Contractor dossier
389 projects on file, including joint ventures this contractor is part of.
Total projects
389
Total budget
₱14.9B
Average progress
97.7%
Completion rate
90.7%
Average risk score
32.1
Medium risk on average, out of 100
Flagged as unusual
29
7.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 344 | ₱13.2B | 30.2 | 28 | 97.8% |
| Region XI | 24 | ₱933.2M | 48.1 | 1 | 99.8% |
| Region X | 6 | ₱64.5M | 27.7 | 0 | 100.0% |
| Region XIII | 5 | ₱263.9M | 56.2 | 0 | 100.0% |
| Region I | 4 | ₱339.6M | 55.7 | 0 | 74.5% |
| Region IX | 3 | ₱28.4M | 53.3 | 0 | 100.0% |
| Region VIII | 2 | ₱85.3M | 48.4 | 0 | 100.0% |
| Region VI | 1 | ₱17M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 155 | ₱7.1B | 30.8 | 4 | 98.8% |
| Buildings and Facilities | 95 | ₱1.1B | 17.1 | 0 | 100.0% |
| Bridges | 54 | ₱1.6B | 27.7 | 2 | 98.1% |
| Flood Control and Drainage | 48 | ₱2.3B | 34.8 | 1 | 99.9% |
| OTHER | 18 | ₱1.4B | 76.5 | 9 | 96.4% |
| GAA 2025 OO-1 | 12 | ₱987.2M | 92.7 | 10 | 73.1% |
| GAA 2025 SSP | 3 | ₱107.8M | 92.7 | 3 | 59.2% |
| Bridges, Roads | 3 | ₱358.4M | 52.4 | 0 | 71.6% |
| Water Provision and Storage | 1 | ₱2M | 9.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25M00260PREVENTIVE MAINTENANCE - DULAWAN-MARBEL RD - K1752 + 600 - K1753 + 600, LAMBAYONG, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱70.1M | 98% | High risk94 | Flagged0.003 |
| 25MI0031BUKIDNON-COTABATO RD - K1629 + 625 - K1629 + 905 | Region XII | Cotabato 3rd DEO | On-Going | ₱105.6M | 30% | High risk94 | Flagged0.030 |
| 25MI0028BUKIDNON-COTABATO RD - K1629 + 207 - K1629 + 325 | Region XII | Cotabato 3rd DEO | On-Going | ₱66.4M | 98% | High risk94 | Flagged0.000 |
| 25M00076PAVING OF UNPAVED ROADS - SNA - LEBAK -KALAMNSIG RD - K1888 + 846 - K1891 + 286, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱197.9M | 53% | High risk94 | Flagged0.040 |
| 25MF0039CONSTRUCTION OF BRIDGE, MAINDANG TO MAMALI, MAINDANG BRIDGE, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱93.6M | 46% | High risk94 | Flagged0.037 |
| 25M00187PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (MARBEL-ALLAH VALLEY-COTABATO RD) - K1769 + 689 - K1770 + 817, ISULAN, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱145.1M | 94% | High risk94 | Flagged0.019 |
| 25MI0013MAKILALA-ALLAH VALLEY RD - K1621 + 352 - K1621 + 547 | Region XII | Cotabato 3rd DEO | On-Going | ₱93M | 100% | High risk93 | Flagged0.008 |
| 25MI0054MAKILALA-ALLAH VALLEY RD - K1621 + 892 - K1622 + 000 | Region XII | Cotabato 3rd DEO | On-Going | ₱60.4M | 54% | High risk93 | Flagged0.020 |
| 25MI0085CONCRETING OF ROAD IN BARANGAY LEPAGA, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱9.4M | 80% | High risk92 | Flagged0.021 |
| 25MF0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAJAH MUDA, TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱4.8M | 52% | High risk92 | Flagged0.028 |
| 25MI0055MAKILALA-ALLAH VALLEY RD - K1622+155 - K1622+265 | Region XII | Cotabato 3rd DEO | On-Going | ₱40.9M | 60% | High risk91 | Flagged0.017 |
| 25MI0015MAKILALA-ALLAH VALLEY RD - K1621 + 150 - K1621 + 200 | Region XII | Cotabato 3rd DEO | On-Going | ₱17.2M | 98% | High risk89 | —-0.000 |
| 20MC0116CONSTRUCTION OF GUANGAN BRIDGE, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱38.6M | 100% | High risk86 | Flagged0.024 |
| 25MH0021WIDENING OF BRIDGE - KAWA BR. 1 (B01540MN) ALONG SNA-LEBAK-KALAMANSIG RD | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱19.9M | 100% | High risk85 | —-0.030 |
| 24M00005WIDENING OF BRIDGE - CARMEN PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+008 -K1652+230.55, CARMEN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱122.7M | 100% | High risk81 | Flagged0.008 |
| 24MC0013CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO- BUKIDNON RD - K1684 + 820 - K1684 + 892, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk80 | Flagged0.012 |
| 24M00258CONSTRUCTION OF KABULNAN BRIDGE, KM1796+044.69 - 1796+134.69 , DATU HOFFER AMPATUAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱77M | 73% | High risk79 | Flagged0.013 |
