Contractor dossier
225 projects on file, including joint ventures this contractor is part of.
Total projects
225
Total budget
₱2.4B
Average progress
96.2%
Completion rate
90.7%
Average risk score
31.7
Medium risk on average, out of 100
Flagged as unusual
5
2.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 218 | ₱2.2B | 31.3 | 5 | 96.4% |
| Negros Island Region | 6 | ₱258M | 47.0 | 0 | 86.5% |
| Region VIII | 1 | ₱14.6M | 33.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 141 | ₱1B | 26.0 | 3 | 96.7% |
| Roads | 53 | ₱680.9M | 40.5 | 1 | 95.1% |
| Flood Control and Drainage | 18 | ₱564.4M | 45.0 | 0 | 98.6% |
| Water Provision and Storage | 7 | ₱24.7M | 26.3 | 0 | 100.0% |
| Bridges | 4 | ₱63.8M | 43.4 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱49M | 91.4 | 0 | 72.6% |
| OTHER | 1 | ₱29.2M | 64.0 | 1 | 14.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HD0119ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF FLOOD CONTROL STRUCTURE ALONG NAGA RIVER (UPSTREAM), TINAAN, CITY OF NAGA, | Region VII | Cebu 1st DEO | On-Going | ₱49M | 73% | High risk91 | —-0.010 |
| 25HN0181SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) -EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION OF EVACUATION CENTER AT BRGY. CANJULAO (PHASE 2), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱49.2M | 0% | High risk66 | —-0.003 |
| 24HE0056ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF LUTAC RIVER FLOOD CONTROL STRUCTURE, NAGA CITY, CEB | Region VII | Cebu 1st DEO | Completed | ₱120.6M | 100% | High risk65 | —-0.063 |
| 25HN0183NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE FACILITIES - CONSTRUCTION OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱29.2M | 15% | High risk64 | Flagged0.025 |
| 24HE0059ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF MAINIT RIVER FLOOD CONTROL STRUCTURE, NAGA CITY, CE | Region VII | Cebu 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HD0193REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS - CONCRETING OF BRGY. CAGAY FMR, BRGY. CAGAY, SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱14.9M | 16% | Medium risk48 | Flagged0.027 |
| 24H00151LGU HOSPITALS-NAGA CITY HOSPITAL, CEBU | Region VII | Region VII | On-Going | ₱69.6M | 86% | Medium risk55 | Flagged0.025 |
| 25HN0183NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE FACILITIES - CONSTRUCTION OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱29.2M | 15% | High risk64 | Flagged0.025 |
| 24HE0232CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SITIO PROPER MAGHAWAY, CITY OF TALISAY, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱14.8M | 40% | Medium risk44 | Flagged0.009 |
| 24HE0230CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) -MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF FEMALE DORM, BJMP - TALISAY CITY JAIL, MAGHAWAY, CITY OF TALISAY, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱14.8M | 52% | Medium risk44 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24HE0138LOCAL PROGRAM - NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF DPWH CEBU 2ND DEO OFFICE, BRGY. BIASONG, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱29.4M | 100% | Medium risk49 | —-0.091 |
| 27 | 23HE0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - ACCESS RDS. AND/OR BRIDGES FROM THE NAT'L. RD./S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES - MPBS/FACILITIES TO SUPPORT SOCIAL SERV.- CONST. OF SCH. BLDG., TALISAY CITY COLLEGE, POBLACION, TALISA | Region VII | Cebu 1st DEO | Completed | ₱48.2M | 100% | Medium risk49 | —-0.044 |
| 28 | 23HE0137CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING IN BRGY. JACLUPAN, TALISAY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱14.8M | 100% | Medium risk48 | —-0.094 |
| 29 | 24HH0115CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY LUZ, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱4.9M | 100% | Medium risk48 | —-0.054 |
| 30 | 25HD0128CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY LAGTANG, CITY OF TALISAY, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱4.9M | 83% | Medium risk48 | —-0.055 |
| 31 | 24HE0074CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, LAGTANG, CITY OF TALISAY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 32 | 22HE0049CONVERGENCE ANS SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CAMP 8, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 33 | 25HD0115CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY JACLUPAN, CITY OF TALISAY, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱4.9M | 100% | Medium risk48 | —-0.064 |
| 34 | 22HE0050CONVERGENCE ANS SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY JACLUPAN, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.095 |
| 35 | 20HE0087BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION AND/OR REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. CUANOS, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 36 | 22HE0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CAMP 7, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 37 | 23HL0006ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF SIATON RIVER CONTROL (DO | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.066 |
| 38 | 21HE0025LOCAL PROGRAM - BUILDING AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF TWO-STOREY (DPWH STANDARD DESIGN) OFFICE BUILDING, DPWH CEBU 2ND DEO, CEBU | Region VII | Cebu 1st DEO | Completed | ₱19.6M | 100% | Medium risk48 | —-0.093 |
| 39 | 21HE0083LOCAL PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY JACLUPAN, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱5M | 100% | Medium risk48 | —-0.096 |
| 40 | 24HE0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) BUREAU OF JAIL MANAGEMENT AND PENELOGY, BRGY. MAGHAWAY, CITY OF TALISAY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱6.9M | 100% | Medium risk48 | —-0.096 |
| 41 | 25HD0193REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS - CONCRETING OF BRGY. CAGAY FMR, BRGY. CAGAY, SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱14.9M | 16% | Medium risk48 | Flagged0.027 |
| 42 | 21HE0018ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE ALONG NBA FLOOD CONTROL STRUCTURE (NUESTRA SRA DEL PILLAR) - K0049+000 - | Region VII | Cebu 1st DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.077 |
| 43 | 22HE0044CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.9M | 100% | Medium risk47 | —-0.093 |
| 44 | 23HE0133ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF MAINIT RIVER FLOOD CONTROL STRUCTURE, NAGA CIT | Region VII | Cebu 1st DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.078 |
| 45 | 23HE0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF EVACUATION CENTER IN SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱7.9M | 100% | Medium risk47 | —-0.093 |
| 46 | 24HE0192CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, LINAO-LIPATA, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱4.9M | 0% | Medium risk47 | —-0.018 |
| 47 | 22HE0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CADULAWAN, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.094 |
| 48 | 24HH0075CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) -FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BRGY. BUDLA-AN, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱4.9M | 100% | Medium risk47 | —-0.035 |
| 49 | 24HE0137CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS CENTER), CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.095 |
| 50 | 23HE0148CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, LINAO, CITY OF TALISAY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.094 |