Contractor dossier
389 projects on file, including joint ventures this contractor is part of.
Total projects
389
Total budget
₱14.9B
Average progress
97.7%
Completion rate
90.7%
Average risk score
32.1
Medium risk on average, out of 100
Flagged as unusual
29
7.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 344 | ₱13.2B | 30.2 | 28 | 97.8% |
| Region XI | 24 | ₱933.2M | 48.1 | 1 | 99.8% |
| Region X | 6 | ₱64.5M | 27.7 | 0 | 100.0% |
| Region XIII | 5 | ₱263.9M | 56.2 | 0 | 100.0% |
| Region I | 4 | ₱339.6M | 55.7 | 0 | 74.5% |
| Region IX | 3 | ₱28.4M | 53.3 | 0 | 100.0% |
| Region VIII | 2 | ₱85.3M | 48.4 | 0 | 100.0% |
| Region VI | 1 | ₱17M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 155 | ₱7.1B | 30.8 | 4 | 98.8% |
| Buildings and Facilities | 95 | ₱1.1B | 17.1 | 0 | 100.0% |
| Bridges | 54 | ₱1.6B | 27.7 | 2 | 98.1% |
| Flood Control and Drainage | 48 | ₱2.3B | 34.8 | 1 | 99.9% |
| OTHER | 18 | ₱1.4B | 76.5 | 9 | 96.4% |
| GAA 2025 OO-1 | 12 | ₱987.2M | 92.7 | 10 | 73.1% |
| GAA 2025 SSP | 3 | ₱107.8M | 92.7 | 3 | 59.2% |
| Bridges, Roads | 3 | ₱358.4M | 52.4 | 0 | 71.6% |
| Water Provision and Storage | 1 | ₱2M | 9.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25M00260PREVENTIVE MAINTENANCE - DULAWAN-MARBEL RD - K1752 + 600 - K1753 + 600, LAMBAYONG, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱70.1M | 98% | High risk94 | Flagged0.003 |
| 25MI0031BUKIDNON-COTABATO RD - K1629 + 625 - K1629 + 905 | Region XII | Cotabato 3rd DEO | On-Going | ₱105.6M | 30% | High risk94 | Flagged0.030 |
| 25MI0028BUKIDNON-COTABATO RD - K1629 + 207 - K1629 + 325 | Region XII | Cotabato 3rd DEO | On-Going | ₱66.4M | 98% | High risk94 | Flagged0.000 |
| 25M00076PAVING OF UNPAVED ROADS - SNA - LEBAK -KALAMNSIG RD - K1888 + 846 - K1891 + 286, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱197.9M | 53% | High risk94 | Flagged0.040 |
| 25MF0039CONSTRUCTION OF BRIDGE, MAINDANG TO MAMALI, MAINDANG BRIDGE, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱93.6M | 46% | High risk94 | Flagged0.037 |
| 25M00187PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (MARBEL-ALLAH VALLEY-COTABATO RD) - K1769 + 689 - K1770 + 817, ISULAN, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱145.1M | 94% | High risk94 | Flagged0.019 |
| 25MI0013MAKILALA-ALLAH VALLEY RD - K1621 + 352 - K1621 + 547 | Region XII | Cotabato 3rd DEO | On-Going | ₱93M | 100% | High risk93 | Flagged0.008 |
| 25MI0054MAKILALA-ALLAH VALLEY RD - K1621 + 892 - K1622 + 000 | Region XII | Cotabato 3rd DEO | On-Going | ₱60.4M | 54% | High risk93 | Flagged0.020 |
| 25MI0085CONCRETING OF ROAD IN BARANGAY LEPAGA, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱9.4M | 80% | High risk92 | Flagged0.021 |
| 25MF0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAJAH MUDA, TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱4.8M | 52% | High risk92 | Flagged0.028 |
| 25MI0055MAKILALA-ALLAH VALLEY RD - K1622+155 - K1622+265 | Region XII | Cotabato 3rd DEO | On-Going | ₱40.9M | 60% | High risk91 | Flagged0.017 |
| 25MI0015MAKILALA-ALLAH VALLEY RD - K1621 + 150 - K1621 + 200 | Region XII | Cotabato 3rd DEO | On-Going | ₱17.2M | 98% | High risk89 | —-0.000 |
