Contractor dossier
389 projects on file, including joint ventures this contractor is part of.
Total projects
389
Total budget
₱14.9B
Average progress
97.7%
Completion rate
90.7%
Average risk score
32.1
Medium risk on average, out of 100
Flagged as unusual
29
7.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 344 | ₱13.2B | 30.2 | 28 | 97.8% |
| Region XI | 24 | ₱933.2M | 48.1 | 1 | 99.8% |
| Region X | 6 | ₱64.5M | 27.7 | 0 | 100.0% |
| Region XIII | 5 | ₱263.9M | 56.2 | 0 | 100.0% |
| Region I | 4 | ₱339.6M | 55.7 | 0 | 74.5% |
| Region IX | 3 | ₱28.4M | 53.3 | 0 | 100.0% |
| Region VIII | 2 | ₱85.3M | 48.4 | 0 | 100.0% |
| Region VI | 1 | ₱17M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 155 | ₱7.1B | 30.8 | 4 | 98.8% |
| Buildings and Facilities | 95 | ₱1.1B | 17.1 | 0 | 100.0% |
| Bridges | 54 | ₱1.6B | 27.7 | 2 | 98.1% |
| Flood Control and Drainage | 48 | ₱2.3B | 34.8 | 1 | 99.9% |
| OTHER | 18 | ₱1.4B | 76.5 | 9 | 96.4% |
| GAA 2025 OO-1 | 12 | ₱987.2M | 92.7 | 10 | 73.1% |
| GAA 2025 SSP | 3 | ₱107.8M | 92.7 | 3 | 59.2% |
| Bridges, Roads | 3 | ₱358.4M | 52.4 | 0 | 71.6% |
| Water Provision and Storage | 1 | ₱2M | 9.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25M00260PREVENTIVE MAINTENANCE - DULAWAN-MARBEL RD - K1752 + 600 - K1753 + 600, LAMBAYONG, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱70.1M | 98% | High risk94 | Flagged0.003 |
| 25MI0031BUKIDNON-COTABATO RD - K1629 + 625 - K1629 + 905 | Region XII | Cotabato 3rd DEO | On-Going | ₱105.6M | 30% | High risk94 | Flagged0.030 |
| 25MI0028BUKIDNON-COTABATO RD - K1629 + 207 - K1629 + 325 | Region XII | Cotabato 3rd DEO | On-Going | ₱66.4M | 98% | High risk94 | Flagged0.000 |
| 25M00076PAVING OF UNPAVED ROADS - SNA - LEBAK -KALAMNSIG RD - K1888 + 846 - K1891 + 286, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱197.9M | 53% | High risk94 | Flagged0.040 |
| 25MF0039CONSTRUCTION OF BRIDGE, MAINDANG TO MAMALI, MAINDANG BRIDGE, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱93.6M | 46% | High risk94 | Flagged0.037 |
| 25M00187PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (MARBEL-ALLAH VALLEY-COTABATO RD) - K1769 + 689 - K1770 + 817, ISULAN, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱145.1M | 94% | High risk94 | Flagged0.019 |
| 25MI0013MAKILALA-ALLAH VALLEY RD - K1621 + 352 - K1621 + 547 | Region XII | Cotabato 3rd DEO | On-Going | ₱93M | 100% | High risk93 | Flagged0.008 |
| 25MI0054MAKILALA-ALLAH VALLEY RD - K1621 + 892 - K1622 + 000 | Region XII | Cotabato 3rd DEO | On-Going | ₱60.4M | 54% | High risk93 | Flagged0.020 |
| 25MI0085CONCRETING OF ROAD IN BARANGAY LEPAGA, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱9.4M | 80% | High risk92 | Flagged0.021 |
| 25MF0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAJAH MUDA, TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱4.8M | 52% | High risk92 | Flagged0.028 |
| 25MI0055MAKILALA-ALLAH VALLEY RD - K1622+155 - K1622+265 | Region XII | Cotabato 3rd DEO | On-Going | ₱40.9M | 60% | High risk91 | Flagged0.017 |
| 25MI0015MAKILALA-ALLAH VALLEY RD - K1621 + 150 - K1621 + 200 | Region XII | Cotabato 3rd DEO | On-Going | ₱17.2M | 98% | High risk89 | —-0.000 |
| 20MC0116CONSTRUCTION OF GUANGAN BRIDGE, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱38.6M | 100% | High risk86 | Flagged0.024 |
| 25MH0021WIDENING OF BRIDGE - KAWA BR. 1 (B01540MN) ALONG SNA-LEBAK-KALAMANSIG RD | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱19.9M | 100% | High risk85 | —-0.030 |
| 24M00005WIDENING OF BRIDGE - CARMEN PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+008 -K1652+230.55, CARMEN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱122.7M | 100% | High risk81 | Flagged0.008 |
| 24MC0013CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO- BUKIDNON RD - K1684 + 820 - K1684 + 892, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk80 | Flagged0.012 |
| 24M00258CONSTRUCTION OF KABULNAN BRIDGE, KM1796+044.69 - 1796+134.69 , DATU HOFFER AMPATUAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱77M | 73% | High risk79 | Flagged0.013 |
