Contractor dossier
389 projects on file, including joint ventures this contractor is part of.
Total projects
389
Total budget
₱14.9B
Average progress
97.7%
Completion rate
90.7%
Average risk score
32.1
Medium risk on average, out of 100
Flagged as unusual
29
7.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 344 | ₱13.2B | 30.2 | 28 | 97.8% |
| Region XI | 24 | ₱933.2M | 48.1 | 1 | 99.8% |
| Region X | 6 | ₱64.5M | 27.7 | 0 | 100.0% |
| Region XIII | 5 | ₱263.9M | 56.2 | 0 | 100.0% |
| Region I | 4 | ₱339.6M | 55.7 | 0 | 74.5% |
| Region IX | 3 | ₱28.4M | 53.3 | 0 | 100.0% |
| Region VIII | 2 | ₱85.3M | 48.4 | 0 | 100.0% |
| Region VI | 1 | ₱17M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 155 | ₱7.1B | 30.8 | 4 | 98.8% |
| Buildings and Facilities | 95 | ₱1.1B | 17.1 | 0 | 100.0% |
| Bridges | 54 | ₱1.6B | 27.7 | 2 | 98.1% |
| Flood Control and Drainage | 48 | ₱2.3B | 34.8 | 1 | 99.9% |
| OTHER | 18 | ₱1.4B | 76.5 | 9 | 96.4% |
| GAA 2025 OO-1 | 12 | ₱987.2M | 92.7 | 10 | 73.1% |
| GAA 2025 SSP | 3 | ₱107.8M | 92.7 | 3 | 59.2% |
| Bridges, Roads | 3 | ₱358.4M | 52.4 | 0 | 71.6% |
| Water Provision and Storage | 1 | ₱2M | 9.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 25M00260PREVENTIVE MAINTENANCE - DULAWAN-MARBEL RD - K1752 + 600 - K1753 + 600, LAMBAYONG, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱70.1M | 98% | High risk94 | Flagged0.003 |
| 25MI0031BUKIDNON-COTABATO RD - K1629 + 625 - K1629 + 905 | Region XII | Cotabato 3rd DEO | On-Going | ₱105.6M | 30% | High risk94 | Flagged0.030 |
| 25MI0028BUKIDNON-COTABATO RD - K1629 + 207 - K1629 + 325 | Region XII | Cotabato 3rd DEO | On-Going | ₱66.4M | 98% | High risk94 | Flagged0.000 |
| 25M00076PAVING OF UNPAVED ROADS - SNA - LEBAK -KALAMNSIG RD - K1888 + 846 - K1891 + 286, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱197.9M | 53% | High risk94 | Flagged0.040 |
| 25MF0039CONSTRUCTION OF BRIDGE, MAINDANG TO MAMALI, MAINDANG BRIDGE, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱93.6M | 46% | High risk94 | Flagged0.037 |
| 25M00187PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (MARBEL-ALLAH VALLEY-COTABATO RD) - K1769 + 689 - K1770 + 817, ISULAN, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱145.1M | 94% | High risk94 | Flagged0.019 |
| 25MI0013MAKILALA-ALLAH VALLEY RD - K1621 + 352 - K1621 + 547 | Region XII | Cotabato 3rd DEO | On-Going | ₱93M | 100% | High risk93 | Flagged0.008 |
| 25MI0054MAKILALA-ALLAH VALLEY RD - K1621 + 892 - K1622 + 000 | Region XII | Cotabato 3rd DEO | On-Going | ₱60.4M | 54% | High risk93 | Flagged0.020 |
| 25MI0085CONCRETING OF ROAD IN BARANGAY LEPAGA, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱9.4M | 80% | High risk92 | Flagged0.021 |
| 25MF0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAJAH MUDA, TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱4.8M | 52% | High risk92 | Flagged0.028 |
| 25MI0055MAKILALA-ALLAH VALLEY RD - K1622+155 - K1622+265 | Region XII | Cotabato 3rd DEO | On-Going | ₱40.9M | 60% | High risk91 | Flagged0.017 |
| 25MI0015MAKILALA-ALLAH VALLEY RD - K1621 + 150 - K1621 + 200 | Region XII | Cotabato 3rd DEO | On-Going | ₱17.2M | 98% | High risk89 | —-0.000 |
| 20MC0116CONSTRUCTION OF GUANGAN BRIDGE, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱38.6M | 100% | High risk86 | Flagged0.024 |