| 20MC0116CONSTRUCTION OF GUANGAN BRIDGE, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱38.6M | 100% | High risk86 | Flagged0.024 |
| 25MH0021WIDENING OF BRIDGE - KAWA BR. 1 (B01540MN) ALONG SNA-LEBAK-KALAMANSIG RD | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱19.9M | 100% | High risk85 | —-0.030 |
| 24M00005WIDENING OF BRIDGE - CARMEN PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+008 -K1652+230.55, CARMEN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱122.7M | 100% | High risk81 | Flagged0.008 |
| 24MC0013CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO- BUKIDNON RD - K1684 + 820 - K1684 + 892, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk80 | Flagged0.012 |
| 24M00258CONSTRUCTION OF KABULNAN BRIDGE, KM1796+044.69 - 1796+134.69 , DATU HOFFER AMPATUAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱77M | 73% | High risk79 | Flagged0.013 |
| 21L00143CONSTRUCTION OF ACCESS ROAD LEADING TO WASTE-TO-ENERGY (WTE) FACILITY, DAVAO CITY | Region XI | Region XI | On-Going | ₱173.7M | 95% | High risk79 | Flagged0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21L00143CONSTRUCTION OF ACCESS ROAD LEADING TO WASTE-TO-ENERGY (WTE) FACILITY, DAVAO CITY | Region XI | Region XI | On-Going | ₱173.7M | 95% | High risk79 | Flagged0.049 |
| 25M00076PAVING OF UNPAVED ROADS - SNA - LEBAK -KALAMNSIG RD - K1888 + 846 - K1891 + 286, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱197.9M | 53% | High risk94 | Flagged0.040 |
| 25MF0039CONSTRUCTION OF BRIDGE, MAINDANG TO MAMALI, MAINDANG BRIDGE, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱93.6M | 46% | High risk94 | Flagged0.037 |
| 25MI0031BUKIDNON-COTABATO RD - K1629 + 625 - K1629 + 905 | Region XII | Cotabato 3rd DEO | On-Going | ₱105.6M | 30% | High risk94 | Flagged0.030 |
| 25MI0093CONSTRUCTION OF BRIDGE, LEADING TO THE BOUNDARY OF THE CENTRAL MINDANAO AIRPORT, BRGY. NEW RIZAL, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱56.4M | 0% | Medium risk50 | Flagged0.029 |
| 25MF0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAJAH MUDA, TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱4.8M | 52% | High risk92 | Flagged0.028 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 20MC0116CONSTRUCTION OF GUANGAN BRIDGE, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱38.6M | 100% | High risk86 | Flagged0.024 |
| 25MI0085CONCRETING OF ROAD IN BARANGAY LEPAGA, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱9.4M | 80% | High risk92 | Flagged0.021 |
| 25MI0054MAKILALA-ALLAH VALLEY RD - K1621 + 892 - K1622 + 000 | Region XII | Cotabato 3rd DEO | On-Going | ₱60.4M | 54% | High risk93 | Flagged0.020 |
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25M00187PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (MARBEL-ALLAH VALLEY-COTABATO RD) - K1769 + 689 - K1770 + 817, ISULAN, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱145.1M | 94% | High risk94 | Flagged0.019 |
| 16MH0050REHABILITATION OF BUGSO-KAMISON-MATANAO-GAPOK FMR, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱35.6M | 100% | Medium risk37 | Flagged0.018 |
| 25MI0055MAKILALA-ALLAH VALLEY RD - K1622+155 - K1622+265 | Region XII | Cotabato 3rd DEO | On-Going | ₱40.9M | 60% | High risk91 | Flagged0.017 |