| 21L00143CONSTRUCTION OF ACCESS ROAD LEADING TO WASTE-TO-ENERGY (WTE) FACILITY, DAVAO CITY | Region XI | Region XI | On-Going | ₱173.7M | 95% | High risk79 | Flagged0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21L00143CONSTRUCTION OF ACCESS ROAD LEADING TO WASTE-TO-ENERGY (WTE) FACILITY, DAVAO CITY | Region XI | Region XI | On-Going | ₱173.7M | 95% | High risk79 | Flagged0.049 |
| 25M00076PAVING OF UNPAVED ROADS - SNA - LEBAK -KALAMNSIG RD - K1888 + 846 - K1891 + 286, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱197.9M | 53% | High risk94 | Flagged0.040 |
| 25MF0039CONSTRUCTION OF BRIDGE, MAINDANG TO MAMALI, MAINDANG BRIDGE, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱93.6M | 46% | High risk94 | Flagged0.037 |
| 25MI0031BUKIDNON-COTABATO RD - K1629 + 625 - K1629 + 905 | Region XII | Cotabato 3rd DEO | On-Going | ₱105.6M | 30% | High risk94 | Flagged0.030 |
| 25MI0093CONSTRUCTION OF BRIDGE, LEADING TO THE BOUNDARY OF THE CENTRAL MINDANAO AIRPORT, BRGY. NEW RIZAL, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱56.4M | 0% | Medium risk50 | Flagged0.029 |
| 25MF0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAJAH MUDA, TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱4.8M | 52% | High risk92 | Flagged0.028 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 20MC0116CONSTRUCTION OF GUANGAN BRIDGE, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱38.6M | 100% | High risk86 | Flagged0.024 |
| 25MI0085CONCRETING OF ROAD IN BARANGAY LEPAGA, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱9.4M | 80% | High risk92 | Flagged0.021 |
| 25MI0054MAKILALA-ALLAH VALLEY RD - K1621 + 892 - K1622 + 000 | Region XII | Cotabato 3rd DEO | On-Going | ₱60.4M | 54% | High risk93 | Flagged0.020 |
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25M00187PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (MARBEL-ALLAH VALLEY-COTABATO RD) - K1769 + 689 - K1770 + 817, ISULAN, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱145.1M | 94% | High risk94 | Flagged0.019 |
| 16MH0050REHABILITATION OF BUGSO-KAMISON-MATANAO-GAPOK FMR, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱35.6M | 100% | Medium risk37 | Flagged0.018 |
| 25MI0055MAKILALA-ALLAH VALLEY RD - K1622+155 - K1622+265 | Region XII | Cotabato 3rd DEO | On-Going | ₱40.9M | 60% | High risk91 | Flagged0.017 |
| 24ME0099CONSTRUCTION OF GLAN RIVER FLOOD CONTROL STRUCTURE, GLAN, SARANGANI PROVINCE, PHASE II, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱96.4M | 99% | High risk77 | Flagged0.014 |
| 24M00258CONSTRUCTION OF KABULNAN BRIDGE, KM1796+044.69 - 1796+134.69 , DATU HOFFER AMPATUAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱77M | 73% | High risk79 | Flagged0.013 |
| 24MC0013CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO- BUKIDNON RD - K1684 + 820 - K1684 + 892, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk80 | Flagged0.012 |
| 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |
| 17MC0198REHAB. OF BITUAN-BACONG FMR, TULUNAN, NORTH COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱30.5M | 100% | Medium risk38 | Flagged0.011 |
| 24MH0009CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1925+000 - K1925+246 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱86.8M | 100% | High risk76 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 22MF0035CONSTRUCTION OF ROAD, BARANGAY POBLACION, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱4.9M | 100% | Low risk26 | —-0.086 |
| 227 | 19MC0080CONSTRUCTION OF REVETMENT- CONSTRUCTION OF THE REVETMENT ALONG POBLACION-DUNGOS RIVER, TULUNAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱29.4M | 100% | Low risk26 | —-0.074 |
| 228 | 22MI0048PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG MATALAM - MLANG - BAGONTAPAY JCT RD (S00706MN) - K1657+144 - K1657+381 | Region XII | Cotabato 3rd DEO | Completed | ₱10.2M | 100% | Low risk26 | —-0.088 |
| 229 | 18MC0116CONSTRUCTION OF REVETMENT ALONG M'LANG RIVER (SBC SECTION PHASE III), M'LANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱24.5M | 100% | Low risk26 | —-0.074 |
