Contractor dossier
216 projects on file, including joint ventures this contractor is part of.
Total projects
216
Total budget
₱10.9B
Average progress
95.0%
Completion rate
83.8%
Average risk score
53.1
Medium risk on average, out of 100
Flagged as unusual
26
12.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 197 | ₱9.7B | 51.9 | 21 | 94.6% |
| Cordillera Administrative Region | 11 | ₱883.7M | 61.8 | 2 | 99.6% |
| Region I | 7 | ₱233.6M | 73.4 | 3 | 99.9% |
| Region V | 1 | ₱4.9M | 50.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 88 | ₱5.1B | 52.2 | 3 | 95.8% |
| Bridges | 55 | ₱2.5B | 48.5 | 7 | 95.2% |
| Flood Control and Drainage | 38 | ₱1.5B | 50.6 | 0 | 100.0% |
| OTHER | 16 | ₱802.9M | 75.5 | 11 | 98.4% |
| Buildings and Facilities | 10 | ₱195.3M | 49.5 | 2 | 80.0% |
| Bridges, Roads | 4 | ₱477.3M | 60.3 | 0 | 94.1% |
| Water Provision and Storage | 3 | ₱163.8M | 49.4 | 1 | 66.7% |
| GAA 2025 SSP | 2 | ₱174.2M | 95.2 | 2 | 53.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25B00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046, K0655+062 - K | Region II | Region II | On-Going | ₱125.4M | 78% | High risk95 | Flagged0.036 |
| 25BK0044CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF MADDELA WATER SYSTEM, MADDELA, QUIRINO | Region II | Quirino DEO | On-Going | ₱48.8M | 29% | High risk95 | Flagged0.023 |
| 16BI0036REPAIR / REHABILITATION OF CUPAS RIVER FLOOD CONTROL, STO. DOMINGO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱12.8M | 100% | High risk80 | Flagged0.013 |
| 17BI0037REHABILITATION/IMPROVEMENT OF BANGAR FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BANGAR, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk78 | Flagged0.016 |
| 17BI0034REHABILITATION/IMPROVEMENT OF BUSILAC FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BUSILAC, BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.1M | 100% | High risk78 | Flagged0.018 |
| 17BI0036REHABILITATION/IMPROVEMENT OF DADAP FLOOD CONTROL (STA. 0+000-STA. 0+948) BRGY. DADAP, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.4M | 100% | High risk78 | Flagged0.017 |
| 17BI0035REHABILITATION/IMPROVEMENT OF CURIFANG FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY.CURIFANG, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.5M | 100% | High risk77 | Flagged0.017 |
| 17BI0031REHABILITATION/IMPROVEMENT OF MACATE FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. MACATE, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱42.6M | 100% | High risk77 | Flagged0.018 |
| 23AA0508IMPROVEMENT OF ROAD ALONG MANILA NORTH ROAD, BACARRA SECTION, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49.8M | 99% | High risk77 | Flagged0.021 |
| 17P00043NETWORK DEVELOPMENT - OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, NUEVA VIZCAYA - IFUGAO - MT. PROVINCE ROAD K0337+006 - K0356+344, K0356+355 - K0359+000 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱137.7M | 100% | High risk76 | —-0.000 |
| 17P00026ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) - KIANGAN-TINOC-BUGUIAS ROAD CHAINAGE 48348 - CHAINANGE 52098 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk76 | Flagged0.002 |
| 23AA0501IMPROVEMENT OF ROAD LAOAG-VINTAR ROAD, LAOAG CITY AND VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱50.7M | 100% | High risk76 | —-0.021 |
| 17BI0030REHABILITATION/IMRPOVEMENT OF STO. DOMINGO FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. STO. DOMINGO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 17BI0032REHABILITATION/IMPROVEMENT OF ALMAGUER SOUTH FLOOD CONTROL (STA. 0+000 - STA. 0+970), BRGY. ALMAGUER SOUTH, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.8M | 100% | High risk76 | Flagged0.018 |
| 17BI0029REHABILITATION/IMPROVEMENT OF INDIANA FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. INDIANA, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 23AA0502IMPROVEMENT OF ROAD ALONG TANAP ROAD, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.8M | 100% | High risk76 | Flagged0.015 |
| 23AA0507IMPROVEMENT OF ROAD, POBLACION 1 AND POBLACION 2, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.7M | 100% | High risk74 | Flagged0.014 |
| 18BI0024ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOODMANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES, BONFAL EAST SECTION | Region II | Nueva Vizcaya DEO | Completed | ₱18.8M | 100% | High risk74 | —-0.028 |