| 24ME0099CONSTRUCTION OF GLAN RIVER FLOOD CONTROL STRUCTURE, GLAN, SARANGANI PROVINCE, PHASE II, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱96.4M | 99% | High risk77 | Flagged0.014 |
| 24M00258CONSTRUCTION OF KABULNAN BRIDGE, KM1796+044.69 - 1796+134.69 , DATU HOFFER AMPATUAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱77M | 73% | High risk79 | Flagged0.013 |
| 24MC0013CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO- BUKIDNON RD - K1684 + 820 - K1684 + 892, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk80 | Flagged0.012 |
| 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |
| 17MC0198REHAB. OF BITUAN-BACONG FMR, TULUNAN, NORTH COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱30.5M | 100% | Medium risk38 | Flagged0.011 |
| 24MH0009CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1925+000 - K1925+246 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱86.8M | 100% | High risk76 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 17MC0061WIDENING OF BRIDGE - LIKA BR. (B00276MN) ALONG MATALAM-MLANG-BAGONTAPAY JCT RD | Region XII | Cotabato 2nd DEO | Completed | ₱29.3M | 100% | High risk76 | —-0.028 |
| 27 | 18LB0215ROAD WIDENING-CONSTRUCTION OF JCT. DAVAO COTABATO OLD ROAD (BAGO GALLERA SECTION) LEADING TO PHILIPPINE COCONUT AUTHORITY (PCA)DAVAO CITY | Region XI | Davao City DEO | Completed | ₱48M | 100% | High risk75 | —-0.026 |
| 28 | 20MC0117CONSTRUCTION OF THE OVERSPILL BRIDGE AND FOOTBRIDGE, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱44.1M | 100% | High risk74 | —-0.030 |
| 29 | 24M00068CONSTRUCTION OF CONCRETE BRIDGE -DOROLUMAN-PRESIDENT ROXAS-KADINGILAN ROAD, COTABATO (NORTH COTABATO) PHASE II, STA 0+990 - STA 1+098, ARAKAN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱26M | 96% | High risk74 | —-0.004 |
| 30 | 17NB0056WIDENING OF AGIABAO BRIDGE FROM 1 TO 2 LANES, BRGY STA INES,SAN LUIS, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱6.9M | 100% | High risk74 | —-0.029 |
| 31 | 17NB0040REHAB/MAJOR REPAIR OF BATUCAN BRIDGE ALONG NRJ BAHBAH-TALACOGON RD, BRGY BATUCAN,TALACOGON, ADS | Region XIII | Agusan del Sur 1st DEO | Completed | ₱9.8M | 100% | High risk74 | —-0.026 |
| 32 | 24A00338CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ADAMS (ILOCOS NORTE) - CALANASAN (APAYAO ROAD) ILOCOS NORTE (PACKAGE 5) | Region I | Region I | On-Going | ₱154.4M | 83% | High risk71 | —-0.021 |
| 33 | 17M00009ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-LEBAK-KALAMANSIG ROAD, TINALON, SULTAN KUDARAT, K1864+471 TO K1866+182, (CHAINAGE 17471 TO CHAINAGE 19181) | Region XII | Region XII | Completed | ₱144.7M | 100% | High risk70 | —-0.006 |
| 34 | 17M00051ROAD WIDENING OF DIGOS-MAKAR ROAD, K1592+290 K1598+228 (CHAINAGE 612 CHAINAGE 6542), MALUNGON, SARANGANI | Region XII | Region XII | Completed | ₱191M | 100% | High risk70 | —-0.003 |
| 35 | 24M00073CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE IV), STA. 44+186.63 - STA. 44+611.63, BARANGAY ALEGRIA, PRES. ROXAS, COTABATO | Region XII | Region XII | On-Going | ₱96M | 96% | High risk67 | Flagged0.001 |
| 36 | 18M00051CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES BRGY. BASAK-VILLACMONTE-CAPILAN CONNECTING TO NEW CALINOG, INCL. BRIDGE, IN SUPPORT OF BAMBOO AND COFFEE PLANTATION, LEBAK, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱86.3M | 100% | Medium risk57 | —-0.032 |