| 230 | 23MI0041CONSTRUCTION OF ROAD, PUROK 3, SAMOÑEZA ST., BRGY. DAIG, TULUNAN, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱9.9M | 100% | Low risk26 | —-0.084 |
| 231 | 18MC0115CONSTRUCTION OF M'LANG RIVER FLOOD CONTROL, M'LANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱29.4M | 100% | Low risk26 | —-0.073 |
| 232 | 20M00153CONSTRUCTION OF LOCAL ROADS IN BARANGAY PALMA PEREZ-BARANGAY LA FORTUNA-BARANGAY LA SUERTE, MLANG, COTABATO. | Region XII | Region XII | Completed | ₱11.4M | 100% | Low risk26 | —-0.089 |
| 233 | 23MI0084MATALAM-MLANG-BAGONTAPAY JCT RD - K1655 + 000 - K1655 + 815 | Region XII | Cotabato 3rd DEO | Completed | ₱21.5M | 100% | Low risk26 | —-0.089 |
| 234 | 22MI0046PREVENTIVE MAINTENANCE OF ROAD - ASPHALT OVERLAY - ALONG MATALAM - MLANG - BAGONTAPAY JCT RD (S00706MN) - K1655+750 - K1656+246 | Region XII | Cotabato 3rd DEO | Completed | ₱24.6M | 100% | Low risk26 | —-0.089 |
| 235 | 22MF0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PUROK RIVERSIDE, BRGY. MADANDING, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱35.5M | 100% | Low risk26 | —-0.068 |
| 236 | 21MI0098RECONSTRUCTION TO CONCRETE PAVEMENT - MATALAM-MLANG-BAGONTAPAY JCT. RD. - K1660+527 - K1660+635, K1661+168 - K1661+249, K1661+687 - K1661+723, K1662+064 - K1662+178, K1662+223 - K1662+259, K1663+333 - K1663+504, K1663+600 - K1663+699 | Region XII | Cotabato 3rd DEO | Completed | ₱20.8M | 100% | Low risk26 | —-0.088 |
| 237 | 18MC0106CONSTRUCTION OF MARBEL RIVER FLOOD CONTROL, MATALAM, NORTH COTABATO STA. 4+077-STA. 4+401 L=324 LM RIGHT BANK | Region XII | Cotabato 2nd DEO | Completed | ₱29.4M | 100% | Low risk26 | —-0.073 |
| 238 | 18MC0108CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL, MATALAM, NORTH COTABATO STA. 28+500-STA. 28+900 L=400 LM RIGHT BANK | Region XII | Cotabato 2nd DEO | Completed | ₱24.5M | 100% | Low risk26 | —-0.075 |
| 239 | 21MI0021ROAD WIDENING - MAKILALA - ALLAH VALLEY RD. - K1641+423 - K1641+638, MLANG, NORTH COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱6M | 100% | Low risk26 | —-0.088 |
| 240 | 23MI0065CONSTRUCTION OF MALASILA RIVER IRRIGATION SYSTEM LATERAL A1A SERVICE ROAD, TULUNAN, NORTH COTABATO (KATUBIGAN - KALSADA TUNGO SA PATUBIGAN) | Region XII | Cotabato 3rd DEO | Completed | ₱8.8M | 100% | Low risk26 | —-0.089 |
| 241 | 22MF0043CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, PRESIDENT QUIRINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱4.9M | 100% | Low risk26 | —-0.087 |
| 242 | 19MC0172CONSTRUCTION OF LOCAL ROAD IN BRGY. NEW RIZAL, MLANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.9M | 100% | Low risk26 | —-0.086 |
| 243 | 19MC0165CONSTRUCTION OF LOCAL ROAD IN BARANGAY POBLACION B, MLANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱5.9M | 100% | Low risk25 | —-0.086 |
| 244 | 24MC0106PREVENTIVE MAINTENANCE OF ROAD- ASPHALT OVERLAY ALONG KIDAPAWAN- ILOMAVIS TOURIST RD- K1631+491- K1632+691, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱27.7M | 100% | Low risk25 | —-0.087 |
| 245 | 25MI0099CONSTRUCTION OF ROAD FROM NEW ABRA BRIDGE TO SITIO STO. NIÑO, BARANGAY NEW ABRA, MATALAM, NORTH COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱9.4M | 11% | Low risk25 | —-0.024 |
| 246 | 23MI0054CONSTRUCTION OF BRIDGE AT DALUPUAN RIVER IN BRGY. NEW ABRA, MATALAM, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱45.2M | 100% | Low risk25 | —-0.055 |
| 247 | 19MC0076RECONSTRUCTION TO CONCRETE PAVEMENT- ALONG MATALAM-M'LANG-BAGONTAPAY RD K1649+030 TO K1650+000, M'LANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱26.1M | 100% | Low risk25 | —-0.089 |
| 248 | 19MC0195CONSTRUCTION OF LOCAL ROAD IN BARANGAY NEW ANTIQUE, M'LANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.087 |
| 249 | 19MC0193CONSTRUCTION OF LOCAL ROAD, BARANGAY KATIPUNAN, MLANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.088 |
| 250 | 23MC0063CONSTRUCTION OF CITY HOSPITAL BUILDING, BRGY. POLACION, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱49.5M | 100% | Low risk25 | —-0.077 |