| 21L00143CONSTRUCTION OF ACCESS ROAD LEADING TO WASTE-TO-ENERGY (WTE) FACILITY, DAVAO CITY | Region XI | Region XI | On-Going | ₱173.7M | 95% | High risk79 | Flagged0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21L00143CONSTRUCTION OF ACCESS ROAD LEADING TO WASTE-TO-ENERGY (WTE) FACILITY, DAVAO CITY | Region XI | Region XI | On-Going | ₱173.7M | 95% | High risk79 | Flagged0.049 |
| 25M00076PAVING OF UNPAVED ROADS - SNA - LEBAK -KALAMNSIG RD - K1888 + 846 - K1891 + 286, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱197.9M | 53% | High risk94 | Flagged0.040 |
| 25MF0039CONSTRUCTION OF BRIDGE, MAINDANG TO MAMALI, MAINDANG BRIDGE, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱93.6M | 46% | High risk94 | Flagged0.037 |
| 25MI0031BUKIDNON-COTABATO RD - K1629 + 625 - K1629 + 905 | Region XII | Cotabato 3rd DEO | On-Going | ₱105.6M | 30% | High risk94 | Flagged0.030 |
| 25MI0093CONSTRUCTION OF BRIDGE, LEADING TO THE BOUNDARY OF THE CENTRAL MINDANAO AIRPORT, BRGY. NEW RIZAL, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱56.4M | 0% | Medium risk50 | Flagged0.029 |
| 25MF0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAJAH MUDA, TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱4.8M | 52% | High risk92 | Flagged0.028 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 20MC0116CONSTRUCTION OF GUANGAN BRIDGE, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱38.6M | 100% | High risk86 | Flagged0.024 |
| 25MI0085CONCRETING OF ROAD IN BARANGAY LEPAGA, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱9.4M | 80% | High risk92 | Flagged0.021 |
| 25MI0054MAKILALA-ALLAH VALLEY RD - K1621 + 892 - K1622 + 000 | Region XII | Cotabato 3rd DEO | On-Going | ₱60.4M | 54% | High risk93 | Flagged0.020 |
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25M00187PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (MARBEL-ALLAH VALLEY-COTABATO RD) - K1769 + 689 - K1770 + 817, ISULAN, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱145.1M | 94% | High risk94 | Flagged0.019 |
| 16MH0050REHABILITATION OF BUGSO-KAMISON-MATANAO-GAPOK FMR, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱35.6M | 100% | Medium risk37 | Flagged0.018 |
| 25MI0055MAKILALA-ALLAH VALLEY RD - K1622+155 - K1622+265 | Region XII | Cotabato 3rd DEO | On-Going | ₱40.9M | 60% | High risk91 | Flagged0.017 |
| 24ME0099CONSTRUCTION OF GLAN RIVER FLOOD CONTROL STRUCTURE, GLAN, SARANGANI PROVINCE, PHASE II, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱96.4M | 99% | High risk77 | Flagged0.014 |
| 24M00258CONSTRUCTION OF KABULNAN BRIDGE, KM1796+044.69 - 1796+134.69 , DATU HOFFER AMPATUAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱77M | 73% | High risk79 | Flagged0.013 |
| 24MC0013CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO- BUKIDNON RD - K1684 + 820 - K1684 + 892, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk80 | Flagged0.012 |
| 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |
| 17MC0198REHAB. OF BITUAN-BACONG FMR, TULUNAN, NORTH COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱30.5M | 100% | Medium risk38 | Flagged0.011 |
| 24MH0009CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1925+000 - K1925+246 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱86.8M | 100% | High risk76 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 19MC0163CONSTRUCTION OF LOCAL ROAD IN BARANGAY CENTRAL MALAMOTE, MATALAM, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.089 |
| 252 | 22MG0011CONSTRUCTION OF RIVER BANK PROTECTION ALONG SUMBONG CREEK, BRGY. POBLACION, T'BOLI, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱44.1M | 100% | Low risk25 | —-0.073 |
| 253 | 24MC0111PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG MAGPET-NOWA-DOROLUMAN-GREENFIELD RD - K1629+(-212) - K1629+768, MAGPET, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱17.6M | 100% | Low risk25 | —-0.085 |