| 25MH0021WIDENING OF BRIDGE - KAWA BR. 1 (B01540MN) ALONG SNA-LEBAK-KALAMANSIG RD | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱19.9M | 100% | High risk85 | —-0.030 |
| 24M00005WIDENING OF BRIDGE - CARMEN PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+008 -K1652+230.55, CARMEN, NORTH COTABATO | Region XII | Region XII | On-Going | ₱122.7M | 100% | High risk81 | Flagged0.008 |
| 24MC0013CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO- BUKIDNON RD - K1684 + 820 - K1684 + 892, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk80 | Flagged0.012 |
| 24M00258CONSTRUCTION OF KABULNAN BRIDGE, KM1796+044.69 - 1796+134.69 , DATU HOFFER AMPATUAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱77M | 73% | High risk79 | Flagged0.013 |
| 21L00143CONSTRUCTION OF ACCESS ROAD LEADING TO WASTE-TO-ENERGY (WTE) FACILITY, DAVAO CITY | Region XI | Region XI | On-Going | ₱173.7M | 95% | High risk79 | Flagged0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21L00143CONSTRUCTION OF ACCESS ROAD LEADING TO WASTE-TO-ENERGY (WTE) FACILITY, DAVAO CITY | Region XI | Region XI | On-Going | ₱173.7M | 95% | High risk79 | Flagged0.049 |
| 25M00076PAVING OF UNPAVED ROADS - SNA - LEBAK -KALAMNSIG RD - K1888 + 846 - K1891 + 286, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱197.9M | 53% | High risk94 | Flagged0.040 |
| 25MF0039CONSTRUCTION OF BRIDGE, MAINDANG TO MAMALI, MAINDANG BRIDGE, LUTAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱93.6M | 46% | High risk94 | Flagged0.037 |
| 25MI0031BUKIDNON-COTABATO RD - K1629 + 625 - K1629 + 905 | Region XII | Cotabato 3rd DEO | On-Going | ₱105.6M | 30% | High risk94 | Flagged0.030 |
| 25MI0093CONSTRUCTION OF BRIDGE, LEADING TO THE BOUNDARY OF THE CENTRAL MINDANAO AIRPORT, BRGY. NEW RIZAL, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱56.4M | 0% | Medium risk50 | Flagged0.029 |
| 25MF0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RAJAH MUDA, TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱4.8M | 52% | High risk92 | Flagged0.028 |
| 25M00229PREVENTIVE MAINTENANCE - DAVAO-COTABATO ROAD (JCT DIGOS-COTABATO SECTION) (SO1753MNH), K1721+000-K1724+000, SULTAN KUDARAT, MAGUINDANAO DEL NORTE | Region XII | Region XII | On-Going | ₱93.6M | 30% | High risk95 | Flagged0.027 |
| 20MC0116CONSTRUCTION OF GUANGAN BRIDGE, MAKILALA, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱38.6M | 100% | High risk86 | Flagged0.024 |
| 25MI0085CONCRETING OF ROAD IN BARANGAY LEPAGA, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | On-Going | ₱9.4M | 80% | High risk92 | Flagged0.021 |
| 25MI0054MAKILALA-ALLAH VALLEY RD - K1621 + 892 - K1622 + 000 | Region XII | Cotabato 3rd DEO | On-Going | ₱60.4M | 54% | High risk93 | Flagged0.020 |
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25M00187PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (MARBEL-ALLAH VALLEY-COTABATO RD) - K1769 + 689 - K1770 + 817, ISULAN, SULTAN KUDARAT | Region XII | Region XII | On-Going | ₱145.1M | 94% | High risk94 | Flagged0.019 |
| 16MH0050REHABILITATION OF BUGSO-KAMISON-MATANAO-GAPOK FMR, KALAMANSIG, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱35.6M | 100% | Medium risk37 | Flagged0.018 |
| 25MI0055MAKILALA-ALLAH VALLEY RD - K1622+155 - K1622+265 | Region XII | Cotabato 3rd DEO | On-Going | ₱40.9M | 60% | High risk91 | Flagged0.017 |