| 21P00059CLUSTER: (A) ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - NUEVA VIZCAYA - IFUGAO - MT. PROVINCE BDRY ROAD, KO312+060 - KO313+677, KIANGAN, IFUGAO(B) C | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱38.2M | 100% | High risk74 | —-0.024 |
| 24B00076OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ALONG MANILA NORTH ROAD | Region II | Region II | On-Going | ₱58.1M | 74% | High risk72 | Flagged0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BB0223CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM BARANGAYS CENTRO SUR AND CENTRO NORTE, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.047 |
| 20B00025ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF SAN LORENZO RUIZ BRIDGE (B01235LZ) (PARALLEL BRIDGE) ALONG DAANG MAHARLIKA (LZ) | Region II | Region II | On-Going | ₱384.8M | 94% | High risk64 | Flagged0.039 |
| 25B00015CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG MANILA NORTH RD - K0654+387.30 - K0655+046, K0655+062 - K | Region II | Region II | On-Going | ₱125.4M | 78% | High risk95 | Flagged0.036 |
| 24B00112OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - SAN LORENZO RUIZ BRIDGE (B01235LZ) ALONG DAANG MAHARLIKA (LZ), PHASE I | Region II | Region II | On-Going | ₱108.4M | 88% | High risk65 | Flagged0.034 |
| 24B00113OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - BATU BR. (B01227LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱87.1M | 88% | Medium risk55 | Flagged0.031 |
| 25BK0044CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF MADDELA WATER SYSTEM, MADDELA, QUIRINO | Region II | Quirino DEO | On-Going | ₱48.8M | 29% | High risk95 | Flagged0.023 |
| 23AA0508IMPROVEMENT OF ROAD ALONG MANILA NORTH ROAD, BACARRA SECTION, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱49.8M | 99% | High risk77 | Flagged0.021 |
| 24B00076OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - ALONG MANILA NORTH ROAD | Region II | Region II | On-Going | ₱58.1M | 74% | High risk72 | Flagged0.020 |
| 24B00143DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/UPGRADING/REPAIR AND EQUIPPING OF RURAL HEALTH UNITS - VILLAVERDE RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱6M | 0% | Medium risk42 | Flagged0.019 |
| 24B00154DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ UPGRADING/ REPAIR AND EQUIPPING OF RHUS - BAYOMBONG RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱5.8M | 0% | Medium risk42 | Flagged0.019 |
| 17BI0031REHABILITATION/IMPROVEMENT OF MACATE FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. MACATE, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱42.6M | 100% | High risk77 | Flagged0.018 |
| 17BI0032REHABILITATION/IMPROVEMENT OF ALMAGUER SOUTH FLOOD CONTROL (STA. 0+000 - STA. 0+970), BRGY. ALMAGUER SOUTH, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.8M | 100% | High risk76 | Flagged0.018 |
| 17BI0030REHABILITATION/IMRPOVEMENT OF STO. DOMINGO FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. STO. DOMINGO, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 17BI0029REHABILITATION/IMPROVEMENT OF INDIANA FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. INDIANA, BAMBANG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk76 | Flagged0.018 |
| 17BI0034REHABILITATION/IMPROVEMENT OF BUSILAC FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BUSILAC, BAYOMBONG, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.1M | 100% | High risk78 | Flagged0.018 |
| 17BI0035REHABILITATION/IMPROVEMENT OF CURIFANG FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY.CURIFANG, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.5M | 100% | High risk77 | Flagged0.017 |
| 17BI0036REHABILITATION/IMPROVEMENT OF DADAP FLOOD CONTROL (STA. 0+000-STA. 0+948) BRGY. DADAP, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.4M | 100% | High risk78 | Flagged0.017 |
| 17BI0037REHABILITATION/IMPROVEMENT OF BANGAR FLOOD CONTROL (STA. 0+000 - STA. 0+948) BRGY. BANGAR, SOLANO, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱43.6M | 100% | High risk78 | Flagged0.016 |
| 23AA0502IMPROVEMENT OF ROAD ALONG TANAP ROAD, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱18.8M | 100% | High risk76 | Flagged0.015 |