| 254 | 23MC0018REPLACEMENT OF BRIDGE (TEMPORARY TO PERMANENT) - DEL CARMEN BR. (B00262MN) ALONG PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD, PRES. ROXAS, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱37.6M | 100% | Low risk24 | —-0.054 |
| 255 | 22MH0041CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CADIZ, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.9M | 100% | Low risk24 | —-0.086 |
| 256 | 22MH0054CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY STA. MARIA, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.9M | 100% | Low risk24 | —-0.086 |
| 257 | 19MC0035REPLACEMENT OF BRIDGE INTO 4 LANES-TULUNAN BRIDGE (B00242MN) ALONG MAKILALA-ALLAH VALLEY ROAD, TULUNAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱44.2M | 100% | Low risk24 | —-0.055 |
| 258 | 19MC0034CONSTRUCTION OF NEW PERMANENT BRIDGES-BUAL UK BR. (PARALLEL) ALONG MAKILALA-ALLAH VALLEY ROAD, TULUNAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱36.3M | 100% | Low risk24 | —-0.056 |
| 259 | 22MH0069CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.9M | 100% | Low risk24 | —-0.086 |
| 260 | 22MI0032WIDENING OF PERMANENT BRIDGES - MATEO BR. (B01255MN) ALONG MATALAM - LAMPAYAN - ANTIPAS RD. | Region XII | Cotabato 3rd DEO | Completed | ₱41.5M | 100% | Low risk24 | —-0.050 |
| 261 | 22MH0049CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱4.9M | 100% | Low risk24 | —-0.086 |
| 262 | 21MI0063REPLACEMENT OF BRIDGE-BIALONG BR. (B00246MN) ALONG KIDAPAWAN-CALUNASAN-MLANG RD. | Region XII | Cotabato 3rd DEO | Completed | ₱30.8M | 100% | Low risk24 | —-0.048 |
| 263 | 18MH0116CONSTRUCTION OF THREE (3) STOREY - NINE (9) CLASSROOMS AT KALAMANSIG NATIONAL HIGH SCHOOL KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱25M | 100% | Low risk24 | —-0.034 |
| 264 | 20ME0078CONSTRUCTION OF PUBLIC MARKET, PHASE II; | Region XII | Sarangani DEO | Completed | ₱29.6M | 100% | Low risk24 | —-0.076 |
| 265 | 19MC0001RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE-KABACAN BR. (B01482MN) ALONG MATALAM-LAMPAYAN-ANTIPAS RD., MATALAM, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱18.1M | 100% | Low risk24 | —-0.059 |
| 266 | 20M00195CONSTRUCTION/REHABILITATION OF DAMAWATO BRIDGE. BRGY. DAMAWATO, TULUNAN, NORTH COTABATO | Region XII | Region XII | Completed | ₱29.2M | 100% | Low risk24 | —-0.055 |
| 267 | 20ME0026CONSTRUCTION OF RIVER BANK PROTECTION WITH REVETMENT ALONG KALAONG RIVER (KALAONG BRIDGE 1) SECTION; MAITUM, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱46.6M | 100% | Low risk24 | —-0.066 |
| 268 | 22MI0043WIDENING OF PERMANENT BRIDGE - NIA BR. (B01807MN) ALONG KIDAPAWAN - CALUNASAN - MLANG RD. | Region XII | Cotabato 3rd DEO | Completed | ₱15.2M | 100% | Low risk24 | —-0.052 |
| 269 | 24MI0039BAGONTAPAY BR. (B00240MN) ALONG MAKILALA-ALLAH VALLEY RD. | Region XII | Cotabato 3rd DEO | Completed | ₱24.3M | 100% | Low risk24 | —-0.059 |
| 270 | 18MF0030CONSTRUCTION OF RIVER CONTROL ALONG RIVER PANAS - BAMBAD SECTION, ISULAN, S.K., BRGY. BAMBAD, ISULAN, SULTAN KUDARAT. | Region XII | Sultan Kudarat 1st DEO | Completed | ₱18.6M | 100% | Low risk24 | —-0.076 |
| 271 | 24MI0041MALASILA BR. (B00241MN) ALONG MAKILALA-ALLAH VALLEY RD. | Region XII | Cotabato 3rd DEO | Completed | ₱19.4M | 100% | Low risk24 | —-0.059 |
| 272 | 19ME0143CONST. OF MULTI-PURPOSE BLDG. PUBLIC MARKET AT MAITUM; MAITUM, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱19.8M | 100% | Low risk24 | —-0.073 |
| 273 | 18MC0034RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-MATEO BR. (B01255MN) ALONG MATALAM-LAMPAYAN-ANTIPAS ROAD, MATALAM, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱13.7M | 100% | Low risk24 | —-0.060 |
| 274 | 22MH0020REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - NALILIDAN BR. 2 (B00633MN) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱12.2M | 100% | Low risk24 | —-0.056 |
| 275 | 18MH0134CONSTRUCTION OF TWO (2) STOREY - TWO (2) LABORATORY (ICT LAB) AT TRAN NATIONAL HIGH SCHOOL LEBAK, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱10M | 100% | Low risk23 | —-0.040 |