| 24ME0099CONSTRUCTION OF GLAN RIVER FLOOD CONTROL STRUCTURE, GLAN, SARANGANI PROVINCE, PHASE II, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱96.4M | 99% | High risk77 | Flagged0.014 |
| 24M00258CONSTRUCTION OF KABULNAN BRIDGE, KM1796+044.69 - 1796+134.69 , DATU HOFFER AMPATUAN, MAGUINDANAO DEL SUR | Region XII | Region XII | On-Going | ₱77M | 73% | High risk79 | Flagged0.013 |
| 24MC0013CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO - ROXAS - ARAKAN VALLEY - JCT DAVAO- BUKIDNON RD - K1684 + 820 - K1684 + 892, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 93% | High risk80 | Flagged0.012 |
| 17M00016WIDENING OF SIGUIL BRIDGE ALONG SARANGANI-SULTAN KUDARAT COASTAL ROAD, K1676+638-K1676+978 ( CHAINAGE 1521-CHAINAGE 1861); BRIDGE: K1676+(-739)- K1676 + (-880), (CHAINAGE 144-CHAINAGE 3), MAASIM, SARANGANI | Region XII | Region XII | Completed | ₱129M | 100% | Medium risk50 | Flagged0.011 |
| 17MC0198REHAB. OF BITUAN-BACONG FMR, TULUNAN, NORTH COTABATO (RE-PUBLISHED) | Region XII | Cotabato 2nd DEO | Completed | ₱30.5M | 100% | Medium risk38 | Flagged0.011 |
| 24MH0009CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K1925+000 - K1925+246 | Region XII | Sultan Kudarat 2nd DEO | On-Going | ₱86.8M | 100% | High risk76 | Flagged0.009 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 24MC0016CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1667 + 100 - K1667 + 360, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱49M | 100% | Low risk27 | —-0.088 |
| 202 | 20ME0097CONCRETING OF NHW MALALAG-BATIAN PROVINCIAL ROAD; MAITUM, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱19.2M | 100% | Low risk27 | —-0.086 |
| 203 | 24MC0105PREVENTIVE MAINTENANCE OF ROAD- ASPHALT OVERLAY ALONG KIDAPAWAN- ILOMAVIS TOURIST RD- K1629+502 - 1631+491, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱46.5M | 100% | Low risk27 | —-0.086 |
| 204 | 20ME0039CONSTRUCTION OF CLAO BRIDGE ALONG DEMOLOC-LITTLE BAGUIO-ALABEL ROAD; ALABEL, SARANGANI PROVINCE. | Region XII | Sarangani DEO | Completed | ₱33.9M | 100% | Low risk27 | —-0.040 |
| 205 | 21MI0071CONSTRUCTION OF LOCAL ROAD IN BARANGAY DAMAWATO, TULUNAN, NORTH COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱31.8M | 100% | Low risk27 | —-0.086 |
| 206 | 19MC0066ROAD WIDENING-ON-SPECIFIC LOCATION ALONG MATALAM-M'LANG-BAGONTAPAY JCT. ROAD K1651+926 TO K1653+696, M'LANG, COTABATO RE-PUBLISHED | Region XII | Cotabato 2nd DEO | Completed | ₱43.9M | 100% | Low risk27 | —-0.088 |
| 207 | 22MF0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER (KALAWAG SECTION), ISULAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱49M | 100% | Low risk27 | —-0.071 |
| 208 | 19MC0061CONSTRUCTION OF REVETMENT-CONSTRUCTION OF REVETMENT ALONG BUAL RIVER, BRGY. MINAPAN TULUNAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱33.2M | 100% | Low risk27 | —-0.073 |
| 209 | 20M00110CONSTRUCTION OF REVETMENT ALONG POBLACION-DUNGOS RIVER, TULUNAN, NORTH COTABATO | Region XII | Region XII | Completed | ₱40.7M | 100% | Low risk27 | —-0.072 |
| 210 | 23MI0053CONSTRUCTION OF DUNGO-AN BRIDGE IN BRGY. DUNGO-AN, MLANG, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱49.5M | 100% | Low risk26 | —-0.054 |
