SECONDARY ROADS: NUEVA VIZCAYA BENGUET ROAD, K0249+560-K0251+280, PINGKIAN, KAYAPA, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱39.7M | 100% | Medium risk44 | —-0.082 |
| 185 | 20BI0011ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL | Region II | Nueva Vizcaya DEO | Completed | ₱16M | 100% | Medium risk44 | —-0.069 |
| 186 | 20BJ0035FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN CONSTRUCTION OF STA. CRUZ RIVER CONTROL STRUCTURES, PINGKIAN SECTION PINGKIAN KAYAPA, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱30.8M | 100% | Medium risk44 | —-0.069 |
| 187 | 19BI0057ORGANIZATION OUTCOME 2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-NSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WIT | Region II | Nueva Vizcaya DEO | Completed | ₱19.6M | 100% | Medium risk44 | —-0.071 |
| 188 | 20BJ0020FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BENAY RIVER FLOOD CONTROL STRUCTURES, BAGUMBAYAN SECTION, DUPAX DEL SUR, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱21.2M | 100% | Medium risk44 | —-0.071 |
| 189 | 18B00048OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS ROAD AND DIVERSION ROAD-BAYOMBONG-SOLANO BY-PASS ROAD, INCLUDING ROW, NUEVA VIZCAYA, STA. 000+000-STA. 000+978, PROVINCE OF NUEVA VIZCAYA | Region II | Region II | Completed | ₱26.3M | 100% | Medium risk43 | —-0.083 |
| 190 | 18B00069NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - PRIMARY ROADS, DAANG MAHARLIKA (LZ), REBLOCKING; K0260+07.4 - K0260+202; K0260+248 - K0260+845.70; K0261+370 - K0261+556; WIDENING: KO268+474 - K0269+000 | Region II | Region II | Completed | ₱24.8M | 100% | Medium risk43 | —-0.083 |
| 191 | 20BI0027ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSETPRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF NATIONAL ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS-BAMBANG-KASIBU-SOLANO RD.-K0255+537- | Region II | Nueva Vizcaya DEO | Completed | ₱24.4M | 100% | Medium risk43 | —-0.083 |
| 192 | 18B00073ORGANIZATIONAL OUTCOME1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT CONSTRUCTION OF BY-PASS AND DIVERSION ROADS: BAYOMBONG-SOLANO BY-PASS ROAD, INCL ROW, NUEVA VIZCAYA | Region II | Region II | Completed | ₱24.8M | 100% | Medium risk43 | —-0.085 |
| 193 | 22BJ0001ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE ALONG PRIMARY ROADS DAANG MAHARLIKA (LZ) K0210+000-K0211+000, K0212+000-K0213+158 STA. FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱39.2M | 100% | Medium risk43 | —-0.079 |
| 194 | 20BJ0032REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, PRIMARY ROADS DAANG MAHARLIKA (S00852LZ), K0214+921.5 - K0215+395; K0214+000-K0214+312; K0211+640-K0211+829 SANTA FE, NUEVA VIZCAYA/ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱35.3M | 100% | Medium risk43 | —-0.081 |
| 195 | 20BJ0005FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES CALITLITAN SECTION CALITLITAN, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱20.5M | 100% | Medium risk43 | —-0.070 |
| 196 | 19BJ0014FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMCONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES, VILLA FLORES SECTION VILLAFLORES, STA. FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱25.8M | 100% | Medium risk43 | —-0.071 |
| 197 | 20BJ0007FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF STA. FE RIVER FLOOD CONTROL STRUCTURES VILLAFLORES SECTION, VILLAFLORES, STA. FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱17.2M | 100% | Medium risk43 | —-0.071 |
| 198 | 21BJ0008REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS JCT. NATL ROAD - BITNONG-BELANCE NV BDRY ROAD, K0269+579+K0270+447.50 BELANCE, DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱20.5M | 100% | Medium risk43 | —-0.085 |
| 199 | 22BJ0017ASSET PRESERVATION- REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS- DAANG MAHARLIKA (LZ)- K0237+260-K0237+592, K0237+627-K0237+804 ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱10.4M | 100% | Medium risk43 | —-0.084 |
| 200 | 21BI0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION-ACCESS ROAD LEADING TO LOWER MAGAT ECOTOURISM PARK, DIADI, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱9.8M | 100% | Medium risk43 | —-0.086 |