| 23AA0507IMPROVEMENT OF ROAD, POBLACION 1 AND POBLACION 2, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱20.7M | 100% | High risk74 | Flagged0.014 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 20BJ0017ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED OF PAVED ROADS-TERTIARY ROADS- JCT. NATIONAL ROAD-BITNONG-BELANCE-NUEVA VIZCAYA BDRY ROAD K0268+668-K0269+000 & K0269+465-K0269+579 DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱10.4M | 100% | Medium risk43 | —-0.085 |
| 202 | 24B00119CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER 11239 - IMPROVEMENT OF INTERSECTION DAANG MAHARLIKA (S00857LZ) - K0249 + 800 AND BAMBANG KASIBU - SOLANO ROAD (S00880LZ) | Region II | Region II | On-Going | ₱9.6M | 65% | Medium risk43 | —-0.046 |
| 203 | 21BJ0030REHABILITATION/ RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE (TERTIARY ROAD) NUEVA VIZCAYA - PANGASINAN ROAD (K0223+150-K0223+190) & (K0223+230-K0223+280) NUEVA VIZCAYA-PANGASINAN SECTION, STA. FE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱34.9M | 100% | Medium risk43 | —-0.080 |
| 204 | 24B00154DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/ UPGRADING/ REPAIR AND EQUIPPING OF RHUS - BAYOMBONG RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱5.8M | 0% | Medium risk42 | Flagged0.019 |
| 205 | 24B00143DEPARTMENT OF HEALTH - FY 2024 HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP): RURAL HEALTH UNITS (RURAL HEALTH UNIT) - COMPLETION/UPGRADING/REPAIR AND EQUIPPING OF RURAL HEALTH UNITS - VILLAVERDE RURAL HEALTH UNIT | Region II | Region II | On-Going | ₱6M | 0% | Medium risk42 | Flagged0.019 |
| 206 | 21BJ0075CONCRETING OF SITIO LIMAN, BRGY. SIGUEM FARM TO MARKET ROAD, BRGY. SIGUEM, KASIBU, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱11.9M | 100% | Medium risk39 | —-0.033 |
| 207 | 18BJ0022BRIDGE-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BITNONG BRIDGE NO. 2 (B02128LZ), ALONG JCT. NATIONAL-BITNONG-BELANCE-NUEVA VIZCAYA BDRY. ROAD BRGY. BITNONG, DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱4.1M | 100% | Low risk28 | —-0.048 |
| 208 | 20BJ0036BRIDGE PROGRAM: RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, NAGCUARTELAN BR. (B01221LZ) ALONG DAANG MAHARLIKA (LZ), NAGCUARTELAN, ARITAO, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱4.5M | 100% | Low risk28 | —-0.048 |
| 209 | 25B00124OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - NAGCUARTELAN BR. (B01221LZ) ALONG MAHARLIKA HIGHWAY | Region II | Region II | On-Going | ₱2.8M | 0% | Low risk26 | Flagged0.003 |
| 210 | 17BJ0019ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY JCT. NATIONAL ROAD-BITNONG-BELANCE-NUEVA VIZCAYA ROAD K0265+598.10-K0265+611.60 DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱981.2K | 100% | Low risk24 | —-0.050 |
| 211 | 18BI0121REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS ALONG DAANGMAHARLIKA (LZ) K0288+000-K0288+359, TAPAYA, VILLAROS, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱4.6M | 100% | Low risk24 | —-0.080 |
| 212 | 18BI0116ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS-DAANG MAHARLIKA- (LZ) K0249+954-K0251+797, K0288+000-K0288+359, BAMBANG AND | Region II | Nueva Vizcaya DEO | Completed | ₱4.1M | 100% | Low risk24 | —-0.083 |
| 213 | 24B00080CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239: INSTALLATION OF SIGNAGE-WARNING, ADVISORY AND REGULATORY SIGNS, PAVEMENT MARKINGS, AND STREET LIGHTS ALONG DAANG MAHARLIKA (LZ) (S00857LZ) - K024 | Region II | Region II | On-Going | ₱3.5M | 100% | Low risk24 | —-0.054 |
| 214 | 19BI0048LOCAL ROADS AND BRIDGES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF BRIDGE- REHABILITATION/MAJOR REPAIR OF HANGING BRIDGE, BRGY. AURORA, QUEZON, NUEVA VIZCAYA | Region II | Nueva Vizcaya DEO | Completed | ₱959.5K | 100% | Low risk20 | —-0.042 |
| 215 | 16BJ0073RESTORATION OF ERODED SHOULDER/ROADSLIP AND STONE MASONRY WALL ALONG ARITAO-QUIRINO ROAD (INTERMITTENT SECTIONS), K0258+150-K0258+179; K0258+179-K0258+250; K0259+800-K0259+825; K0259+850-K0259+865 DUPAX DEL NORTE, NUEVA VIZCAYA | Region II | Nueva Vizcaya 2nd DEO | Completed | ₱3.4M | 100% | Low risk19 | —-0.004 |
| 216 | 24B00081CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SIGNAGE-WARNING, ADVISORY AND REGULATORY SIGNS, PAVEMENT MARKINGS, AND STREET LIGHTS ALONG DAANG MAHARLIKA (LZ) (S00852LZ) | Region II | Region II | Completed | ₱1.1M | 100% | Low risk18 | —-0.078 |