| 211 | 19MC0079CONSTRUCTION OF REVETMENT- CONSTRUCTION REVETMENT ALONG MARBEL RIVER (STA. 3+690-STA. 3+960, LEFT BANK, MATALAM, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱44.1M | 100% | Low risk26 | —-0.073 |
| 212 | 23MF0021PUROK KAPAYAPAAN ROAD CONNECTING TO NATIONAL HIGHWAY, BRGY. KALANDAGAN IN SUPPORT TO PALM OIL, PALAY, AND FISHING INDUSTRIES,TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱24M | 100% | Low risk26 | —-0.088 |
| 213 | 18MH0001CONSTRUCTION OF RIVER BANK PROTECTION/FLOOD CONTROL BRGY. BIWANG, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱47.3M | 100% | Low risk26 | —-0.075 |
| 214 | 23MI0009PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BUKIDNON - COTABATO RD - K1652+977 - K1653+645 | Region XII | Cotabato 3rd DEO | Completed | ₱37.9M | 100% | Low risk26 | —-0.089 |
| 215 | 18MC0117CONSTRUCTION OF THE REVETMENT (RIVER BANK PROTECTION) ALONG BUAL RIVER, STA. 9+080-STA. 9+330 (RIGHT SIDE); STA 9+330-STA. 9+580 (LEFT SIDE) BRGY. BUAL TULUNAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱33.3M | 100% | Low risk26 | —-0.073 |
| 216 | 23MF0034CONSTRUCTION OF MULTI-PURPOSE BUILDING (LAMBAYONG INTERGRATED TERMINAL), BARANGAY POBLACION, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱14.8M | 100% | Low risk26 | —-0.086 |
| 217 | 22MI0056TULUNAN (POBLACION) ROAD CONNECTING TO BARANGAY DUNGOS, TULUNAN IN SUPPORT OF PALM OIL AND BANANA INDUSTRIES, TULUNAN, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱28.1M | 100% | Low risk26 | —-0.089 |
| 218 | 21MI0022ROAD WIDENING- MAKILALA-ALLAH VALLEY RD. - K1644+408 - K1644+817, MLANG, NORTH COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱11.8M | 100% | Low risk26 | —-0.089 |
| 219 | 25MH0034CONSTRUCTION OF CONCRETE ROAD - ROAD FROM NHJ-BRGY. KADI-BRGY. BUGSO-SITIO BALITE-SITIO SAPALE AND CROSSING BUGSO-LANDFILL IN SUPPORT TO AGRIBUSINESS ESTABLISHMENT, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱24.4M | 100% | Low risk26 | —-0.088 |
| 220 | 24MH0026CONSTRUCTION OF CONCRETE ROAD - ROAD FROM NHJ - BRGY. KADI - BRGY. BUGSO - SITIO BALITE - SITIO SAPALE AND CROSSING BUGSO - LANDFILL IN SUPPORT TO AGRIBUSINESS ESTABLISHMENT, SENATOR NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱24.5M | 100% | Low risk26 | —-0.088 |
| 221 | 25MC0005PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG DAVAO - COTABATO RD (JCT DIGOS-COTABATO SECT)- K1619 + 400 - K1619 + 774, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱39.9M | 100% | Low risk26 | —-0.087 |
| 222 | 22MI0076ROAD WIDENING ALONG MAKILALA - ALLAH VALLEY RD (S00835MN) - K1640+864.90 - K1641+265.40, K1641+397.30 - K1641+422.30 | Region XII | Cotabato 3rd DEO | Completed | ₱13.1M | 100% | Low risk26 | —-0.089 |
| 223 | 22MF0034CONSTRUCTION OF ROAD, BARANGAY POBLACION, COLUMBIO, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱4.9M | 100% | Low risk26 | —-0.086 |
| 224 | 24MC0109PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) K1617+610 - K1618+090, KIDAPAWAN CITY, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱45M | 100% | Low risk26 | —-0.086 |
| 225 | 21MI0014CONSTRUCTION OF CONCRETE ROAD - TULUNAN (POBLACION) ROAD CONNECTING TO BARANGAY DUNGOS, TULUNAN IN SUPPORT TO PALM OIL AND BANANA INDUSTRIES, TULUNAN, COTABATO | Region XII | Cotabato 3rd DEO | Completed | ₱19.3M | 100% | Low risk26 | —-0.088 |