| 37 | 25M00003REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -KIDAPAWAN-CALUNASAN-MLANG RD - K1634 + 778 - K1634 + 833.50, M'LANG, NORTH COTABATO | Region XII | Region XII | On-Going | ₱144.6M | 55% | Medium risk55 | —-0.024 |
| 38 | 21LB0005CONSTRUCTION OF DRAINAGE STRUCTURES - DAANG MAHARLIKA (MN) - K1508+623 | Region XI | Davao City DEO | Completed | ₱57.9M | 100% | Medium risk54 | —-0.076 |
| 39 | 17JC0010PROPOSED CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT GATAS BRIDGE ALONG LILOY-IPIL ROAD (B00535MN) KALAWIT, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱9.6M | 100% | Medium risk54 | —-0.034 |
| 40 | 25A00158CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BAUANG-SAN FERNANDO-SAN JUAN BYPASS ROAD, (SAN FERNANDO-SAN JUAN SECTION) PACKAGE 1, LA UNION | Region I | Region I | On-Going | ₱88.8M | 15% | Medium risk54 | —-0.006 |
| 41 | 17JC0004PROPOSED CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGES AT BOBONGAN BRIDGE ALONG LILOY - SIOCON ROAD (B01178MN) LABASON, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱13.9M | 100% | Medium risk53 | —-0.034 |
| 42 | 17JC0007PROPOSED CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CARACOL BRIDGE ALONG SINDANGAN-LILOY ROAD (B00527MN)SALUG, ZAMBOANGA DEL NORTE | Region IX | Zamboanga del Norte 3rd DEO | Completed | ₱4.9M | 100% | Medium risk53 | —-0.034 |
| 43 | 23M00023CONSTRUCTION OF MAGPET (PANGAO-AN - DON PANACA) TO DAVAO CITY VIA SALAYSAY (INDAWHONG-BALLAH-MASAWANG) TO LUMONDAO (JUNCTION BUKIDNON TO DAVAO) ROAD, COTABATO, STA. 1+874 - STA. 3+99 | Region XII | Region XII | Completed | ₱142.6M | 100% | Medium risk53 | —-0.067 |
| 44 | 24MI0097CONSTRUCTION OF MLANG RIVER FLOOD CONTROL PROJECT (DOWNSTREAM OF MLANG BRIDGE, LEFT SIDE), BARANGAY POBLACION A, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱127.1M | 100% | Medium risk53 | —-0.056 |
| 45 | 20LB0095CONSTRUCTION OF TYPHOON SHELTER HANGAR FOR PRESIDENTIAL AIRCRAFT (FIXED WING), TACTICAL OPERATIONS WING EASTERN MINDANAO (TOWEASTMIN), OLD AIRPORT, BRGY. SASA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.068 |
| 46 | 20LB0155CONSTRUCTION OF MULTI-PURPOSE BUILDING AND OTHER FACILITIES, DPWH DAVAO CITY DEO BUILDING, L. MA. GUERRERO ST., DAVAO CITY | Region XI | Davao City DEO | Completed | ₱67.6M | 100% | Medium risk52 | —-0.078 |
| 47 | 21LB0016REHABILITATION/MAJOR REPAIR OF FLOOD CONTROL STRUCTURE ALONG DAVAO RIVER, BOLTON BRIDGE UPSTREAM, LEFT BANK, DAVAO CITY (STA. 1 + 614 - STA. 2 + 173) | Region XI | Davao City DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.061 |
| 48 | 25MI0093CONSTRUCTION OF BRIDGE, LEADING TO THE BOUNDARY OF THE CENTRAL MINDANAO AIRPORT, BRGY. NEW RIZAL, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱56.4M | 0% | Medium risk50 | Flagged0.029 |
| 49 | 24M00071CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (PHASE III), STA. 0+000 - STA. 0+400, BARANGAY POBLACION, PRES. ROXAS, COTABATO | Region XII | Region XII | Completed | ₱96.5M | 100% | Medium risk50 | —-0.063 |
| 50 | 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |